Thane
- Paradise · ThaneOm Sai Riddhi Siddhi Developers · P51700008580 · possession Dec 2018 · 84.5% built
- Prathamesh Towers · Thane (M Corp.)Shivam Developers · P51700008600 · possession Mar 2018 · 88.2% built
- VASANT SPRINGWOODS PHASE 2 · Badlapur (M Cl)M/S SHREE CONSTRUCTIONS · P51700008622 · possession Jun 2019 · 90.9% built
- PINNACLE GLORIA · Kolshet RoadKAPLESHWARA BUILDERS AND DEVELOPERS · P51700008627 · possession Oct 2022 · 42.3% built · 1 complaint
- ADIJON · ThaneJ. ALVARES & OTHERS · P51700008646 · possession Mar 2023 · 90.9% built
- SHANTAI · ThaneJANARDHAN SAKHARAM BHOIR · P51700008654 · possession Dec 2021 · 81.8% built
- AARSH AVENUE · AmbarnathSHREE DEVELOPERS · P51700008655 · possession Sept 2018 · 90.9% built
- SUCHIT SQUARE · KalyanIMPRESSIONS · P51700008664 · possession Feb 2018 · 90.8% built
- Shivnath Sky City · ThaneSHIVNATH DEVELOPER · P51700008666 · possession Jul 2018 · 89.5% built
- JP North Celeste · ThaneJ. P. INFRA (MUMBAI) PRIVATE LIMITED · P51700008667 · possession Dec 2020 · 100% built · 2 complaints
- SHANTI PARK · ThaneV R REALTIES · P51700008676 · possession Dec 2021 · 100% built
- OM RESIDENCY · ThaneSHREE KULSWAMI DEVELOPERS · P51700008682 · possession Dec 2020 · 78% built
- RAJ VAIBHAV NX · DOMBIVLISHREE GANESH CONSTRUCTION COMPANY · P51700008703 · possession Dec 2021 · 90.9% built
- SHIVNERI · KalyanAAVISHKAR ASSOCIATES · P51700008705 · possession Jul 2019 · 90.9% built
- Rassaz Greens · ThaneRais Ahmad · P51700008730 · possession Dec 2019 · 50% built
- REGENCY PARK PHASE 1 · KalyanSAB VENTURES · P51700008733 · possession Dec 2021 · 90.9% built
- MUKATA LAKE CITY · ThaneKANAK REALTORS · P51700008734 · possession Dec 2020 · 90.9% built
- TULIP RESIDENCY · ThaneRAHUL DILIP PATIL · P51700008759 · possession Mar 2019 · 68.2% built
- PALAVA RIVER VIEW E AND F · KalyanLodha Developers Limited · P51700008764 · possession Dec 2017 · 100% built · 4 complaints
- WING C-7 MORYA · -M K PATIL DEVELOPERS · P51700008767 · possession Dec 2018 · 100% built
- KASTURI EXOTICA · Ambarnath (R)ACORN REALITIES · P51700008788 · possession Dec 2019 · 57% built
- NARAYAN ELLITE · ThaneSHREE RAMTANU DEVELOPERS · P51700008792 · possession Mar 2022 · 100% built
- SHIVA PLAZA · KalyanKRUTIKA BUILDERS AND DEVELOPERS · P51700008806 · possession Nov 2020 · 39.1% built
- NISARG GREENS- Phase II A · MorivaliNND Ambernath LLP · P51700008839 · possession Dec 2021 · 68.6% built
- NEPTUNE SWARAJYA SECTOR 2 - B12 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LTD · P51700008852 · possession Dec 2019 · 60.2% built
- Dipti SkyCity Building 1 and 3 · AmbarnathDipti Home Makers Pvt Ltd · P51700008856 · possession Jul 2023 · 95.5% built
- UMIYA DARSHAN · Badlapur (M Cl)SHREE UMIYA GROUP · P51700008860 · possession Jun 2019 · 70.5% built · 2 complaints
- MARATHE FORTUNE · TitwalaSAIJI DEVELOPERS · P51700008862 · possession Mar 2019 · 4.2% built
- NEPTUNE SWARAJYA SECTOR 2 - B18 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LTD · P51700008868 · possession Dec 2019 · 57.1% built
- AMIKRUPA · ChikangharAAROHI DEVELOPMENT CORPORATION · P51700008884 · possession Sept 2020 · 90.9% built
- AND LILY · ThaneANANTNATH DEVELOPERS · P51700008885 · possession Dec 2022 · 90.9% built · 1 complaint
- Dosti Desire-Dosti Joy · brahmandD. D. ASSOCIATES · P51700008886 · possession Jan 2020 · 90.9% built
- BLDG 23 AS PER SALE PLAN WING E AS PER APPROVED PLAN · ThaneUDAY GHANSHYAM NAIK · P51700008895 · possession Dec 2027 · 27.9% built · 6 complaints
- Krishna Kunj Residency · Badlapur (M Cl)Ashoka Infrastructure · P51700008902 · possession Jun 2018 · 76.4% built
- Arcadia · ThaneJangid Properties · P51700008907 · possession Aug 2022 · 65.5% built
- ROYAL HEIGHT - Building B · ThaneNew Royal Construction Company. · P51700008912 · possession Dec 2026 · 73.2% built · 18 complaints
- JP North Estella · ThaneJP Infra Realty Private Limited · P51700008916 · possession Dec 2021 · 100% built · 1 complaint
- SANIYA HEIGHTS · BhiwandiMOONSHINE REALTORS PVT LTD · P51700008927 · possession Sept 2026 · 75.5% built · 7 complaints
- NEPTUNE SWARAJYA SECTOR 2 - B6 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LTD · P51700008931 · possession Dec 2019 · 49% built · 3 complaints
- Arham Vatika · Badlapur (M Cl)Arham Enterprises · P51700008943 · possession Jul 2018 · 82.7% built
- OM SAI HOME · BhiwandiM/S. INFINI DEVELOPERS · P51700008960 · possession Dec 2020 · 85.9% built
- AMBIKA ESTATE PHASE 1 · BhiwandiAMBIKA ESTATE PHASE 1 · P51700008966 · possession Dec 2028 · 21.6% built · 5 complaints
- MAN RESIDENCES · NERULMERINO SHELTERS PRIVATE LIMITED · P51700008980 · possession Dec 2023 · 31.4% built
- KUBER GANRAJ · GANESH NAGARKUBER ABHIRAJ INFRA · P51700008998 · possession Dec 2019 · 81.7% built · 57 complaints
- BHARGAV · ThaneR N ENTERPRISES · P51700009004 · possession Dec 2019 · 90.9% built
- SAMRUDDHI EVERGREEN-PHASE-4B · Badlapur (M Cl)Poddar Housing and Development Limited · P51700009016 · possession Mar 2019 · 70.6% built
