All MahaRERA projects
23,645 registered projects with disclosed construction progress or complaint records. Page 34 of 48.
Pune
- SADGURU RESIDENCY · HaveliMAA PRANAAM BUILDCON PRIVATE LIMITED · P52100017241 · possession Dec 2026 · 29.5% built
- L Axis Phase II Cluster A · MoshiPharande Promoters and Builders · P52100017250 · possession Jun 2023 · 100% built
- NAMRATA BUSINESS CENTRE · -NAMRATA DEVELOPERS · P52100017272 · possession Dec 2021 · 81.8% built
- Divyatej · Senapati Bapat RoadTejraj Promoters & Builders · P52100017295 · possession Feb 2021 · 90.3% built
- Palladio Phase 2 · behind D Y Patil collegeVilas Javdekar Eco Developers Pvt. Ltd. · P52100017306 · possession Dec 2022 · 91.5% built
- Periwinkle · -AJIT GIRDHARILAL NAHAR · P52100017310 · possession Dec 2024 · 86.4% built
- ALCON RETHOS · KHARADIALCON SPACES · P52100017327 · possession Aug 2018 · 90.9% built
- World Plaza Solitaire World · Pune CityClassic Promoters and Builders Private Limited · P52100017361 · possession Dec 2026 · 50.6% built
- Megapolis Springs - B and F · Rajiv Gandhi Infotech Park, Phase 3Pegasus Properties Pvt. Ltd. · P52100017386 · possession Mar 2023 · 100% built
- 93 Avenue Phase-II · Pune CityRAVIRAJ BOKADIA CREATIVE · P52100017392 · possession Mar 2019 · 63.6% built
- HIVE 65 · Pimple NilakhTRINITY GREEN HOMES · P52100017395 · possession Dec 2021 · 81.8% built
- Radha Classic · Vadgaon Anand.(Aalephata)Radha Housing · P52100017411 · possession Apr 2022 · 60% built
- Hi Life phase 2 · Dange ChowkRising welworth Enterprises LLP · P52100017433 · possession Jun 2024 · 100% built · 2 complaints
- MULIK LUXURIA - E WING · WAGHOLITUKARAM SOPANRAO MULIK · P52100017442 · possession Dec 2021 · 41.8% built
- ELINA LIVING · KondhwaRamkrishna Cine Exhibitors · P52100017453 · possession Jun 2023 · 100% built · 1 complaint
- hi life phase3 · Dange ChowkRising welworth Enterprises LLP · P52100017456 · possession Mar 2025 · 98.1% built · 2 complaints
- SWOJAS VEDANT · ERANDVANAASHISH RASIKLAL SHAH · P52100017492 · possession Feb 2021 · 8.2% built
- HAPPYCITY TALEGAON · Jijamata ChowkNAMRATA DEVELOPERS · P52100017513 · possession Dec 2022 · 90.9% built
- SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORLD · Pune CityClassic Promoters and Builders Private Limited · P52100017521 · possession Dec 2026 · 63.2% built · 6 complaints
- Kalpataru Estate Building 8 · Pimple GuravKalpataru Construction (Pune) · P52100017535 · possession Jun 2025 · 86.9% built · 48 complaints
- GALAXY · WAKADASWANI PARADISE · P52100017540 · possession Dec 2023 · 79.1% built · 3 complaints
- Venkatesh Graffiti Elite Phase 1 · Keshav NagarSHREE VENKATESH DEVELOPERS · P52100017577 · possession Aug 2022 · 90.9% built
- ITREND HOMES PHASE II WING B · HINJEWADIHighpoint Landmark LLP · P52100017586 · possession Dec 2022 · 90.9% built
- SOLITAIRE BUSINESS HUB PHASE II, SOLITAIRE WORLD · Pune CityClassic Promoters and Builders Private Limited · P52100017591 · possession Mar 2027 · 53.2% built
- Amanora Gold Towers 42 and 43 · Amanora Park TownCity Corporation Limited · P52100017612 · possession Dec 2023 · 100% built · 2 complaints
- Purva Aspire · Pune CityPuravankara Limited · P52100017650 · possession Sept 2026 · 45.8% built · 16 complaints
- PARKLAND · BoradewadiESSEN VENTURES · P52100017653 · possession Jun 2021 · 100% built · 1 complaint
- SPOT ONE · MawalSHRIKRISHNA REALTY · P52100017674 · possession Jul 2029 · 13.6% built
- MISTY GREENS · PATILNAGARPruthvi Developers · P52100017679 · possession Dec 2022 · 90.9% built
- Shankeshwar Prestige · MoshiNitin Chhaganlal Jain · P52100017693 · possession Dec 2022 · 90.9% built
- LAXMINARAYAN APARTMENT · MALEGAON B.K. TAL BARAMATIKAPIL VILASRAO BARGE · P52100017726 · possession Jan 2020 · 10.9% built
- VISION ACE PHASE 1 · TATHAWADEVISION ACE · P52100017748 · possession Oct 2023 · 95% built
- Yashwin Encore · Opposite Sayaji HotelVilas Javdekar Lifestyle Developers Pvt. Ltd. · P52100017756 · possession Dec 2024 · 95.6% built · 3 complaints
- SAI ORION · PUNEShreyash Developers · P52100017766 · possession Apr 2022 · 100% built
- Millennium Park · HaveliXrbia Epoch Creations LLP · P52100017777 · possession Dec 2026 · 79.4% built · 6 complaints
- SURATWALA MARK PLAZZO - WING B - PHASE 1 · HINJAWADISURATWWALA BUSINESS GROUP LIMITED · P52100017784 · possession Dec 2022 · 79.5% built · 1 complaint
- BANKA SAPPHIRE A WING · PISOLIBANKA CONSTRUCTIONS · P52100017790 · possession Dec 2024 · 100% built
- SHUBHKALASH A WING · SPINE ROADTULIP DEVELOPERS · P52100017791 · possession Dec 2022 · 72% built
- DK ELEGANCE · RAVET PUNEATMARAM MANOHAR GORE · P52100017792 · possession Dec 2023 · 86.5% built
- NIVASA UDAAN - PHASE II · LOHEGAONNIVASA REALTY · P52100017799 · possession Dec 2019 · 37.7% built
- PARAMOUNT - PHASE I · HaveliG B DEVELOPERS · P52100017803 · possession Dec 2029 · 39.1% built
- VENKATESH NAVITA · Ambegaon KhurdSHREE VENKATESH REALTY · P52100017807 · possession Dec 2021 · 90.9% built
- YASHIKA COMPLEX · GhodegaonShri Siddeshwar Developers · P52100017840 · possession Oct 2026 · 75.5% built
- NIVAAN NIRVANA · PurandharVISHAL ASHOK CHUGERA · P52100017866 · possession Dec 2026 · 2 complaints
- KUMAR PRAJWAL · HaveliKEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED · P52100017868 · possession Jul 2026 · 98.5% built
- KIRIK ORIOLE PHASE 1B · SHANKAR KALAT NAGARKIRIK ENTERPRISES · P52100017872 · possession Mar 2022 · 100% built
- Shades · MundhwaSuvan Developers · P52100017873 · possession Jul 2023 · 100% built
- GADHAVENANAWARE HEIGHTS · HARIKRUPANAGARSHRI DEVELOPERS · P52100017882 · possession Sept 2026 · 100% built
- AVON VISTA PROJECT 2 · PUNENAIKNAVAREPROFILECONSTRUCTIONSPVTLTD · P52100017914 · possession Jun 2022 · 100% built
- GOKUL · rajland colonyHARICONSTRUCTION · P52100017933 · possession Feb 2021 · 81.8% built
- Amanora Gold Towers 44, 45 and 46 · Amanora Park TownCity Corporation Limited · P52100017962 · possession May 2024 · 100% built · 6 complaints
- Sanghavi Paradise A Building · Sanghavi NagarSanjay Walchand Sanghavi · P52100017993 · possession Jul 2024 · 90.9% built
- VENKATESH JOYNEST PHASE 4 · HaveliSHREE VENKATESH GROUP · P52100017998 · possession Dec 2019 · 90.9% built
- FUSION TOWERS PHASE I · Hinjawadi - Phase IIIRAMA SYNERGY SPACES · P52100018013 · possession Jun 2021 · 95.5% built · 3 complaints
- VRUNDAVAN PARK · ShirurShree Saishraddha Developers & Builders · P52100018019 · possession Sept 2021 · 18.2% built
- VISION INDRABHUMI · DUDULGAONVISION INFRASTRUCTURE · P52100018032 · possession Mar 2021 · 90.9% built
- PARADISE ONE · ChikhaliRAMA SPACES · P52100018033 · possession Sept 2021 · 100% built
- SHRI GANESH PARK PHASE-2 · KOLEWADISANJAY PARSHURAM KUTE · P52100018052 · possession Dec 2028 · 60% built