- GIRIVIHAR · ThaneABHINANDAN ENTERPRISE · P51700009018 · possession May 2019 · 48.2% built
- Om Vatika · Badlapur (M Cl)Om Shiv Enterprises · P51700009019 · possession Jun 2018 · 90.9% built
- PATELS ELYSIUM - 6 · Ambarnath(M Cl)APACE REALTY · P51700009032 · possession Dec 2023 · 35.5% built
- RAI S HERITAGE D Wing · KalyanRAI RESIDENCY Private Limited · P51700009044 · possession Dec 2018 · 54.5% built
- Parkwoods Building A1 · ThaneAniline Construction Company Private Limited · P51700009055 · possession Mar 2018 · 100% built
- Diwadkar Lotus · KalyanHonest Infra · P51700009060 · possession Dec 2021 · 100% built
- USHA KIRAN RESIDENCY WING E1 E2 E3 · Badlapur (M Cl)USHA CONSTRUCTION CO · P51700009061 · possession Dec 2026 · 90.9% built
- NEELAM · SyndicateRAMCHANDRA PARSHURAM VARAK · P51700009063 · possession Dec 2018 · 27.3% built · 1 complaint
- POONAM ESTATE CL 2 BLG NO 1 2 3 · MIRA ROAD EASTRavi Developments · P51700009072 · possession Mar 2018 · 95.5% built
- Trimurti Heights · ThaneTrimurti Construction Co · P51700009075 · possession Mar 2018 · 88.2% built
- KOYNA · Thaneshree shakti developers · P51700009082 · possession Dec 2022 · 27.3% built
- MANGAL PUSHP HEIGHTS · ThaneSUNIL MANGILAL JAIN · P51700009090 · possession Dec 2023 · 33.2% built
- DAISY GARDENS SURVEY NO 12 PHASE II · AmbarnathANKITA BUILDERS · P51700009095 · possession Jul 2018 · 89.1% built
- IDEAL PARK · Mira-Bhayandar (M Corp.)IDEAL BUILDER & DEVELOPERS · P51700009100 · possession Aug 2019 · 90.9% built
- GREENWORLD DEVELOPERS PVT. LTD · ChikangharGREENWORLD DEVLOPERS PVT. LTD. · P51700009109 · possession Dec 2022 · 99.1% built
- M K Thakur Complex Phase 1 · ThaneVraj Ratan Buildcon Pvt Ltd · P51700009111 · possession Dec 2021 · 89.9% built
- SHREE SIDDHI APARTMENT · Washind (CT)SHREE SIDDHIVINAYAK BUILDERS AND DEVELOPERS · P51700009122 · possession Dec 2021 · 90.9% built
- MAHADEVSHREE · Mira-Bhayandar (M Corp.)M.M.CONSTRUCTION · P51700009145 · possession Jan 2021 · 81.8% built
- Asmeeta Infratech Limited - Asmeeta Texpa · kon (CT)Asmeeta Infratech Limited · P51700009154 · possession Dec 2019 · 81.8% built
- MY CITY - PHASE I - PART II · KalyanHORIZON PROJECTS PVT LTD · P51700009168 · possession Dec 2019 · 100% built · 3 complaints
- RADHESHYAM REGENCY · ThaneSHRI SATIMA ENTERPRISE · P51700009169 · possession Dec 2018 · 90% built
- AURALIS THE TWINS · ThaneDEEP HOMES & CONSTRUCTIONS LLP · P51700009177 · possession Jan 2021 · 100% built · 30 complaints
- ACE SQUARE PHASE 1 · ThaneANANT SQUARE · P51700009184 · possession Dec 2017 · 100% built
- FORTUNE HEIGHTS · ThaneSONY NOORIE REALITY · P51700009190 · possession Dec 2018 · 87.7% built
- JAK CELEBRITY · ThaneJAK INFRA · P51700009203 · possession Dec 2021 · 63.6% built
- CRYSTAL SPIRES · Chitalsar ManpadaLUXORA REALTORS PRIVATE LIMITED · P51700009216 · possession Jun 2023 · 84.8% built · 9 complaints
- Hill Spring Phase 1 · Thane WestVelocity · P51700009218 · possession Jun 2018 · 93.5% built · 1 complaint
- MAPLE CITY PHASE I · Badlapur (M Cl)SHREE CHINTAMANI ENTERPRISES · P51700009222 · possession Dec 2021 · 73.3% built
- Kismat Residency · Mira-Bhayandar (M Corp.)KISMAT DEVLOPERS · P51700009235 · possession Dec 2022 · 62.7% built
- ARYAN ONE WING E AND F · ShirgaonKonark Lifespaces · P51700009247 · possession Mar 2019 · 90.9% built
- SILVER ARCADE · ThaneSIDDHIVINAYAK ENTERPRISES · P51700009261 · possession Dec 2018 · 90.9% built
- UMIYA COMPLEX PHASE II · Badlapur (M Cl)Umiya Associates · P51700009284 · possession Nov 2020 · 90.9% built
- Chintamani Builders · KalambheChintamani Builders · P51700009293 · possession Dec 2019 · 90.9% built
- Kohinoor waves · UlhasnagarKohinoor Realties (J.V) · P51700009303 · possession Jan 2020 · 90.9% built
- KONARK MEADOWS Phase-1 · VarapAtlanta Landmark · P51700009313 · possession Dec 2022 · 90.9% built · 1 complaint
- VASTU SQUARE · Badlapur (M Cl)VASTU BUILDERS · P51700009315 · possession Mar 2018 · 72.7% built
- SAMARTH VATIKA · Badlapur (M Cl)SHREE SAMARTH ASSOCIATES · P51700009325 · possession Dec 2018 · 83.2% built
- RAUNAK CITY SECTOR IV - D10 · KALYAN WESTRAUNAK CORPORATION · P51700009331 · possession Dec 2025 · 100% built
- Shivnath Habitats · ThaneSHIVNATH DEVELOPER · P51700009343 · possession Jul 2018 · 90.9% built · 12 complaints
- SHIV SAI DARSHAN · Kalyan-Dombivali (M Corp.)SAI BALAJI DEVELOPERS · P51700009348 · possession Dec 2021 · 56.4% built
- KONARK SOLITAIRE - PHASE 1 · NEXT TO KDMC "A" WARDKONARK REALTIES J.V. · P51700009356 · possession Jun 2019 · 90.9% built
- Jainam Greens · Bhiwandi (M Corp.)Good Earth Build Well Private Limited · P51700009367 · possession Mar 2022 · 73.4% built
- OM SAVAI NIKETAN · BADLAPURSAGAR SUPER STRUCTURES PRIVATE LIMITED · P51700009373 · possession May 2018 · 73.6% built
- NANDISHWAR PLAZA · ThaneNANDISHWAR CONS CO · P51700009387 · possession Dec 2027 · 21.9% built
- ORION SQUARE TYPE C · AmbarnathSQUARE FEET REAL ESTATE · P51700009388 · possession Dec 2018 · 81.8% built
- Nida Amisha Heights · MIRA BHAYANDARSAI KRUPA DEVELOPERS · P51700009395 · possession Jul 2026 · 64.5% built · 3 complaints
- PRAMOD SMRUTI · KalyanMATOSHREE CONSTRUCTION · P51700009396 · possession Mar 2019 · 80% built
- SAMRUDDHI EVERGREENS-PHASE-4A · Badlapur (M Cl)Poddar Housing and Development Limited · P51700009407 · possession Mar 2018 · 78.2% built
- M M VALLEY C1 · ThaneALFA ENTERPRISES · P51700009447 · possession Dec 2018 · 90.9% built · 5 complaints
- OM RESIDENCY · adharwadiSHREE ASHAPURA COMBINES · P51700009448 · possession Jun 2022 · 0% built · 1 complaint
- ASHTAVINAYAK AVENUE · Ambarnath(M Cl)Ashtavinayak Infrastructure · P51700009467 · possession Dec 2017 · 77.3% built
- AL-QUDDUS RESIDENCY · Thane (M Corp.)ALLIANCE REALTY · P51700009468 · possession Jun 2027 · 55.9% built · 3 complaints
- S K RESIDENCY · ThaneITTEHAD BUILDERS AND DEVELOPERS · P51700009469 · possession Apr 2022 · 98.5% built
- PARADISE HEIGHT · ThaneFRIENDS GROUP · P51700009471 · possession Dec 2018 · 90.9% built
- KRISHNA SARANG GALAXY · ThaneRADHE KRISHNA INFRASTRUCTURE · P51700009475 · possession Dec 2018 · 100% built
- Asawari · Badlapur (M Cl)Ashish Waman Gole · P51700009484 · possession Mar 2018 · 52.3% built
- Geetanjali · ChikangharHonest Homes · P51700009495 · possession Dec 2019 · 90.9% built
- Mahavir Kalpavruksha - Oak, Tulip, Alcacia, Almond · ThaneDamji Shamji Realty Private Limited · P51700009513 · possession Dec 2021 · 93% built · 1 complaint
- SAI ARCADE · Badlapur (M Cl)SAI DEVELOPERS · P51700009522 · possession Dec 2017 · 90.9% built
- DAISY GARDENS SURVEY NO 12 PHASE I · AmbarnathANKITA BUILDERS · P51700009528 · possession Jun 2027 · 90.4% built
- Shantaram Park Residency · WafeShubha Developers · P51700009534 · possession Dec 2026 · 71.4% built · 7 complaints
- RAUNAK RESIDENCY · ThaneUNNATHI ESTATES · P51700009540 · possession Dec 2025 · 69.5% built · 1 complaint
- PATELS ELYSIUM - 1 · Ambarnath(M Cl)APACE REALTY · P51700009543 · possession Oct 2019 · 87.3% built
- SHREERAM GALAXY · SHIVAJI UDYOG NAGARSHREE RAM BUILDERS · P51700009544 · possession Mar 2023 · 25.5% built
- DEDHIA ELITA C WING · ThaneJAYDEEP CORPORATION · P51700009545 · possession Jun 2018 · 100% built
- UNIQUE GREEN · Thane (M Corp.)MADHU HARSHAD DOSHI · P51700009563 · possession Jun 2019 · 90.9% built · 11 complaints
- Akshar Business Park- Phase I · ThaneAkshar Developers · P51700009578 · possession Dec 2021 · 78.2% built · 13 complaints
- SAI RAJ RESIDENCY · Badlapur (M Cl)SHRIRAM DEVELOPERS · P51700009581 · possession Dec 2018 · 90.9% built
- Mountain Valley · ThaneGayasuddin Riyazuddin Khan · P51700009583 · possession Oct 2020 · 69.7% built
- PALACIA PHASE-II · ThaneSHREE SACHDHANAND DEVELOPERS · P51700009592 · possession Dec 2020 · 90.9% built
- EKDANTAY · TitwalaR K BUILDCON · P51700009599 · possession Nov 2018 · 90.9% built · 1 complaint
- SHREENATH AVENUE · ThaneSHREENATH ENTERPRISES · P51700009612 · possession Dec 2018 · 100% built
- SANGHVI VALLEY A1 A2 · ThaneSanghvi Premises Private Limited · P51700009615 · possession Jun 2018 · 89.1% built
- SHUBH VATIKA · Badlapur (M Cl)SHUBH ENTERPRISES · P51700009684 · possession Nov 2018 · 90.9% built
- YUGANDHAR SUDAMA · KalyanChaturthi Vastu Developers · P51700009697 · possession Jul 2026 · 47.3% built
- LAND MARK RESIDENCY · BhiwandiRIYAZ ACHHAN KHAN · P51700009708 · possession Dec 2018 · 47.9% built
- AASTHA ALAVIO · ThanePYRAMID INFRATECH CO. · P51700009719 · possession Apr 2022 · 100% built
- Cosmos Meluha · ThaneConcorde Realty · P51700009729 · possession Mar 2022 · 64.8% built
- Bhagatiniwas · KatrapShri Sadguru construction · P51700009762 · possession Dec 2018 · 45.5% built
- SAJAN HEIGHTS · NEAR SADGURU DARSHANDIKSHA DEVELOPERS · P51700009777 · possession Dec 2022 · 36.4% built · 4 complaints
- NEPTUNE SWARAJYA SECTOR 2 - B3 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LTD · P51700009783 · possession Dec 2019 · 60.2% built · 1 complaint
- NEPTUNE SWARAJYA SECTOR 2 - B8 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LTD · P51700009785 · possession Dec 2019 · 54.5% built · 3 complaints
- UNIVERSE I PHASE I · ThaneGayasuddin Riyazuddin Khan · P51700009797 · possession Dec 2023 · 90.9% built
- NEPTUNE SWARAJYA SECTOR 1-A4 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LIMITED · P51700009803 · possession Jun 2018 · 59.6% built
- MARATHE EMPIRE · TitwalaSAIJI BUILDERS · P51700009808 · possession Mar 2022 · 90.9% built
- SUNANDA CIRCLE B WING PHASE 1 · ThaneRUDIS DEVELOPERS · P51700009812 · possession Dec 2019 · 90.9% built · 1 complaint
- SAI SPRING · KALYANMOHAN KEDARNATH KRISHNAVANSHI · P51700009813 · possession Jun 2023 · 90% built
- SHASHWAT PARK - PHASE I - WING P · Badlapur (M Cl)SHASHWAT HOMES · P51700009814 · possession Dec 2018 · 70.9% built
- walchand nagar - 2 · ThanePRAKASH HAMIRMAL JAIN · P51700009826 · possession Apr 2018 · 56.4% built
- ADITYA ROYAL · Ambarnath(M Cl)Prashant Aditya Shukla · P51700009847 · possession Jun 2018 · 81.5% built · 3 complaints