- MILLENNIUM PARAMOUNT · CHIKHALIMillennium Superstructures LLP · P52100018086 · possession Dec 2021 · 81.8% built
- Bluegrass Residences - Tower I · Pune CitySagitarius Ecospaces LLP · P52100018091 · possession Apr 2025 · 81.3% built
- Kalpataru Exquisite - Wing 3 · WakadKalpataru Retail Ventures Private Limited · P52100018100 · possession Dec 2024 · 90.3% built
- Skyways Esfera 2 · LohegaonMoze Associates · P52100018101 · possession Oct 2022 · 81.8% built
- VENKATESH JOYNEST PHASE - 5 · HaveliSHREE VENKATESH GROUP · P52100018125 · possession Sept 2020 · 76.5% built
- Skyways Esfera 1 · LohegaonMoze Associates · P52100018128 · possession Oct 2021 · 90.9% built
- HILLSIDE RESIDENCY · OFF DUDULGAONRAJSHREE LANDMARK LLP · P52100018135 · possession Dec 2022 · 53.6% built
- AISHWARYAM COMFORT GOLD · HaveliESSEN REALTORS · P52100018169 · possession Jun 2023 · 100% built
- LOTUS Riddhi · AundhSATISH WAMAN GIRI · P52100018174 · possession Dec 2022 · 100% built
- Goodwill Meadows Phase 1 · LohegaonChoice Estates · P52100018177 · possession Dec 2022 · 100% built
- 41 ELITE · NEAR SHARAYU TOYOTA SHOWROOMM/S KRISALA ENTERPRISES · P52100018193 · possession Oct 2022 · 56.4% built
- Kalpataru Jade Residences G · HaveliAstrum Developments Private Limited · P52100018194 · possession Dec 2024 · 78.5% built
- Dnyanmanjula · HaveliVeer Buildcon · P52100018197 · possession Dec 2026 · 81.4% built
- MADHUVRUNDA CO-OPERATIVE HOUSING SOCIETY · ERANDWANEAakar Constructions · P52100018201 · possession Feb 2022 · 64.5% built
- PICASSO - O · HadapsarKumar Properties and Real Estate Pvt. Ltd. · P52100018205 · possession Aug 2022 · 100% built
- DOWNTOWN · MAHALUNGESAMARTTHA BUILDCON · P52100018235 · possession Sept 2026 · 81.6% built · 7 complaints
- ISHAAN GHARKUL A · BhorIshaan Buildcon · P52100018238 · possession Dec 2025 · 54.5% built
- SAIVYANKATESH RESIDENCY · KhedSAIVYANKATESH RESIDENCY · P52100018239 · possession Dec 2026 · 22.7% built
- SKY PAVILION Phase II · HaveliSKP Corp Private Limited · P52100018243 · possession Dec 2026 · 96.5% built
- Sun Planet Phase III · HaveliJindal Mittal Graha Nirman Pvt. Ltd. · P52100018258 · possession Dec 2019 · 81.8% built
- ROSEWOOD PARK · HaveliSHRI MANIBHADRA ESTATES · P52100018265 · possession Dec 2026 · 47.3% built · 1 complaint
- Tejas Imperial · WakadTejas Realty · P52100018270 · possession Oct 2026 · 96.8% built
- Megapolis Springs - A · Rajiv Gandhi Infotech Park, Phase 3Pegasus Properties Pvt. Ltd. · P52100018284 · possession Mar 2023 · 100% built · 1 complaint
- Princetown Royal - B2 · UndriManikchand Kumar Properties · P52100018309 · possession Mar 2023 · 90.9% built
- GREEN SQUARE · BORHADEWADI MOSHIRASKAR REALTORS THROUGH ITS PROPRIETOR VIJAY NIVRUTTI RASKAR · P52100018311 · possession Dec 2023 · 81.1% built
- Xotech Phase 2 · HinjavadiPhoenix Ventures · P52100018323 · possession Dec 2024 · 100% built
- GOLDEN EAST · HaveliVENKATESH VILAS AOP · P52100018329 · possession Dec 2028 · 66.8% built
- Sun Exotica Phase 2 · S. No. 10/2/4Jindal Mittal Graha Nirman Pvt. Ltd. · P52100018347 · possession Jun 2021 · 93.3% built
- ANIKA ARCADE · PISOLIArun Pitamber Sheth · P52100018361 · possession May 2019 · 55.5% built
- Zinnia Row Houses · HaveliMagarpatta Township Development & Construction Co. Ltd. · P52100018373 · possession Oct 2021 · 87.1% built
- Vaarivana Phase A - 1 · UrseSanjivani Integrated Township LLP · P52100018391 · possession Dec 2027 · 79.3% built · 2 complaints
- BLUE BIRD CO OPERATIVE SOCIETY LTD · PUNEASHA ARUN SANE · P52100018398 · possession Sept 2022 · 81.8% built
- SILVANA COUNTY · CHAROLI PHATADIAMOND PROPERTIES · P52100018403 · possession Dec 2019 · 90.9% built
- WORLD THREE - SOLITAIRE WORLD · Pune CityClassic Promoters and Builders Private Limited · P52100018407 · possession Jun 2026 · 83.6% built · 2 complaints
- VEDANT · UNDRIVISHWAKARMA PROPERTIES · P52100018440 · possession Mar 2022 · 100% built
- NOVA RESIDENCY · BEHIND RAJASHREE SHAU COLLEGEAMIT JUGALKISHOR RATHI · P52100018498 · possession Dec 2022 · 95.5% built
- Joyville Hinjawadi - I, Phase 5 · Man VillageJoyville Shapoorji Housing Private Limited · P52100018500 · possession Sept 2023 · 90.9% built · 2 complaints
- Joyville Hinjawadi - I, Phase 6 · Man VillageJoyville Shapoorji Housing Private Limited · P52100018502 · possession Sept 2023 · 90.9% built
- DHANLAXMI ICON · HaveliHARI OM DEVELOPERS · P52100018523 · possession Dec 2024 · 35.9% built
- Centropolis · Pune CitySkywards Ashtika Lifestyle · P52100018529 · possession Oct 2026 · 62.3% built · 2 complaints
- Palmspring Towers - A6, A7 and B3 · MohammedwadiKUMAR KERING DEVELOPERS LLP · P52100018532 · possession Apr 2025 · 90.9% built
- SIDDHI ANAND RESIDENCY · BABRAS MALAANAND CONTRACTORS AND DEVELOPERS · P52100018538 · possession Oct 2023 · 90.9% built
- KOHINOOR JEEVA · BIBWEWADIRISING ASSOCIATES · P52100018548 · possession Jun 2024 · 100% built
- Manek Regency · Pune CityB. U. Bhandari Landmarks · P52100018550 · possession Jun 2026 · 50% built
- URBAN SOLITAIRE · BHAWANI PETH PUNEURBAN REALTY · P52100018555 · possession Sept 2022 · 100% built
- Krishna Heights · HaveliNarayan Dharmaji Bodke · P52100018577 · possession Dec 2025 · 90.9% built
- One Place - F C Road · Bhamburda (Shivajinagar)PALASH REALTORS LLP · P52100018580 · possession Dec 2026 · 71.8% built · 2 complaints
- ATELIER GREENS · MUNDWAESTEEM CONSTRUCTIONS PRIVATE LIMITED (ADANI GROUP) · P52100018596 · possession Sept 2025 · 101.4% built · 10 complaints
- Princeville - A2, C2 and Conv Shop 2 · MoshiKumar Agro Products Pvt Ltd · P52100018603 · possession Jun 2023 · 90.9% built
- RUTUPARNA · BORHADEWADI,MOSHIS. S. Developers · P52100018604 · possession Mar 2027 · 90.9% built
- KOHINOOR IRIS PARK PHASE II · HaveliKohinoor Properties · P52100018615 · possession Dec 2026 · 77.3% built
- NOTTING HILL PHASE II · KONDHWA BUDRUKPARADISE REALTY · P52100018617 · possession Oct 2020 · 72.7% built
- SHREE SADGURU AUDUMBAR · RASTA PETHSUNIL BAPUSAHEB SHINDE · P52100018627 · possession Feb 2021 · 81.8% built
- NAMRATA MAGIC · Kokane ChowkNAMRATA DEVELOPERS · P52100018637 · possession Oct 2020 · 90.9% built · 1 complaint
- RIVERAIN CLASSIC · Pune CityBELVALKAR HOUSING COMPANY · P52100018649 · possession Dec 2026 · 44.8% built
- ARUN AION · Chinchwadcelesta developers · P52100018655 · possession Dec 2023 · 90.9% built · 1 complaint
- PARK EXPRESS PHASE III · BALEWADIPARK EXPRESS JOINT VENTURE · P52100018658 · possession Dec 2022 · 65.5% built
- KAPILASHRAM · Navi Sadashiv PethRAMRAI Buildcon LLP · P52100018672 · possession Dec 2019 · 70.5% built
- ROYAL EXOTICA PHASE I · KONDHWA BUDRUKSVG Builders LLP · P52100018700 · possession Dec 2022 · 89.1% built
- DREAM CITY · JALOCHI ROADTANAJI SADASHIV PANSARE · P52100018706 · possession Nov 2021 · 100% built