- SAI DHAM RESIDENCY · BhiwandiBUILDCON ENGINEERS · P51700009855 · possession Dec 2019 · 81.8% built
- ATMIYA LUXURIA · SonavaleAKSHAR BUILDERS AND DEVELOPER · P51700009857 · possession Oct 2021 · 90.9% built
- VISHNU VATIKA WING A AND B PHASE I · Badlapur (M Cl)VISHNU VATIKA · P51700009860 · possession May 2023 · 86.4% built
- ACE SQUARE PHASE 2 · KasarvadavliANANT SQUARE · P51700009878 · possession Jun 2024 · 100% built
- Elite Solitaire 16 · ThaneVIJAY ASSOCIATES (WADHWA) · P51700009882 · possession Dec 2021 · 90.9% built · 5 complaints
- SANGHVI PARSSSVA CITY · AtgaonSANGHVI PREMISES PRIVATE LIMITED · P51700009886 · possession Mar 2025 · 81.8% built
- DHANLAXMI APARTMENT BLDG NO.1 D Wing · KalyanBhagwati Abhilasha Conventure · P51700009900 · possession Mar 2022 · 51.8% built
- SHILPA CHS · ThaneYASH INFRA · P51700009903 · possession Dec 2020 · 90.9% built
- NEPTUNE SWARAJYA SECTOR 1- A14 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LIMITED · P51700009907 · possession Jun 2018 · 57.5% built
- NANDRAJ NAGARI TYPE E · Badlapur (M Cl)SWARAJ DEVELOPERS · P51700009908 · possession May 2018 · 81.8% built
- NEPTUNE SWARAJYA SECTOR 2 - B 19 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LTD · P51700009912 · possession Dec 2019 · 57.1% built
- SADGURU KRIPA APARTMENT · AmbarnathSADGURU DEVELOPER · P51700009917 · possession Dec 2018 · 40.9% built
- MANGESHI CRYSTAL · KalyanMangesh Dashrath Gaikar · P51700009923 · possession Jun 2018 · 90.9% built · 1 complaint
- Tycoons Square Avenue I Tower C · KalyanTycoons Avanti Projects Pvt. Ltd. · P51700009933 · possession Jun 2027 · 23.5% built · 18 complaints
- Gautam Co-operative Housing Society · ThaneMahesh Shriram Borkar · P51700009938 · possession Jul 2018 · 100% built
- UNIQUE ORBIT II · MIRA ROAD EASTUNIQUE SHANTI REALTORS · P51700009949 · possession Dec 2021 · 90.9% built
- Gayatri Complex · KalyanKanubhai Mohanbhai Lakkad · P51700009950 · possession Aug 2024 · 81.6% built
- DELTA VRINDAVAN · ThaneDelta venture · P51700009969 · possession Mar 2021 · 100% built · 2 complaints
- Godrej Alive E · Thane (M Corp.)Modella Textile Industries Limited · P51700009992 · possession Dec 2025 · 0% built · 1 complaint
- Godrej Alive C · Mulund Thane CircleModella Textile Industries Limited · P51700009993 · possession Dec 2025 · 0% built · 2 complaints
- SAFFRON ENCLAVES · ThaneGREEN AVENUE CONSTRUCTIONS · P51700010007 · possession Mar 2021 · 100% built
- KAVERI · KalyanSAMARTH DEVELOPERS · P51700010020 · possession Dec 2018 · 58.2% built
- SARVODAY SQUARE PHASE 1 BLDG. NO. 3,4 AND 7 · AmbarnathSHREE SQUAREFEET ENTERPRISES LLP · P51700010034 · possession Dec 2021 · 90.9% built
- PATEL ESTATES · GANDHI CHOWKVINOD GORDHANBHAI PATEL · P51700010036 · possession Jun 2019 · 72.7% built
- B-1 Mukta Heights · ThanePRAVIN SAKHARAM PATIL · P51700010086 · possession Mar 2018 · 76.4% built
- Shivkripa Residency · ThaneRohit Developers · P51700010093 · possession May 2018 · 77.3% built
- Ramdev Vaayu · ThaneManoj Motaji Purohit · P51700010095 · possession Mar 2018 · 82.7% built
- ORCHID ARCADE · VASHI, NAVI MUMBAISWASTIK ANMOL BUILDERS AND DEVELOPERS · P51700010098 · possession Dec 2028 · 82.7% built
- NEPTUNE SWARAJYA SECTOR 2- B7, B21, B22A, B22B, B22C · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LTD · P51700010102 · possession Dec 2027 · 10.9% built · 2 complaints
- PUSHKAR APARTMENT · Badlapur (M Cl)SAYALEE SANJESH PATKAR · P51700010103 · possession Mar 2019 · 41.8% built
- ATLANTA RESIDENCY PHASE II · BhiwandiSRI BALAJI DEVELOPER · P51700010106 · possession Dec 2026 · 47.3% built · 1 complaint
- Indira Niwas Annex · ThaneShree Swami Krupa Builders and Developers · P51700010108 · possession Dec 2018 · 90.9% built
- PALVA MILANO D, G · KalyanPalava Dwellers Private Limited · P51700010109 · possession Mar 2023 · 72.7% built · 3 complaints
- CHARMS MEADOWS PHASE I · Asangaon (CT)CHARMS PRIDE · P51700010110 · possession Mar 2018 · 90.5% built · 3 complaints
- VARDHMAN GARDEN PHASE 1 · ThaneDIWALI CONSTRUCTION COMPANY · P51700010128 · possession Dec 2019 · 90.9% built
- AMBER ARCADE · Badlapur (M Cl)MAITRI DEVELOPERS · P51700010130 · possession Dec 2018 · 81.8% built
- JOLLLY APARTMENT WING A AND B · Shahapur (CT)RIEL INFRASTRUCTURE PVT LTD · P51700010153 · possession Dec 2021 · 82.3% built · 13 complaints
- AVANTIKA RESIDENCY · Badlapur (M Cl)SANCHITA CONSTRUCTION · P51700010159 · possession Aug 2019 · 90.9% built
- SADASHIV PURAM · Ambarnath(M Cl)SATYABHAMA DEVELOPERS · P51700010168 · possession Mar 2018 · 90.9% built
- MURLIDHAR PLAZA · Badlapur (M Cl)SAIPOOJAN ENTERPRISES · P51700010173 · possession Dec 2021 · 45.5% built
- QUALITY HEIGHTS I · ThaneQUALITY CONSTRUCTION CO · P51700010184 · possession Dec 2019 · 90.9% built
- Mateshwari Altura B and C Wing · KalyanMateshwari Realtors · P51700010188 · possession Dec 2023 · 64.1% built · 27 complaints
- LAABH NEELKANTH · ThaneLAABH BUILDTECH · P51700010195 · possession Dec 2019 · 83.9% built
- Elite Platina 20 · ThaneVIJAY ASSOCIATES (WADHWA) · P51700010204 · possession Dec 2021 · 100% built · 1 complaint
- NAMASKAR CO-OP HSG SOCIETY · Ambarnath (R)V. R. BUILDERS · P51700010208 · possession Mar 2023 · 100% built
- SAI GANESH · ThaneSAI DEVELOPERS · P51700010214 · possession Dec 2017 · 100% built
- M M VALEY A2 · ThaneALFA ENTERPRISES · P51700010237 · possession Dec 2022 · 87.5% built · 2 complaints
- NAYANTARA ASSOCIATES · KalyanNAYANTARA ASSOCIATES · P51700010238 · possession Dec 2021 · 84.5% built
- MANGALMURTI ARCADE · KalyanSHREE HANUMAN KRUPA ENTERPRISES · P51700010245 · possession Jun 2019 · 100% built
- DHARMAVIHAR · BhiwandiMKY Infrastructure · P51700010249 · possession Apr 2019 · 90.9% built · 1 complaint
- KRUSHNAI · KalyanWELFARE CONSTRUCTION · P51700010252 · possession Oct 2020 · 82.7% built
- Shree Ganraya Apartments · Near Sai baba TempleMahesh Shyamsundar Goyal · P51700010259 · possession Dec 2018 · 100% built
- BHARAT RESIDENCY · KLAYANSHIVSAI BUILDERS & DEVELOPERS · P51700010262 · possession May 2018 · 51.4% built
- KUBER AAGAN · KalyanCRATIVE HOME MAKERS · P51700010264 · possession Dec 2019 · 63.6% built · 3 complaints
- INDRA HEIGHTS · KalyanBHOIR AND SONS · P51700010267 · possession Mar 2019 · 54.5% built
- NISARG · Badlapur (M Cl)SHREE SAI UNITY BUILDERS AND DEVELOPERS · P51700010273 · possession Dec 2017 · 90.9% built
- PATELS ELYSIUM - 3 · Ambarnath(M Cl)APACE REALTY · P51700010280 · possession Oct 2023 · 87.3% built
- JALAL MANSION · Kalyan-Dombivali (M Corp.)MARYAM ENTERPRISES · P51700010284 · possession Dec 2018 · 44.5% built
- DEV AANGAN · Near Bavan Jinalaya MandirSDC PROPERTIES PRIVATE LIMITED · P51700010286 · possession Jan 2026 · 100% built
- NEPTUNE SWARAJYA SECTOR 1-A5 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LIMITED · P51700010289 · possession Jun 2018 · 59.2% built · 1 complaint
- Salasar Aarpan A Wing · Mira-Bhayandar (M Corp.)Salangpur Gruh Nirman · P51700010292 · possession Jun 2020 · 90.9% built · 1 complaint
- SUDAMA GREENS · ThaneSACHIN SUDAM PATIL · P51700010295 · possession Dec 2017 · 90.9% built
- Godrej Alive A · Mulund Thane CircleModella Textile Industries Limited · P51700010303 · possession Dec 2025 · 0% built · 2 complaints
- AVIGHNA KARAN WING A · KalyanAVIGHNA KARAN · P51700010306 · possession Mar 2019 · 90.9% built
- NEWA BHAKTI KNOWLEDGE CITY COMMERCIAL BUILDING PHASE 1 · ThaneNEWA TECHNOCITY (I) PRIVATE LIMITED · P51700010310 · possession Mar 2023 · 90.9% built
- BALAJI RESIDENCY · KalyanOM SWAYAMBHU SIDDHIVINAYAK BUILDERS AND DEVELOPERS · P51700010313 · possession Dec 2023 · 80.9% built
- PATELS ELYSIUM - 5 · Ambarnath(M Cl)APACE REALTY · P51700010318 · possession Dec 2022 · 33.2% built
- PARSHVADHARA · Badlapur (M Cl)PARSHVANATH DEVELOPERS · P51700010323 · possession Apr 2019 · 70.2% built · 1 complaint
- Seven Eleven Regency · Mira-Bhayandar (M Corp.)Seven Eleven Construction Private Limited · P51700010338 · possession Mar 2018 · 90.9% built
- TEEJADEEP HEIGHTS · ThaneTEEJADEEP DEVELOPERS · P51700010345 · possession Sept 2019 · 91.8% built · 1 complaint
- Shantiniketan Wing B · KalyanAnmol Associates · P51700010349 · possession Dec 2018 · 87.2% built
- ARIHANT CITY PHASE-II - E BUILDING · BhiwandiDIMPY INFRA VENTURES PVT LTD · P51700010350 · possession Dec 2025 · 100% built · 2 complaints
- SMITAL AVENUE · Mira-Bhayandar (M Corp.)D. L. BUILDERS PVT. LTD. · P51700010363 · possession Mar 2018 · 86.4% built
- The Residences · KalyanVaijanath Realtors LLP · P51700010368 · possession Dec 2018 · 72.7% built
- BALAJI ARCADE WING B · KalyanSHIKHAR DEVELOPERS · P51700010369 · possession Dec 2019 · 78.2% built
- VINAYAK KONDILKAR ARCADE · Badlapur (M Cl)VINAYAK BUILDERS & DEVELOPERS · P51700010372 · possession Dec 2017 · 90.9% built
- Shantiniketan Wing B3 · KalyanAnmol Associates · P51700010374 · possession Dec 2019 · 75% built
- NEPTUNE SWARAJYA SECTOR 2 - B11 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LTD · P51700010381 · possession Dec 2019 · 56.6% built · 1 complaint
- THE ADDRESS BUILDING NO.5 · MIRA ROAD EASTSTRAWBERRY CONSTRUCTIONS PVT. LTD. · P51700010395 · possession Dec 2028 · 9.1% built · 2 complaints
- MARATHE ELENZA · titwalaSAIJI DEVELOPERS · P51700010396 · possession Jul 2026 · 100% built
- KOOL BREEZE PHASE II · Badlapur (M Cl)ABHISHEK SHELTERS LTD · P51700010400 · possession May 2018 · 84.5% built
- TIARA HILLS PHASE I BLDG NO 3, 5 AND 2 · MIRA ROAD EASTPNK SPACE DEVELOPMENT PVT LTD · P51700010406 · possession Dec 2026 · 71.1% built · 8 complaints
- SHIV SIDDHI · mharalKEDAR CONSTRUCTION · P51700010414 · possession Jun 2023 · 90% built
- KABINI · Chavindrashree shakti developers · P51700010423 · possession Dec 2025 · 90.9% built
- MANGALMURTI HOMES · KalyanSARVODAYA LAND DEVELOPERSDEVELOPERS · P51700010429 · possession Dec 2019 · 100% built
- Sahajeevan Residency Bldg 2, C-Wing · KalyanPappu Developers & Group · P51700010437 · possession Jun 2019 · 81.8% built
- SATYAM OLEANDER · Ambarnath(M Cl)SAHYOG GROUP · P51700010440 · possession Dec 2019 · 74.2% built · 2 complaints