- Godrej Rejuve · KeshavnagarOXFORD REALTY LLP · P52100018720 · possession Mar 2024 · 90.9% built · 9 complaints
- Olympiadorous Phase I · TALUKA MAVALNeel Buildcon · P52100018732 · possession Feb 2027 · 90.9% built
- PARK LANDMARK PHASE II · BIBWEWADIPride Purple Landmark LLP · P52100018741 · possession Dec 2022 · 100% built
- ALANKAPURISHREE CO.OP.HSG.SOC.LTD. · RAMBAUG COLONYVYAS BUILDCON PVT. LTD. · P52100018752 · possession Jun 2022 · 81.8% built
- AAKAR INDIGO · CHOVISAWADIAAKAR REALTIES · P52100018758 · possession Dec 2022 · 90.9% built
- Aero East PH II · UndriM/S MIRACLE GURUKRUPA DEVELOPERS · P52100018765 · possession Dec 2024 · 81.8% built
- Siddhachal - A4 · MarketyardViraj Properties (Now known as Viraj Properties & Real Estate Pvt Ltd) - Amogh Construction JV · P52100018775 · possession Dec 2023 · 90.9% built
- Megapolis Saffron - A3 to A9 · Rajiv Gandhi Infotech Park, Phase 3Pegasus Properties Pvt. Ltd. · P52100018779 · possession Jun 2024 · 89.1% built
- addressOne - Phase 6 · MawalPeninsula Land Limited · P52100018788 · possession Jun 2026 · 67.3% built · 18 complaints
- Optima 2.0 · WADGAON BKM/S. SOBA ASSOCIATES · P52100018793 · possession Dec 2026 · 93.2% built · 9 complaints
- Mangal Vishwa - Phase 2 · KiwaleG.T.DEVELOPERS · P52100018839 · possession Dec 2022 · 90.9% built
- SHRUTI APARTMENT A WING PHASE 1 · BANERRADHIKA SHRIKRISHNA HAVAL · P52100018846 · possession Dec 2020 · 30% built
- addressOne - Phase 5 · Near MCA Stadium Gahunje PunePeninsula Land Limited · P52100018855 · possession Dec 2023 · 78.2% built · 5 complaints
- Akshay Anantam · Near Datta MandirSneh Constructions · P52100018878 · possession Mar 2028 · 78.9% built · 13 complaints
- SAI KAMAL · NEXT TO KAUSHAL BUNGLOWACE DEVELOPER · P52100018894 · possession Dec 2023 · 90.9% built
- PRISTINE PRONEXT · WAKADPRISTINE DEVELOPERS · P52100018913 · possession Dec 2023 · 100% built
- VENKATESH GRAFFITI PHASE 5 · KESHAV NAGAR MUNDHWASHREE VENKATESH BUILDCON PVT LTD · P52100018950 · possession Mar 2022 · 90.9% built
- Sudatta Sankul - B Building · Pune CityBMB Construction Company · P52100018951 · possession Dec 2022 · 100% built
- SHARADA MYRIA B AND C BUILDING · HaveliSHARADA ERECTORS PRIVATE LIMITED · P52100018973 · possession Jun 2025 · 41.4% built
- Construction of 760 EWS tenaments on survey No 12 part at Talegaon Dabhade · JoshiwadaPUNE HOUSING AND AREA DEVELOPMENT BOARD · P52100019009 · possession Aug 2024 · 86.8% built
- LomateResidency · VatannagarHemant Ramesh Lomte · P52100019013 · possession Mar 2022 · 90.9% built
- Trident Commercial and MHADA · WakadPARANJAPE SCHEMES (CONSTRUCTION) LTD · P52100019023 · possession May 2023 · 9.1% built
- SWAPNA RATNA · DEFENCE COLONYJADHAV ASSOCIATES · P52100019026 · possession Dec 2022 · 90.9% built
- VANALIKA - PARADISE - PHASE - III-3A · PAUD ROADM/S. AVIOR MAJESTIQUE PROPERTIES · P52100019038 · possession Dec 2027 · 90.9% built
- Tranquility Annexe A and B Wing Phase 1 · Manjri Stud FarmK AND B ASSOCIATES · P52100019051 · possession Dec 2024 · 90.9% built
- NIRVANA BEYOND B WING · KATALE WASTIDIAMOND NEXUS PROPERTIES · P52100019054 · possession Dec 2022 · 90.5% built
- RAVITEJ · DUDULGAONSRI KALPATRU REALTY PRIVATE LIMITED · P52100019063 · possession Dec 2023 · 88.8% built
- Nakshatra · Nimhan MalaANGAL & CO · P52100019074 · possession Sept 2024 · 90.9% built · 5 complaints
- Legacy Crest · Jambe- Punawale roadLegacy Homes · P52100019089 · possession Dec 2022 · 81.8% built · 1 complaint
- K52 Building A · Pune CityM/S Shri Sairaj Associates · P52100019093 · possession Oct 2021 · 90.9% built
- Aayush Business Square · Near D Y Patil Engineering College - VaraleEarnest and Shah Ventures · P52100019102 · possession Dec 2020 · 77.3% built
- PRISTINE SHATRUNJAY PART 1 · HaveliASHTAVINAYAK VENTURES · P52100019105 · possession Aug 2022 · 100% built
- THE VIBE · Koregaon ParkGAGAN TITANIUM SPACES LLP · P52100019109 · possession Sept 2029 · 14% built · 13 complaints
- ATTALIKA · BIBWEWADIKALPANA PRAVIN SANGHVI · P52100019117 · possession Dec 2024 · 100% built · 1 complaint
- Nakshatra Premier · ShirurNITU ASSOCIATE · P52100019123 · possession Aug 2023 · 100% built
- LAGOM · MulshiH S ASSOCIATES · P52100019127 · possession Dec 2027 · 28.6% built · 3 complaints
- OM PARADISE NX · VIKAS NAGAR, KIWALEACON PROPERTIES · P52100019128 · possession Dec 2025 · 72.7% built
- SHREEYANSH PARK · HaveliSHREEYANSH PARK · P52100019134 · possession Jun 2026 · 81.8% built
- Akash Towers A and B · Pimple NilakhLunkad Builders LLP · P52100019140 · possession Jun 2022 · 86.4% built · 1 complaint
- KINGSBURY PHASE II · D Y PATIL COLLEGE AREAJaikul Associates · P52100019148 · possession Dec 2023 · 90.9% built
- Rahul Residency · ParvatiSiddh Construction and Developers · P52100019158 · possession Jun 2023 · 81.8% built
- Madhukosh · BalewadiKakkad Housing · P52100019179 · possession Sept 2024 · 74.1% built
- AVIOR AATMAN · Pune CityAVIORENTERPRISES LLP · P52100019192 · possession Dec 2022 · 81.8% built
- GANESH EMERALD B WING · CHIKHALIEKDANTA NEST LLP · P52100019225 · possession Jun 2021 · 72.3% built
- Dwarikadham · HaveliYashodhan Affordable Landmark LLP · P52100019278 · possession Jun 2028 · 78.2% built · 4 complaints
- EURISKA BUILDING C · -EISHA ASSET DEVELOPERS PHASE II · P52100019280 · possession Dec 2023 · 100% built
- SILVER OAK · PUNESHREE SIDDHIVINAYAK CONSTRUCTION · P52100019281 · possession Mar 2021 · 6.8% built
- PANACHE PHASE IV · KatrajTRIMURTI SAI NATH INFRAS LLP · P52100019294 · possession Dec 2021 · 27.3% built
- VENTURE CITY A AND D WING · DUDULGAONVENTURE GROUP · P52100019311 · possession Aug 2024 · 90.9% built · 1 complaint
- CHIRAG ELITE · Near Baramati District CourtP M DEVELOPERS · P52100019319 · possession Dec 2025 · 90.9% built
- Parklane Urbanjoy -Wing A · Sus GoanPARKLANE CONSTRUCTION LLP · P52100019327 · possession Mar 2024 · 100% built
- AARAMBH · DUDULGAON, MOSHIYashada Nivasa Associates · P52100019333 · possession Dec 2021 · 81.8% built
- Skyi Songbirds Phase E · MulshiEnerrgia Skyi Developers · P52100019348 · possession Dec 2027 · 78.8% built · 5 complaints
- ONE BOAT CLUB · SANGAMWADI PUNEGOEL GANGA CONSTRUCTIONS AND REAL ESTATE PVT LTD · P52100019356 · possession Dec 2030 · 3.7% built · 1 complaint
- Centralis Tower 4 · HaveliMahindra Lifespace Developers limited · P52100019375 · possession Mar 2023 · 100% built · 1 complaint
- Centralis Tower 2 · HaveliMahindra Lifespace Developers limited · P52100019393 · possession Aug 2023 · 100% built · 2 complaints
- VISION INDRATEJ · TATHAWADEVISION BUILDCON · P52100019399 · possession Jun 2022 · 90.9% built
- Aeropolis Phase III · LohgaonKrishna developers · P52100019401 · possession Sept 2022 · 90.9% built