- HORIZON HEIGHTS D · ThaneSHREENATH ENTERPRISES · P51700010444 · possession Jul 2018 · 84.1% built
- Raviraj Spring · Mira-Bhayandar (M Corp.)MIra Housing Development Corporation · P51700010445 · possession Dec 2018 · 77.3% built
- GREEN WOODS · ThaneVANTAGE LAND DEVELOPERS · P51700010446 · possession Dec 2021 · 96.4% built · 1 complaint
- SWAROOP ORCHID · Badlapur (M Cl)SWAROOP CONSTRUCTION · P51700010451 · possession Jun 2018 · 81.4% built
- SHUBH SRUSHTI · Badlapur (M Cl)VINAYAK ENTERPRISES · P51700010469 · possession Oct 2018 · 55.5% built
- CHANDRA BHAGA · KATEMANEVALIVITTHAL MAULI CONSTRUCTION COMPANY · P51700010487 · possession Aug 2023 · 34.5% built
- ADITYA APARTMENTS · BapsaiNAVIN NARANJI JAIN · P51700010512 · possession Dec 2018 · 90.9% built
- GAYATRI PARK · ThaneVIKRAM BUILDERS · P51700010528 · possession Apr 2018 · 90.9% built · 1 complaint
- SHANKAR COMPLEX II · KalyanJARIMARI RESIDENCY · P51700010530 · possession Dec 2019 · 44.5% built
- MALHARI GHORPADE ARCADE BUILDING NO 4 AND 5 · KulgaonYAMUNA ENTERPRISES · P51700010573 · possession Feb 2021 · 59.8% built
- KAVYA PARK · THANESHREE CONSTRUCTION COMPANY · P51700010575 · possession Jun 2027 · 53.6% built · 17 complaints
- SHANTI GARDENS, SECTOR 5, BLDG. NO.8 · SHANTI GARDENSRAMNAGAR DEVELOPMENT CORPORATION · P51700010577 · possession Dec 2022 · 90.5% built
- Goldcrest Residency - Phase 2 · GHANSOLISAVITA HOMEMAKERS LLP · P51700010579 · possession Mar 2027 · 97.3% built · 115 complaints
- NEW GLOBAL E-BUILDING · BhiwandiCLASSIC CONSTRUCTION · P51700010601 · possession Dec 2021 · 90.9% built
- MAHADEV PARADISE · BHAYANDARNANDKUMAR MAHADEV PATIL · P51700010608 · possession Jul 2019 · 61.5% built
- Datar Heights · Badlapur (M Cl)Saleem Abdul Shaikh · P51700010631 · possession Oct 2021 · 41.4% built
- Sai Savitri Villa · ThaneSavitri Group · P51700010636 · possession Sept 2019 · 90.9% built · 2 complaints
- Mohan Suburbia IIB · AmbernathMOHAN LIFESPACES LLP · P51700010658 · possession Mar 2019 · 89.1% built · 1 complaint
- SHREE SAI KABADI WAINGANKAR COMPLEX · KhativaliDevidas Anant Waingankar · P51700010661 · possession Jul 2026 · 80.8% built
- INDRAYANI · MandaNARESH YASHWANT PATIL · P51700010665 · possession Oct 2026 · 74.5% built
- SHIVSAI HIGHTS · KATEMANEVALISHIVSAI ENTERPRISES · P51700010671 · possession Dec 2022 · 27.6% built
- SWAMI CHINTAMANI · GANDHI CHOWK KALYAN WESTMEENA SADASHIV AGALAVE · P51700010673 · possession Dec 2018 · 40.9% built
- SUYOG · KalyanMADHAV BHALCHANDRA PARANJAPE · P51700010683 · possession Dec 2017 · 81.8% built
- AMAKIN MOHAMMADIYA COMPLEX PHASE III · KalyanRAJ CORPORATION · P51700010706 · possession Dec 2024 · 38% built
- Mangeshi Paradise - I · Kalyan-Dombivali (M Corp.)Annapurna Universal · P51700010709 · possession Dec 2017 · 86.4% built
- MAN ITELLIPARK - IT · NERULMERINO SHELTERS PRIVATE LIMITED · P51700010714 · possession Dec 2021 · 6.4% built
- SAROVAR DARSHAN · BhiwandiSHRI KHATU CONSTRUCTION · P51700010720 · possession Jun 2026 · 88.5% built
- SHREE HARI DARSHAN BUILDING NO 7 · ThaneSHUBHAM ENTERPRISES · P51700010725 · possession Dec 2024 · 27.3% built
- MATOSHRI HEIGHTS · KalyanSUJAL DEVELOPERS · P51700010731 · possession Jun 2021 · 90.9% built
- Mohan Waters Edge II · BADLAPURMOHAN LIFESPACES LLP · P51700010737 · possession Dec 2021 · 89.1% built
- NICE CITY · ThaneNICE REALTY AND DEVELOPERS · P51700010742 · possession Dec 2025 · 89.1% built
- Shri Swami Samarth Residency · ThaneShri Swami Samartha Developers · P51700010749 · possession Dec 2021 · 4.5% built
- NEELKANTH JYOT · SapePRAPTI ENTERPRISES · P51700010769 · possession Jun 2019 · 90.9% built
- FAIRMOUNT · ThaneFINE ART PROJECT MANAGEMENT CONSULTANTS PVT LTD · P51700010770 · possession Dec 2019 · 100% built
- Aarya Heights · ThaneSHAILESH SHOBNATH MISHRA · P51700010776 · possession Dec 2017 · 90.9% built
- NIRAJ RIVIERA - SHIRISH · KalyanShree Samarth Developers · P51700010779 · possession Dec 2021 · 90.9% built
- NEPTUNE SWARAJYA SECTOR 1-A13 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LIMITED · P51700010783 · possession Jun 2018 · 60.6% built
- PANVELKAR SANKALP WING A · AmbarnathGEETAI ENTERPRISES · P51700010787 · possession Nov 2020 · 90.9% built
- ATLANTA EDENWORLD PHASE II · ThaneSAI BALAJI DEVELOPER · P51700010796 · possession Dec 2028 · 27.3% built
- Lok Nagari Developer Ph - II · Ambarnath EastLok Nagari Developer · P51700010802 · possession Dec 2021 · 90.9% built · 4 complaints
- Shankar Heights Phase 2 Krishna Wing · AmbarnathLaxmi Kamal Associates · P51700010806 · possession Dec 2018 · 90.5% built
- Shankar Heights, Phase 3 · AmbarnathLaxmi Kamal Associates · P51700010807 · possession Dec 2018 · 90% built
- Riverwood Park Building No. 5 · Dombivali EastShree Khidkaleshwar Property Developers Pvt. Ltd. · P51700010819 · possession Feb 2025 · 100% built
- Centilia · Thane (M Corp.)Acme Housing India Private Limited · P51700010837 · possession Dec 2017 · 54.5% built · 1 complaint
- GARDEN CITY · BhiwandiGARDEN CITY · P51700010840 · possession Dec 2028 · 10% built
- Salasar Aarpan B Wing · Mira-Bhayandar (M Corp.)Salangpur Gruh Nirman · P51700010843 · possession Dec 2020 · 90.9% built · 1 complaint
- AMBRE HEIGHTS · ChikangharOM SAI BUILDERS AND DEVELOPERS · P51700010860 · possession Dec 2018 · 18.2% built
- PENTAGON HEIGHTS · BhiwandiDAMJI HARI CONSTRUCTIONS · P51700010871 · possession Nov 2019 · 90.9% built · 7 complaints
- ARIHANT CITY PHASE-I BUIDING-A,B,C,D,D1,D2,H,H1,H2,F · BhiwandiARIHANT ENTERPRISES · P51700010884 · possession Dec 2025 · 86.5% built
- Shantiniketan Wing A · KalyanAnmol Associates · P51700010899 · possession Dec 2018 · 87.2% built
- GAJANAN NANA HEIGHTS · KalyanVASTU GANESH BUILDERS AND DEVELOPERS · P51700010902 · possession Mar 2019 · 46.4% built
- SHREE HEIGHTS · KalyanSHREE DEVELOPERS · P51700010906 · possession Dec 2017 · 90.9% built
- Basilia · Thane (M Corp.)Acme Housing India Private Limited · P51700010925 · possession Dec 2017 · 54.5% built · 1 complaint
- PALAVA CROWN · KalyanPalava Dwellers Private Limited · P51700010935 · possession Jan 2023 · 81.8% built · 1 complaint
- PALAVA AURORA B, C · KalyanPalava Dwellers Private Limited · P51700010960 · possession Mar 2023 · 72.7% built
- SHUBHAM GALAXY · KalyanNAVKAR & ASSOCIATES · P51700010970 · possession Nov 2020 · 52.7% built
- Renaissance Industrial Smart City - PH I · BhiwandiRENAISSANCE INDUS INFRA PRIVATE LIMITED · P51700010971 · possession Dec 2031 · 56.7% built · 3 complaints
- Indralok Phase I · Kalyan-Dombivali (M Corp.)Honest Enterprise · P51700010974 · possession Dec 2021 · 90.9% built
- SAGAR SRUSHTI B WING · KalyanUMA SAGAR HOMES · P51700010980 · possession Dec 2019 · 90.7% built
- Dosti Imperia - Dosti Majesta · ThaneDOSTI REALTY LTD · P51700010988 · possession Dec 2018 · 100% built · 2 complaints
- VRINDAVAN NIKETAN · Badlapur (M Cl)PRAKASH BHOJRAJ SHEWANI · P51700010990 · possession Dec 2018 · 78.2% built
- Parijat Plaza Type B · Badlapur (M Cl)M/s Parijat Constructions · P51700010993 · possession May 2018 · 80% built
- Jay Vanadana CHS Ltd · ThaneDAYANAND SANJEEV SHETTY · P51700011011 · possession Mar 2022 · 9.3% built
- KASHIDHAM · ThaneSHAH AND DASWANI · P51700011016 · possession Dec 2018 · 45% built
- SALASAR ASHISH · ThaneSALANGPUR REALTY · P51700011018 · possession Mar 2018 · 90.9% built
- PANVELKAR SANKALP WING B · AmbarnathGEETAI ENTERPRISES · P51700011019 · possession May 2019 · 90.9% built
- COSMOS ORCHID · Thane (M Corp.)MONARCH DEVELOPERS · P51700011044 · possession Jun 2019 · 87.3% built
- TIRUPATI COMPLEX · ThaneTIRUPATI DEVELOPERS · P51700011047 · possession Dec 2027 · 90.9% built
- FALCO PEARLSHIRE · Ambivali Tarf ChonAANYA RESIDENCES · P51700011065 · possession Dec 2027 · 39.1% built · 4 complaints
- PALAVA - ESTELA D to G · KalyanPalava Dwellers Private Limited · P51700011068 · possession Mar 2023 · 81.8% built · 6 complaints
- NAIR HEIGHTS · AMBERNATHSHREE SAI DEVELOPERS · P51700011109 · possession Dec 2021 · 31.8% built
- SAI RESIDENCY · Ambarnath(M Cl)KALPAVRUKSHA DEVELOPERS · P51700011113 · possession Jun 2018 · 81.8% built
- SIDHESHWAR COMPLEX BUILDING 1 A WING · TITWALAADESHWAR ASSOCIATES · P51700011114 · possession Dec 2017 · 90.9% built
- NEPTUNE SWARAJYA SECTOR 1- A17 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LIMITED · P51700011115 · possession Jun 2018 · 59.5% built
- NEPTUNE SWARJAYA SECTOR 1- A18 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LIMITED · P51700011116 · possession Jun 2018 · 58.8% built
- AMMAR MEADOWS PHASE 2 · ThaneMEENAR ASSOCIATES · P51700011147 · possession Jun 2018 · 87.3% built · 1 complaint
- HORIZON PALMS II · OWALEK M DEVELOPERS · P51700011148 · possession Apr 2022 · 88.3% built
- SHREEJIS COMPLEX · DOMBIVLISHREE NEELKANTH ESTATE · P51700011165 · possession Jul 2022 · 86.4% built
- NIRMAN AAKASH · KalyanDEEPAK SHANKAR YASHWANTE · P51700011174 · possession Mar 2022 · 78.9% built · 4 complaints
- SHIV GANESH SADAN · KalyanM/S SHIVGANESH BUILDERS & DEVELOPERS · P51700011175 · possession Dec 2018 · 67.7% built
- KRISHNA PRESTIGE · MIRA ROADM/s. Arun Bhoomi Corporation · P51700011183 · possession Sept 2027 · 63.7% built · 94 complaints
- BALAJI AANGAN SHIVAM-A WING · KalyanSHREE SAI BALAJI ENTERPRISES · P51700011189 · possession Dec 2018 · 78.6% built
- NEPTUNE SWARAJYA SECTOR 1-A2 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LIMITED · P51700011191 · possession Jun 2018 · 61.3% built
- NEPTUNE SWARAJYA SECTOR 2 - B16 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LTD · P51700011196 · possession Dec 2019 · 59.2% built
- Shree Ganesh Residency · Asangaon (CT)Amol Padmakar Tarmale · P51700011204 · possession Jan 2021 · 90.9% built
- DHOLES EMPIRE · ThaneELITE DEVELOPERS · P51700011206 · possession Aug 2019 · 90.9% built
- MAITRI HILLS · Badlapur (M Cl)ESHWAR ENTERPRISES · P51700011254 · possession Jun 2019 · 54.5% built
- SHREE PANCHAM · Mira-Bhayandar (M Corp.)SHREE PANCHAM ASSOCIATES · P51700011256 · possession Jun 2018 · 80% built