- Centralis Tower 1 · PimpriMahindra Lifespace Developers limited · P52100019406 · possession Aug 2023 · 100% built · 1 complaint
- Centralis Tower 3 · PimpriMahindra Lifespace Developers limited · P52100019407 · possession Mar 2023 · 100% built · 2 complaints
- AVIOR -AATMAN PHASE -II · Pune CityAVIORENTERPRISES LLP · P52100019422 · possession Dec 2022 · 81.8% built
- SARTHAK · WADKIZEP WOMENS INFRASTRUCTURE PRIVATE LIMITED · P52100019424 · possession Dec 2028 · 18.2% built
- La Commercia · BanerAUM HOUSING · P52100019443 · possession Mar 2027 · 81.8% built
- Jai Rajkiran Cooperative Housing Society · Walvekar NagarCitadel Landmarks · P52100019450 · possession Mar 2023 · 55% built
- ANTRIKSH TOWERS · Pune CityAUM CITYSCAPES LLP · P52100019454 · possession Dec 2026 · 91.8% built
- A P Pinnacle Phase 1 · HaveliA P Construction · P52100019457 · possession Mar 2024 · 86.4% built
- YashONE Hinjawadi - Phase 1 · HinjawadiVilas Javdekar Eco Shelters Private Limited · P52100019468 · possession Dec 2023 · 99.2% built
- Kingston Greens Phase 1 · HaveliVedant Developments · P52100019471 · possession Jun 2027 · 60.5% built
- ROYAL CASSIA A WING · HaveliROYAL CASSIA A WING · P52100019483 · possession Dec 2023 · 90.9% built · 1 complaint
- ACE ALMIGHTY COMMERCIAL · TATHWADEM/S. ACE ALMIGHTY · P52100019488 · possession Jun 2022 · 99.5% built
- Rose Gardenia · KhedRose Dream Developers · P52100019495 · possession Sept 2026 · 63.5% built
- ANIKA REGALIA · GULTEKADI, MUKUNDNAGAR, PUNEArun Pitamber Sheth · P52100019498 · possession Dec 2022 · 93.6% built
- RUNAL GATEWAY PHASE - II · KiwaleRajendra Suresh Jain · P52100019500 · possession Mar 2021 · 90.9% built
- SARA SWAPNAVIHAR · KhedJagrutsara Structures LLP · P52100019508 · possession Jun 2026 · 81.5% built
- Goodwill Fabian Phase 1 · lohgaonChoice Developments · P52100019512 · possession Dec 2023 · 98.2% built
- IMPERIAL TOWER C WING · NIBMAGCONSTRUCTIONS · P52100019566 · possession Jun 2022 · 28.2% built
- PANCHATATTVA HEIGHTS · PUNAWALERAJENDRA KUMAR PUGALIA · P52100019593 · possession Dec 2026 · 40.5% built
- Majestique Rhythm County Phase I · Autade HandewadiMAJESTIQUE RISINGSUN LLP · P52100019616 · possession Dec 2023 · 90.9% built
- Sukhwani Pacific - II · ThergaonPratham Constructions · P52100019622 · possession Dec 2025 · 100% built
- SONIGARA PRESIDENCY · MASKE WASTI RAVETSONIGARA & BHOSALE ASSOCIATES · P52100019628 · possession Dec 2023 · 100% built
- Soham Residency A Wing · HaveliKhushbu Realties Pvt. Ltd. · P52100019635 · possession Dec 2021 · 81.8% built
- Royal Arcade B Wing · HaveliLJMK DEVELOPERS LLP · P52100019636 · possession Dec 2027 · 13.7% built
- Godrej Park Greens · MamurdiGodrej Skyline Developers Limited · P52100019639 · possession Mar 2028 · 80% built · 67 complaints
- 93 Avenue Phase- III · Pune CityRAVIRAJ BOKADIA CREATIVE · P52100019662 · possession Nov 2019 · 54.5% built
- Manhattan - G building · Wagholi PuneMAJESTIQUE HOUSING LLP · P52100019706 · possession Dec 2023 · 100% built
- Royal Arcade A Wing · HaveliLJMK DEVELOPERS LLP · P52100019743 · possession Dec 2027 · 21.9% built
- E Wing · Near Modern College of Pharmacy Borhadwadi Moshi PuneVinayak Pandharinath Bhongale · P52100019750 · possession Jun 2022 · 14.5% built · 1 complaint
- INFINITY PLANET C AND D WING · MOSHITULIP PROPERTIES · P52100019792 · possession Dec 2022 · 82.7% built · 1 complaint
- FUSION TOWERS PHASE II · Hinjawadi - Phase IIIRAMA SYNERGY SPACES · P52100019797 · possession Dec 2022 · 98.2% built · 2 complaints
- Swami Samruddhi · UndriSwamiraj Creators · P52100019803 · possession Dec 2024 · 100% built
- MOHAN APARTMENT PHASE I · SADASHIV PETHARCHWAY PROPERTIES · P52100019812 · possession Sept 2022 · 90.9% built
- 9-Nanded · HaveliPURANDAR PROMOTERS AND BUILDERS · P52100019819 · possession Sept 2027 · 26.4% built
- The Back Water Residency phase I - D Building · HaveliLNK PROJECTS Through Proprietor Mr Narayan Baburao Khasnis · P52100019828 · possession Dec 2019 · 90.9% built
- CRYSTAL PARK · MOHOMMADWADITRIMURTI DEVELOPERS · P52100019837 · possession Feb 2023 · 31.4% built
- VARSHA Phase II · BanerSADGURU Developers · P52100019844 · possession Sept 2020 · 89.1% built
- Ashanand Residency G Building · KhedAnand Deoram Tambe · P52100019866 · possession Dec 2024 · 30.9% built
- Al Marjaan · HaveliBriskband Associates · P52100019898 · possession Jun 2026 · 50.9% built · 9 complaints
- Aangan Phase II · MawalGalaxy Associates · P52100019915 · possession Dec 2022 · 2.3% built
- Ashanand Residency F Buidling · KhedAnand Deoram Tambe · P52100019921 · possession Dec 2024 · 72.7% built
- ADORN ALCAZAR-I · KONDHWA BUDRUKHASIB AHMED SHAIKH · P52100019924 · possession Nov 2024 · 90.9% built
- 198 City hub · Pune CityUrban Syndicate · P52100019925 · possession Jun 2026 · 80% built
- Majestique Venice building D Wing A · Dhayari PuneMajestique Nirman LLP · P52100019927 · possession Dec 2023 · 100% built
- Majestique City D Building · Pune-Nagar RoadMANISH DWARKADAS MAHESHWARI · P52100019947 · possession Mar 2024 · 90.9% built
- Swaroop Enclave · Mitramandal Co Op Hsg SocietyAMS LANDMARKS CO. · P52100019957 · possession Mar 2023 · 90.9% built
- Megapolis Mystic - C · Rajiv Gandhi Infotech Park, Phase 3Pegasus Properties Pvt. Ltd. · P52100019959 · possession Dec 2019 · 90.9% built
- SIGNATURE PARK G AND H BUILDING · THERGAONSHREE SONIGARA REALCON · P52100019960 · possession Apr 2024 · 45.5% built · 89 complaints
- Sukhwani Coloronic Phase II · RavetS. S. D. Construction · P52100019968 · possession Sept 2021 · 88% built
- Blue Sapphire Business Park · Pimple saudagarMangaldeep Associates · P52100019991 · possession Dec 2025 · 81.8% built
- Ganesh Vandan · HaveliGanesh Developers & Company · P52100020004 · possession Dec 2023 · 100% built
- Panchvati · Bawdhan KhurdAnil Wamanrao Shinde · P52100020011 · possession Dec 2019 · 100% built
- DREAM HORIZON · HaveliMOZE PROPERTIES · P52100020037 · possession Dec 2027 · 90.9% built
- Prathamesh Excellencia · Jeevan Nagar, TathawadePrathamesh Developers & Builders · P52100020042 · possession Dec 2023 · 95.5% built
- BHAMA AMBER · NEAR OLD POLICE STATIONAASTHA BUILDCON · P52100020046 · possession Mar 2028 · 63.6% built
- Manor Crystal · MulshiOXFORD INFRA GROUP · P52100020056 · possession Sept 2026 · 56.4% built · 7 complaints
- SOBHA NESARA BLOCK-1 · KOTHRUDSOBHA LIMITED · P52100020057 · possession Mar 2026 · 98.2% built · 3 complaints
- SWARADA SANKUL · KHED SHIVAPURSHINDE PATANKAR ASSOCIATES · P52100020061 · possession Dec 2024 · 100% built
- NIRVANA LIFECITY · NEAR NYATI EVITANIRVANA LIFECITY LLP · P52100020070 · possession Mar 2026 · 89.1% built
- Mount Castle Phase II · WagholiSancheti Space · P52100020079 · possession Dec 2023 · 100% built
- Aldea Annexo - D · Near Puraniks Aldea EspanolaPuranik Builders Limited · P52100020092 · possession Sept 2028 · 90.9% built
- SUNDER SANSKRUTI PHASE 3 · DHARMAVAT NAGAR WADGAON KHURD SINHAGAD ROADSURESH DHARMAVAT AND ASSOCIATES · P52100020100 · possession Mar 2023 · 100% built
- Regency Orion · BanerREGENCY HOUSING · P52100020102 · possession Apr 2019 · 81.8% built
- Diamond hills · HaveliA Square Properties · P52100020110 · possession Dec 2026 · 26.4% built · 1 complaint
- RAGHUNANDAN KASTURI/ KAMTHE PATIL BUSINESS CENTER · KONDHWA BKRAGHUNANDAN ASSOCIATES · P52100020129 · possession May 2024 · 81.8% built
- Meghdoot Tower · HaveliV R Kulkarni & Associates · P52100020133 · possession Dec 2023 · 90.9% built · 1 complaint
- Siyona Phase - II · MulshiPETHKAR PROJECTS · P52100020135 · possession Mar 2029 · 60.9% built
- WINDSOR TOWER · PUNES AND S ENTERPRISES · P52100020138 · possession Dec 2022 · 90.9% built
- SKYLAND · BorhadewadiRAMA VENTURES · P52100020146 · possession Mar 2023 · 100% built
- THE ACE · GHORPADIGAONA R Constructions · P52100020169 · possession May 2022 · 100% built
- Destination Ishanya B Wing · HaveliGavhane Realty · P52100020181 · possession Jun 2022 · 78.2% built
- Majestique Nest Building C · PUNEM/S MAJESTIQUE ASSOCIATES · P52100020198 · possession Dec 2025 · 90.9% built
- Puraniks Abitante Fiore, Phase 2A · MulshiPuranik Buildcon Private Limited · P52100020202 · possession Dec 2030 · 82.1% built · 52 complaints
- GULMOHAR · JalochiVAASTU VISHWA BUILDCON · P52100020209 · possession Sept 2023 · 61.8% built
- SILVER TOUCH · HaveliSilver Touch Developers · P52100020228 · possession Dec 2026 · 4.5% built
- Majestique Venice Building E Wing A · PuneMajestique Nirman LLP · P52100020257 · possession Dec 2024 · 100% built
- Legacy Aeon · Near Kalyan BhelLegacy Homes · P52100020258 · possession Dec 2024 · 77.3% built
- 11 West · BanerBaner Hills LLP · P52100020311 · possession Dec 2025 · 90.9% built
- Square One · HaveliKokane - Waghere Associates · P52100020339 · possession Jun 2026 · 59.1% built
- Sadashanti · KothrudDigamber Parulekar · P52100020351 · possession Mar 2022 · 81.8% built
- SWOJAS GAURI · ERANDWANASWOJAS ENTERPRISES · P52100020353 · possession Mar 2022 · 4.5% built
- LOVE SPRING · HaveliAPEX ASSOCIATES · P52100020368 · possession Jun 2026 · 81.8% built
- Shubh Aarambh · alandiSIDDHIVINAYAK DEVELOPERS · P52100020376 · possession Jun 2023 · 95.5% built
- ALIVE SKYPARK · BANERNIMANI CONSTRUCTIONS · P52100020379 · possession Mar 2023 · 81.8% built
- GRAFIKON OPULENCE · Salisbury ParkTrinetra Enterprise · P52100020385 · possession Mar 2027 · 100% built · 1 complaint
- Alankapuram Ph 3 B and C building · wadmukhwadiR K Lunkad Housing corporation · P52100020392 · possession Sept 2022 · 81.8% built
- MEMORIES 90 - PHASE II · MOHAMMADWADIM/s NAMO DEVELOPERS · P52100020409 · possession Dec 2024 · 66.8% built
- KUMAR PEBBLE PARK KHUSHI 2- D2 · HANDEWADIKumar Construction and Properties Pvt Ltd · P52100020421 · possession Apr 2024 · 49.1% built
- KUMAR PRATIK B BUILDING · SINHGAD ROADKumar Construction and Properties Pvt Ltd · P52100020450 · possession Mar 2023 · 0% built · 1 complaint
- SPLENDID MEADOWS · PIMPLE SAUDAGARYASHADA DEVELOPERS · P52100020457 · possession May 2023 · 100% built · 1 complaint
- Nivaan Medows · HaveliVISHAL CHUGERA PROPERTIES INDIA PRIVATE LIMITED · P52100020464 · possession Dec 2026 · 3 complaints
- Reelicon Fairy Bell · MulshiReelicon Red Homes Private Limited · P52100020477 · possession Dec 2026 · 86.4% built
- SHIVTEERTH LEGACY A WING · DUDALGAONSHIVTEERTH PROPERTIES · P52100020486 · possession Mar 2023 · 9.1% built
- AP81 · Koregaon park AnnexeHighspot Properties LLP · P52100020509 · possession Mar 2024 · 100% built
- ACE ALMIGHTY GAMMA TOWER · TATHAWADEM/S. ACE ALMIGHTY · P52100020514 · possession Dec 2023 · 100% built
- Gokhale Business Bay · Opp City Pride KothrudGokhale Landmarks LLP · P52100020518 · possession Mar 2025 · 100% built · 3 complaints
- Majestique Gigahomes LLP · HaveliMajestique Gigahomes LLP · P52100020627 · possession Dec 2029 · 0.2% built
- GULMOHAR SOCIETY · JunnarNITIN SITARAM KULKARNI · P52100020640 · possession Dec 2027 · 73% built
- HOMEDALE PHASE 2 · KhadakwaslaM/s. Om Shiv Sai Promoters & Developers · P52100020649 · possession Dec 2026 · 100% built
- SWAPNASHILP · GHORPADIUday Pandurang Dalvi · P52100020665 · possession Jun 2023 · 43.4% built
- Godrej Nurture · HaveliGodrej Skyline Developers Limited · P52100020686 · possession Sept 2026 · 100% built · 23 complaints
- Mont Vert Grande Plot 4 Bldg D · PashanNiraj Kumar Associates Pvt Ltd · P52100020690 · possession Dec 2024 · 90.9% built
- 1 Hallmark Aveneu Phase II · HaveliRajHeramb Properties · P52100020694 · possession Apr 2028 · 40.2% built
- SIGNATURE TOWER PHASE 2 · Pune CitySIGNATURE TOWER PHASE 2 · P52100020721 · possession Dec 2031 · 1.6% built
- Altus · BalewadiArham Lifespace Realty · P52100020726 · possession Dec 2023 · 81.8% built
- Nisarg Vatika Phase II · BorhadewadiNisarg Ventures · P52100020731 · possession Dec 2022 · 90.9% built
- ETHIQUE HRISHIKESH CO OP HOUSING SOCIETY · MODEL COLOYETHIQUE DEVELOPERS LLP · P52100020750 · possession Dec 2023 · 100% built · 1 complaint
- ONE HQ · HaveliNAHAR HOMES LLP · P52100020788 · possession Dec 2026 · 78.5% built
- Varad Shubharambha · behind ISKCON TempleDnyaneshwar Sarode · P52100020816 · possession Oct 2020 · 100% built
- PANAMA PARK · LohgaonThe Kallyaanee Fortune Properties · P52100020820 · possession Dec 2024 · 13.6% built
- 2Elite · ChikhliNarayani Buildcon · P52100020832 · possession Nov 2022 · 90.9% built
- THE ADDRESS PHASE-3 · OPP. BORATE VASTI, MOSHISOL Developers · P52100020839 · possession Nov 2023 · 78.8% built
- BLUE EMPIRE · NEAR FOREST VIEW SOC.BLUEBERRY DEVELOPERS · P52100020878 · possession Dec 2022 · 90.9% built
- Mont Vert Grande Bldg Type G plot 2 · PashanNiraj Kumar Associates Pvt Ltd · P52100020880 · possession Apr 2024 · 90.9% built
- PATIL PLAZA · ShirurPATIL PLAZA · P52100020885 · possession Dec 2026 · 72.7% built
- Aishwaryam Hamara Abhimaan · MoshiSAI ESSEN DEVELOPERS · P52100020889 · possession Dec 2024 · 9.1% built
- YashONE Wakad Central · WakadVilas Javdekar Eco Shelters Private Limited · P52100020910 · possession Dec 2024 · 95.2% built
- silver hills · bhusari colonySHREYA BUILDERS · P52100020917 · possession Dec 2021 · 100% built
- MHADA - Yashwin Encore · Opposite Sayaji HotelVilas Javdekar Lifestyle Developers Pvt. Ltd. · P52100020924 · possession Dec 2024 · 90.9% built
- SWOJAS PRASHANT · ERANDWANASWOJAS PROPERTIES · P52100020926 · possession Jan 2023 · 90.9% built
- SIGNATURE PARK C AND D BUILDING · THERGAONSHREE SONIGARA REALCON · P52100020943 · possession Apr 2024 · 42.3% built · 66 complaints
- NAKSHATRAM · MHASKARNES COLONY NO 2NAKSHATRA BUILDCON · P52100020949 · possession Feb 2023 · 100% built
- Zelam · ErandwanaGokhale Constructions · P52100020973 · possession Dec 2022 · 42.7% built
- CROWN C1 · MOSHIDMK INFRASTRUCTURE PVT LTD · P52100020978 · possession Oct 2022 · 46.4% built · 1 complaint
- PROSPERIA PART 1 · CHIKHALIPristine Properties · P52100020997 · possession Nov 2025 · 81.8% built · 3 complaints
- V UPTOWN C WING · KIWALE ,KATALE VASTITATVAM CONSTRUCTIONS PRIVATE LIMITED · P52100021002 · possession Jun 2024 · 100% built
- Trinity Greens · Near Bhumkar chowkRajmata Realty · P52100021005 · possession Sept 2023 · 75.8% built
- GANGA LEGEND A2 AND B4 · BAVDHANLegends County Landmark Pvt Ltd · P52100021020 · possession Dec 2023 · 83.9% built · 4 complaints
- SYLVAN HEIGHTS H BUILDING · AUNDHNAIKNAVAREDEVELOPERSPVTLTD · P52100021048 · possession Dec 2022 · 66.4% built
- SAMRUDHA COMPLEX · JunnarRAVI SOMJIBHAI PATEL · P52100021049 · possession Dec 2021 · 81.8% built
- SUNAND APARTMENT PHASE I · SADASHIV PETHARCHWAY PROPERTIES · P52100021064 · possession Dec 2022 · 86.8% built
- YASHADA SPLENDID PARK · DudulgaonYASHADA DEVELOPERS · P52100021070 · possession Jan 2025 · 95.2% built
- RAMAA HERITAIGE - PHASE I · UNDRIWADHWA BUILDERS & DEVELOPERS · P52100021140 · possession Nov 2019 · 64.1% built
- Raviraj Splendour Greens · HaveliRAVIRAJ SHETH DEVELOPERS LLP · P52100021159 · possession Dec 2027 · 32.1% built
- THE WORK CLUB PHASE I · Pimpri WaghereRavima Developer · P52100021171 · possession Apr 2023 · 85% built
- Vaidehi Villas · Prathamesh ParkVaidehi Enterprises · P52100021172 · possession May 2025 · 90.9% built
- NEELAYA PROJECT 2 · TALEGAONNAIKNAVARE BUILDCON PVT LTD · P52100021179 · possession Jun 2022 · 79.5% built · 1 complaint
- Sukhwani Skylines · MulshiSukhwani Chawla Developers · P52100021183 · possession Dec 2027 · 89.1% built
- Orville Business Port · HaveliSiddhesh properties · P52100021192 · possession Dec 2026 · 87.3% built · 1 complaint
- 41 ELITE A BUILDING PHASE 2 · JEEVAN NAGARM/S KRISALA ENTERPRISES · P52100021234 · possession May 2023 · 47.7% built
- SUVIDHA HARIPRASAD · MAYUR COLONYSUVIDHA CONSTRO · P52100021241 · possession May 2022 · 40.9% built
- Peace Paradise · RavetS P Developers · P52100021250 · possession Dec 2022 · 32.7% built
- Sukhwani Boulevard Commerz · Next to HP Petrol Pump, SusVicky G Sukhwani · P52100021251 · possession Sept 2019 · 55.5% built
- DEDGAONKAR ARCADE · GURUWAR PETH PUNETRINITY FACADES PRIVATE LIMITED · P52100021263 · possession Dec 2023 · 70.9% built
- KOHINOOR CORAL · VILLAGE BHOIRWADI, TAL MULSHIYELLOWSTONE SKYSCRAPERS LLP · P52100021279 · possession Dec 2024 · 99.8% built
- MANAS VALLEY PHASE II · MulshiBALAJI KIMAYA ASSOCIATES · P52100021300 · possession Oct 2026 · 62.3% built
- VTPBelair E and F Building · MhalungeNNP BUILDCON PVT. LTD. · P52100021327 · possession Jun 2025 · 100% built · 13 complaints
- NYATI EVARA II · UndriNYATI BUILDERS PRIVATE LIMITED · P52100021346 · possession Sept 2020 · 78.6% built
- T9 Chronos and T10 Supremus Phase 1 Of Raheja Reserve being Buildings T7 T8 T9 T10 in RV Premiere · NIBMCavalcade Properties Private Limited · P52100021356 · possession Sept 2025 · 72.7% built · 5 complaints
- Nova · MundhawaMagarpatta City Dev, Co. Pvt. Ltd. · P52100021358 · possession Nov 2022 · 86.4% built
- KESHAVYOG RESIDENCY · HaveliSIDDHIVINAYAK BUILDERS · P52100021394 · possession Dec 2026 · 73.9% built
- Chidanand · BanerLaxmi Balaji Construction · P52100021399 · possession Dec 2022 · 100% built
- Shree Apartment · Model ColonyRevive Homes LLP · P52100021408 · possession Sept 2022 · 81.8% built
- ANAND PRIDE · BABRAS MALAANAND CONTRACTORES AND DEVELOPERS · P52100021410 · possession Mar 2024 · 90.9% built
- NAKODA HEIGHT · MANIK CHOWKAMBIKA DEVELOPERS · P52100021416 · possession Dec 2028 · 73.2% built
- EXCELLAA RESIDENCY · AMBEGAONTHE EXCELLAA · P52100021432 · possession Dec 2025 · 90.9% built
- EXCELLAA PLAZZO · AmbegaonTHE EXCELLAA · P52100021440 · possession Dec 2025 · 90.9% built
- 75 WESTGATE · RAVETSIDDHARTH RAMESH BANSAL · P52100021442 · possession Jul 2023 · 1.8% built
- NYATI ETERNITY COMMERCIAL II · AXIS BANK UNDRINITIN DWARKADAS NYATI · P52100021443 · possession Dec 2019 · 45.2% built
- ARUNODAY CLASSIC A WING · MawalKEDAR HARISHCHANDRA KHANDGE · P52100021452 · possession Sept 2026 · 54.5% built
- Pyramid Axis · main Baner RoadPyramid Prasad Buildcon LLP · P52100021464 · possession Dec 2024 · 99.1% built
- SAVERA-2 · JunnarVIZION CONSTRUCTION · P52100021478 · possession Dec 2022 · 81.8% built
- La Ventana Phase 2 · KondhwaLAVENTANA LLP · P52100021496 · possession Dec 2022 · 90.9% built
- Vikrant · Navi PethPate P Square Developers LLP · P52100021513 · possession Jul 2023 · 90.9% built
- Amrutdhara A building · Sai Mandir WadmukhwadiLunkad Gruh Nirman Company · P52100021533 · possession Dec 2022 · 90.9% built
- SingaPune Ph 1 · HaveliXrbia Mirth Properties LLP · P52100021543 · possession Dec 2028 · 27.4% built · 13 complaints
- SingaPune Ph 2 · HaveliXrbia Mirth Properties LLP · P52100021544 · possession Dec 2028 · 31.9% built · 2 complaints
- SPLENDOUR COUNTY WAGHOLI · HaveliPS DEVELOPERS · P52100021548 · possession Jun 2026 · 86.4% built · 1 complaint
- Signature Heights · WakadSamruddhi Properties · P52100021583 · possession Mar 2022 · 66.2% built
- Mukti Nakshatra C type Building · Near Nakshatra GardenMukti Township Development & Construction Co. Pvt. Ltd. · P52100021585 · possession Mar 2022 · 100% built
- AURA KOLLECTIVE · Pune CityGAGAN G M REALTY · P52100021608 · possession Dec 2029 · 4.5% built
- Megapolis Saffron - A10 to A14 · Rajiv Gandhi Infotech Park Phase 3Pegasus Properties Pvt. Ltd. · P52100021609 · possession Sept 2024 · 90.7% built
- Green Hills Apartment · MulshiGreen Acres Projects Private Limited · P52100021629 · possession Dec 2027 · 28.2% built
- Millennium Manor · ChikhaliMillennium Developers · P52100021632 · possession Dec 2023 · 81.8% built
- Splendid Lake view · PASHANYASHADA HOMES · P52100021727 · possession Jun 2024 · 90.9% built
- Wakad Business Bay · Behind Tip Top International HotelMihir Projects · P52100021744 · possession Dec 2023 · 90.9% built · 1 complaint
- SingaPune Ph 3 · HaveliXrbia Mirth Properties LLP · P52100021752 · possession Dec 2028 · 34.9% built · 5 complaints
- YOU57 TOWER A · HINJEWADISANAS DEVELOPERS PRIVATE LIMITED · P52100021770 · possession Dec 2022 · 84.4% built · 1 complaint
- Mangalam homes · Dudulgoan MoshiYashashree Group · P52100021772 · possession Jun 2024 · 61.4% built
- DEVRAJ RESIDENCY PLOT NO 02 · VISHWASNAGARDEVRAJ HOUSING DEVELOPMENT PVT LTD · P52100021773 · possession Dec 2026 · 87.9% built
- ARUNODAY CLASSIC · TALEGAON STATIONVAISHNAVI GROUP OF CONSTRUCTION · P52100021781 · possession Nov 2024 · 54.1% built
- Sukhwani Fairview · ThergaonSukhwani Chawla Erectors · P52100021787 · possession Dec 2023 · 100% built
- GANADHISH SANKUL B WING · Pune CityM.S.PATIL AND ASSOCIATES · P52100021788 · possession Jun 2023 · 90.9% built
- VENKATESH GRAFFITI ELITE PHASE 2 · KESHAVNAGAR MUNDHWASHREE VENKATESH DEVELOPERS · P52100021796 · possession Dec 2022 · 90.9% built
- BHALCHANDRA VATIKA · NEAR BALAJI TEMPLESAMARTH CHINTAMANI PROPERTIES · P52100021798 · possession Oct 2020 · 90.9% built
- VENKATESH SKYDALE PHASE 1 · Pune CityShree Venkatesh Buildcon · P52100021836 · possession Mar 2024 · 100% built · 1 complaint
- Magnolia Business Centre · PashanPARANJAPE SCHEMES (CONSTRUCTION) LTD · P52100021866 · possession Dec 2024 · 90.9% built
- VENKATESH GRAFFITI PHASE 6 · KESHAVNAGAR MUNDHWASHREE VENKATESH BUILDCON PVT LTD · P52100021891 · possession Dec 2022 · 90.9% built
- 45 SHASHWAT AVENUE - B · PUNAWALESAMARTTHA PRISHA PROPERTIES · P52100021932 · possession Dec 2023 · 90.9% built · 5 complaints
- Eternia Phase 2 · HaveliVENTURESPRO PROJECTS LLP · P52100021956 · possession Dec 2026 · 65.9% built · 1 complaint
- ABHIMAN VISHWA · HaveliROYALGROUP · P52100021984 · possession Dec 2027 · 81.8% built
- INTERNATIONAL BUSINESS BAY · Pune CitySAKET DILIP SHAH · P52100021989 · possession Dec 2022 · 90.9% built
- REAL DREAM HOMES WING A AND B · GANESH NAGARREAL BUILDCON BUILDERS AND DEVELOPERS · P52100021993 · possession Aug 2024 · 99.5% built
- UNICORN NISARG BELROSE B BUILDING · WAKADNISARG SHELTERS · P52100021999 · possession May 2023 · 100% built
- BHALCHANDRA UPVAN PHASE - I · BEHIND BALAJI TEMPLESAMARTH CHINTAMANI PROPERTIES · P52100022001 · possession Aug 2023 · 100% built
- Ganganagar · ShirurSanjay Chandrakant Bafana · P52100022015 · possession Apr 2024 · 90.9% built
- NYATI EVOLVE II · MUNDHWANYATI GEETA ASSOCIATES · P52100022029 · possession Sept 2024 · 85.1% built
- NYATI EVOLVE I · MUNDHWANYATI GEETA ASSOCIATES · P52100022030 · possession Sept 2024 · 93.5% built
- INSIGNIA · BANER,ATHARVA REALTORS · P52100022043 · possession Dec 2020 · 54.5% built
- Saarrthi Skybay III · Pune CitySiddharth Properties · P52100022081 · possession Dec 2026 · 58.3% built
- KATE ESTATE · HaveliARIHANT PROPERTIES · P52100022084 · possession Dec 2026 · 63% built
- VASANTGANESH VISHWA · MulshiSangeeta Kisan Goud · P52100022095 · possession Dec 2026 · 92.7% built
- Godrej Hillside 1 · MahalungeMahalunge Township Developers LLP · P52100022099 · possession Oct 2024 · 81.8% built · 5 complaints
- Godrej Hillside 2 · MahalungeMahalunge Township Developers LLP · P52100022153 · possession Oct 2024 · 81.8% built · 3 complaints
- Metro Life Bizz Bay · Next to Indira College of Commerce and ScienceRAMA SYNERGY SPACES · P52100022156 · possession Jul 2024 · 90.9% built · 2 complaints
- Nirman Milestone · Mukai ChowkNIRMAN VENTURE · P52100022161 · possession Dec 2023 · 80% built · 1 complaint
- METRO LIFE MAXIMA RESIDENCES PHASE I · Next to Indira College of Commerce and ScienceRAMA SYNERGY SPACES · P52100022178 · possession Jul 2023 · 90.9% built · 26 complaints
- Opulent Properties Wing A · Manjari BKOpulent Properties · P52100022216 · possession Mar 2028 · 73.6% built
- KAPILASHRAM PHASE II · Ganjave ChowkRAMRAI Buildcon LLP · P52100022227 · possession Dec 2020 · 67.3% built
- Itrend Homes Phase III · HinjewadiHighpoint Landmark LLP · P52100022236 · possession Dec 2022 · 62.7% built
- Anil · Subhash Nagar Shukrawar PethGokhale Housing LLP · P52100022240 · possession Jun 2023 · 81.8% built
- Perfect 10 Phase IV · BalewadiShagun Manav Spaces LLP · P52100022249 · possession Dec 2025 · 80.5% built
- ROYAL RADIANCE · RAHATANIM/S.Five Star Shelters · P52100022253 · possession Mar 2021 · 81.8% built
- NEXUS GULMOHAR WING C · CHARHOLIDIAMOND NEXUS ASSOCIATES · P52100022264 · possession Sept 2023 · 81.8% built
- Sai Millenium AS · PunawaleSHIV CONSTRUCTIONS · P52100022267 · possession Sept 2023 · 81.8% built
- The Collection - Residential W8 · HaveliBramhacorp Limited · P52100022277 · possession Dec 2029 · 90.9% built
- KUMAR PALMCREST A4 BUILDING · PISOLIKUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED · P52100022295 · possession Aug 2023 · 61.8% built
- LOTUS AVENUE · CHOVISWADIMAULI DEVELOPERS · P52100022298 · possession Jul 2024 · 81.4% built
- MANTRA 24 WEST PHASE 6 · GAHUNJEMANTRA ERECTORS AND BUILDERS LLP · P52100022322 · possession Dec 2026 · 100% built
- CORNER VIEW RESIDENCY · BEHIND VISHAL LAWNSKACHA BUILDERS & DEVELOPERS · P52100022330 · possession Dec 2021 · 90.9% built
- ANANT · ParvatiRanjekar Realty LLP · P52100022339 · possession Dec 2022 · 100% built
- LUXOR · NR BITWISE CO, BANERGAJANAN UTTAMRAO MANTE · P52100022342 · possession Feb 2024 · 90.9% built
- AASARA Crystal Heights · Dehu PhataSandeep Shivaji Tapkir · P52100022365 · possession Oct 2024 · 90.5% built
- Legacy Millennia · PunawaleINFINITY DEVELOPERS · P52100022379 · possession Aug 2023 · 81.8% built
- Green Life · MulshiGreen Life · P52100022404 · possession Jul 2026 · 84.5% built
- STERLING SHELTERS · HaveliICON DEVELOPERS · P52100022411 · possession Dec 2021 · 81.8% built
- ADITYA ONE · KADOLKAR COLONY 2Avantika Sanjay Baviskar · P52100022417 · possession Mar 2023 · 100% built
- Vaiga · ChinchwadSOHANLAL SHANKARLAL VISHNOI · P52100022419 · possession Dec 2023 · 99.8% built
- Aqua Millennium · RAVETMILLENNIUM LEGACY DEVELOPERS · P52100022420 · possession Aug 2023 · 81.8% built
- VTPSolitaire Building C AND D · pashanWESTERNCITY TOWNSHIPS LLP · P52100022428 · possession Dec 2023 · 87.2% built · 3 complaints
- Unique Legacy Majestic · KeshavnagarUnique Buildcon · P52100022437 · possession Oct 2024 · 100% built
- Mukti Nakshatra A and B RH · Near Nakshatra GardenMukti Township Development & Construction Co. Pvt. Ltd. · P52100022445 · possession Mar 2022 · 100% built
- GANGA UTOPIA COMMERCIAL · Pune CityGOEL GANGA DEVELOPMENTS LLP · P52100022449 · possession Dec 2026 · 99.7% built
- Unique Legacy Grand · KeshavnagarUnique Buildcon · P52100022450 · possession Oct 2024 · 100% built
- GANGA UTOPIA E BUILDING · Pune CityGOEL GANGA DEVELOPMENTS LLP · P52100022453 · possession Dec 2026 · 99.9% built · 3 complaints
- Sukhwani Hermosa Casa · HaveliSukhwani Associates · P52100022474 · possession Dec 2027 · 84.8% built
- SHIVRAJ RESIDENCY · PIRANGUTESHREE SAI DEVELOPERS · P52100022479 · possession Dec 2023 · 81.8% built
- Anand Tarang A building · Charoli Phata , ChovisawadiR K LUNKAD BUILDERS AND PROMOTERS · P52100022482 · possession Aug 2022 · 78.2% built
- Kumar Pratham - A B C and Shops · Moshi - BorhadewadiKumar Agro Products Pvt Ltd · P52100022486 · possession Feb 2025 · 97.7% built
- Celestial City Phase II Building A, E, H · S No 78 P and 86/2 P, Ravet Aundh Road, Near Expressway, Ravet, Pimpri Chichwad, Pune, MHRAMA SYNERGY SPACES · P52100022487 · possession Mar 2023 · 97% built
- VISTARA · ChikhaliBuildstrong Estate Realtors LLP · P52100022491 · possession Dec 2022 · 90.9% built
- NYATI EMPRESS · LOHEGAONNYSHAA BUILDERS LLP · P52100022492 · possession Sept 2024 · 81.8% built
- Mukti Nakshatra D and F type Building · Near Nakshatra GardenMukti Township Development & Construction Co. Pvt. Ltd. · P52100022494 · possession Mar 2023 · 95.5% built
- AMANSARA · RAVADESVB REALTY · P52100022501 · possession Oct 2024 · 1 complaint
- EQUILIFE HOMES PHASE III · PuneYELLOWSTONE NIRMITI LLP · P52100022543 · possession Jun 2024 · 100% built
- VISION ACE PHASE II · OPP INDIRA SCHOOL NEAR AKSHRA SCHOOL TATHAWADEVISION ACE · P52100022545 · possession Oct 2024 · 94.8% built
- 99 RIVERFRONT · BANERSRRINIVAS INFRABUILDTECH PRIVATE LIMITED · P52100022560 · possession Dec 2024 · 100% built
- sai planet · Near to koaushal banglowirshad ali jabbar shaikh · P52100022566 · possession Mar 2022 · 45.5% built
- Kumar Prospera - A3, A4 and A5 · MagarpattaKumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV · P52100022619 · possession Apr 2024 · 88.1% built · 1 complaint
- VISION ONE NEXT PHASE 1 · MulshiSS VENTURES AOP · P52100022621 · possession Oct 2026 · 90.2% built
- Savitri Park · Rao Colony , Talegaon DabhadeNAKSHATRA BUILDCON · P52100022629 · possession Jul 2022 · 72.7% built
- MAHA TRADE MARKET PH- 2 · Pune CityJAIRAJ REALTY LLP · P52100022645 · possession Jun 2027 · 48.6% built · 14 complaints
- Ganga Fernhill phase 02 · UndriMEENAMANI GANGA BUILDERS LLP · P52100022705 · possession Dec 2026 · 78.4% built · 3 complaints
- BELLEZA C WING · MALWADIVISHAL ASSOCIATES · P52100022719 · possession Mar 2023 · 90.9% built
- Shreemant Mayureshwar Krupa · Pune CityGANRAJ ASSOCIATES · P52100022723 · possession Jun 2022 · 100% built
- MRUDULA RESIDENCY · HaveliSAMARTH ASSOCIATES · P52100022729 · possession Sept 2026 · 72.7% built
- MAJESTIQUE MRUGAVARSHA PHASE I · DHAYARI PUNEMAJESTIQUE HERITAGE LIVING SPACES LLP · P52100022731 · possession Dec 2025 · 66.7% built
- Geras World of Joy M · HaveliGera Developments Private Limited · P52100022744 · possession Dec 2027 · 108.8% built · 1 complaint
- MAYANK · GHORPADIRANADE REALTORS LLP · P52100022751 · possession Dec 2023 · 73.2% built
- JAYHIND HILLSIDE · DUDULGAONSAGAR JAYSING ERANDE · P52100022761 · possession Mar 2024 · 81.4% built
- VTP Beaumonde Building T3 · ManjariARHUM ERECTORS PRIVATE LIMITED · P52100022781 · possession Jun 2025 · 80.9% built · 6 complaints
- Solitaire Business Hub -III, Phase- I, Baner · HaveliBaner Land Developers LLP · P52100022782 · possession Dec 2026 · 35.9% built · 30 complaints
- VTP Cygnus Building T11 · ManjariARHUM ERECTORS PRIVATE LIMITED · P52100022783 · possession Jun 2025 · 172.7% built · 2 complaints
- ANIKA PICCADILLY PHASE 1 · BHUJBAL VASTIArun Pitamber Sheth · P52100022784 · possession Dec 2026 · 100% built · 1 complaint
- Namoville · HaveliROYAL NAMOVILLE VENTURES · P52100022808 · possession Dec 2028 · 80.9% built
- Ram Residency · Pune CityOPULENT BUILDERS · P52100022811 · possession Jan 2027 · 50.5% built
- Nakshatra Grand · ShirurDILIP JUGRAJ KHABIA · P52100022816 · possession Sept 2020 · 100% built
- The Golden Bell · HaveliThe Golden Bell · P52100022820 · possession Dec 2026 · 90.9% built
- AYAAN A WING · HaveliGANDHI BAFNA ASSOCIATES · P52100022829 · possession Dec 2027 · 7.3% built
- VASANT VIHAR B WING · NARHEA R DEVELOPERS · P52100022836 · possession Oct 2023 · 55.5% built
- royal ishana phase 2 · wakad roadShree Venkateshwara Properties · P52100022842 · possession Dec 2024 · 100% built
- MILESTONE · BUDRUKLAGAD PROPERTIES LLP · P52100022853 · possession Mar 2023 · 81.8% built
- Goodwill Crescent · Keshav NagarChoice Lifestyle · P52100022861 · possession Dec 2024 · 90.8% built
- Green Mint · MulshiSunil Vishwanath Salunke · P52100022864 · possession Dec 2026 · 81.4% built
- KAMAL KUNJ · SUBHASH NAGAR LANE 4PLATINUM PRIDE · P52100022866 · possession Sept 2023 · 100% built
- ADVIKA PHASE III - E · PISOLIADVIKA CONSTRUCTIONS PVT.LTD · P52100022868 · possession Jun 2025 · 90.5% built
- MANIK SIGNIA · Shivajinagar (Bhamburda)Pate Siddhashila Developers LLP · P52100022879 · possession Oct 2023 · 95% built
- EASTWOODS · VimannagarAnand Constructions · P52100022931 · possession Dec 2023 · 52.3% built
- VANTAGE TWENTY ONE · HaveliVIVANTA REALTY · P52100022932 · possession Oct 2027 · 95.5% built · 2 complaints
- ROYAL ISHANA PHASE 1 · wakad roadShree Venkateshwara Properties · P52100022937 · possession Jun 2022 · 100% built
- Sharvari Homes · Wadachi WadiVMG BUILDCON · P52100022945 · possession Feb 2022 · 81.8% built
- Megapolis Serenity A8 to A12, B2 and Conv shop B · Rajiv Gandhi Infotech Park Phase 3Pegasus Properties Pvt. Ltd. · P52100022957 · possession Dec 2025 · 85.2% built
- GV7 CAPITAL 4 · Ambegaon BudrukChirag Developers · P52100022958 · possession Dec 2025 · 7.7% built
- ATHARVA · BanerKedar Vikasrao Deshpande · P52100022966 · possession Dec 2023 · 90.9% built
- PANORAMAA · MawalKAKADE PROPERTIES · P52100022986 · possession Dec 2026 · 74.5% built
- KRISHNAS BLESSING D BUILDING · MANJRI BKVISHAL INFRACON · P52100022987 · possession Mar 2023 · 1.8% built
- SHANTAI CLASSIC · HaveliSHANTAI GROUP · P52100023007 · possession Jun 2026 · 70.8% built
- GRACIA · TALEGAON DABHADESAGA CHRISHH ASSOCIATES · P52100023014 · possession Dec 2022 · 27.3% built
- PARIMAL · ERANDAVANERANADE REALTORS LLP · P52100023048 · possession Dec 2022 · 90.9% built
- Bramhacorp Business Park T9-A2 · HaveliBramhacorp Limited · P52100023050 · possession Dec 2029 · 86.5% built
- Megapolis Serenity A1 to A7, B1 and Conv shop A · Rajiv Gandhi Infotech Park Phase 3Pegasus Properties Pvt. Ltd. · P52100023051 · possession Dec 2025 · 75.2% built · 2 complaints
Near Eon IT park
KHARADI
- NYATI KALEIDOSCOPE I · KHARADINITIN DWARKADAS NYATI · P52100017920 · possession Mar 2019 · 62.7% built
- NYATI KALEIDOSCOPE II · KHARADINITIN DWARKADAS NYATI · P52100018178 · possession Mar 2019 · 65.5% built
- THE PLATINUM TOWERS · KHARADIAVISHKAR ARISTA DEVELOPERS LLP · P52100019881 · possession Aug 2025 · 81.6% built
- Nirman Altius Wing B · KHARADINIRMAN ASSOCIATES · P52100020177 · possession Dec 2023 · 90.9% built
- GANGA ANTRA · KHARADIMEENAMANI APC CONSTRUCTION (I) LLP · P52100021195 · possession Jun 2025 · 59.7% built · 1 complaint
- NYATI ELYSIA IV · KHARADINITIN DWARKADAS NYATI · P52100021738 · possession Sept 2023 · 100% built
WADMUKHWADI
MOUJE WADMUKHWADI
DHANORI
Vadgaonsheri
THITE VASTI
PUNE
- AMORAPOLIS B WING · PUNEKRISNA NIRMAAN SKYSCRAPER LLP · P52100018687 · possession Dec 2022 · 100% built
- AMORAPOLIS A WING · PUNEKRISNA NIRMAAN SKYSCRAPER LLP · P52100018864 · possession Dec 2022 · 100% built
- AMORAPOLIS C WING · PUNEKRISNA NIRMAAN SKYSCRAPER LLP · P52100021001 · possession May 2023 · 100% built