- SAI HIGHLAND · Badlapur (M Cl)SHREE SAIKRUPA DEVELOPERS · P51700011261 · possession Mar 2022 · 9.1% built
- PATIL HILL VIEW · Badlapur (M Cl)EKDANT DEVELOPERS · P51700011266 · possession Jun 2018 · 85.9% built
- NEELKANTH DEEP · Badlapur (M Cl)KESHAV REALTY · P51700011297 · possession Dec 2020 · 53.6% built
- MAITRI ICON · BhiwandiMAITRI & MAITRI · P51700011301 · possession Jun 2027 · 65.9% built
- UMA RESIDENCY, PHASE I · NAADARSH INFRA DEVELOPERS · P51700011302 · possession Aug 2026 · 48.8% built
- Puneet Kanchanganga Phase One Floor 0 to Floor 25 · ThanePuneet Developers · P51700011319 · possession Dec 2020 · 90.9% built · 3 complaints
- GOPALDHAM · ThaneSHREE HARI DEVELOPERS · P51700011339 · possession Dec 2018 · 34.1% built
- METRO RESIDENCY G WING · Badlapur (M Cl)METRO CONSTRUCTION · P51700011345 · possession Dec 2021 · 90.9% built
- MOUNT VIEW · Ambarnath(M Cl)BALKRISHNA KASHINATH BHOIR · P51700011368 · possession Dec 2017 · 90.9% built
- Radha Regency · Mira-Bhayandar (M Corp.)V.R. Construction Co. · P51700011369 · possession Dec 2018 · 73.6% built · 1 complaint
- Rai Valley A B C Wing · KalyanRAI RESIDENCY Private Limited · P51700011390 · possession Dec 2017 · 89.1% built
- Vaishnavi Heights · Kalyan-Dombivali (M Corp.)Sanjay Shantaram Kankoshe · P51700011393 · possession Oct 2020 · 82.1% built
- RAVIRAJ SPRING · Mira-Bhayandar (M Corp.)M/s RAVIRAJ HOUSING (PRINCE CITY) · P51700011396 · possession Dec 2018 · 77.3% built
- BHAKTI PARK B WING · Badlapur (M Cl)BHAKTI CORPORATION · P51700011425 · possession Mar 2018 · 71.8% built · 1 complaint
- Shantiniketan Wing B4 · KalyanAnmol Associates · P51700011429 · possession Dec 2019 · 75% built
- DREAM SOLITAIRE · ThaneSATYAM CONCAST PRIVATE LIMITED · P51700011431 · possession Dec 2018 · 100% built
- SHREE SWAMI PUSHPA PHASE-1 SHELAR PARK · GandhareSHELAR DEVELOPERS · P51700011433 · possession Jun 2023 · 100% built
- Krishna Pride · CHANAKYA NAGARGajanan Krupa Developers · P51700011439 · possession Jun 2022 · 90.9% built
- TRIMURTI PARK · KalyanTRIMURTI CONSTRUCTION · P51700011458 · possession Dec 2022 · 90.9% built
- RAVI DARSHAN · Badlapur (M Cl)RAVI DEVELOPERS · P51700011461 · possession May 2018 · 66.4% built
- MAULI KRUPA · NAVI MUMBAIVIGHNESH CONSTRUCTIONS · P51700011488 · possession Dec 2026 · 86.4% built
- AASTHA EVERSHINE · TitwalaM/S. AASTHA REALTORS · P51700011493 · possession Dec 2018 · 52.3% built
- SUDAMA ENCLAVE · KalyanRAI RESIDENCY Private Limited · P51700011514 · possession Jun 2018 · 60% built
- Signia Waterfront, Plot No. 1, Sector 12, Airoli, Navi Mumbai · ThanePiramal Sunteck Realty Pvt. Ltd. · P51700011528 · possession Apr 2022 · 100% built · 8 complaints
- Raj Tattva Phase II Wing C and D · ThaneKOTHARI AUTOPARTS MANUFACTURERS PVT LTD · P51700011539 · possession Dec 2019 · 100% built · 16 complaints
- Seven Eleven Residency · Mira-Bhayandar (M Corp.)Seven Eleven Construction Private Limited · P51700011597 · possession Mar 2018 · 90.9% built
- Ornate Kallisto Phase I · BhiwandiOrnate Buildcon Developers · P51700011610 · possession Dec 2021 · 81.8% built · 1 complaint
- PALAVA MILANO E, F · -Palava Dwellers Private Limited · P51700011629 · possession Mar 2023 · 72.7% built · 1 complaint
- YASH REALTORS · LouisewadiYASH REALTORS · P51700011645 · possession Sept 2020 · 100% built
- OM SAI TOWERS · Ambarnath(M Cl)D A CONSTRUCTION · P51700011648 · possession Jan 2018 · 44.5% built
- Kalika Heights Phase II · PANCHPAKHADISanjay shreenath pandey · P51700011655 · possession Jun 2027 · 79.8% built
- BISTURIBAI TOWER · Vadavali Bk.Gauri Vinayak Builder and Developers Pvt Ltd · P51700011660 · possession Nov 2021 · 53.6% built
- VASTU SIDDHI · Ambarnath (R)SIDDHIVINAYAK GROUP · P51700011663 · possession Sept 2019 · 90% built
- MAYURESH PLANET · ThaneSHREEGOPAL JUGALKISHORE BARASIA · P51700011665 · possession Aug 2025 · 86.4% built
- SHIV VATIKA · Ambarnath(M Cl)SHIV ENTERPRISES · P51700011672 · possession Dec 2017 · 90.9% built
- GANPATI RESIDENCY · Badlapur (M Cl)GANPATI RESIDENCY · P51700011720 · possession Dec 2023 · 49.5% built
- JAI MATA DI-PHASE IIIA · BhiwandiJAGDISH JAIRAM PATIL · P51700011723 · possession Mar 2019 · 100% built
- Atulya Shubh Vastu · Aatgaon StationATULYA TOWNSHIP BUILDCOM PVT LTD · P51700011737 · possession Dec 2018 · 10% built
- BHAGIRATHI TOWER · ThaneBALI CONSTRUCTIONS · P51700011738 · possession Jul 2018 · 76% built
- SHIV SIDHHI COMPLEX WING A · SANT TUKARAM ROADGURU OM CONSTRUCTION AND DEVELOPERS · P51700011748 · possession Mar 2031 · 34.5% built
- SUNBERRY · ThaneNEELKANTH INFRATECH CO · P51700011752 · possession Dec 2023 · 100% built
- ORCHID · SHAHAPURROYALE URBANSPACE LLP · P51700011790 · possession Jul 2019 · 90.9% built · 2 complaints
- TULIP N · SHAHAPURROYALE URBANSPACE · P51700011791 · possession Dec 2019 · 53.2% built
- GAURAV ASTER · KashimiraRavi Developments · P51700011796 · possession Dec 2026 · 85.6% built · 20 complaints
- POONAM ESTATE MHADA BLDG NO 8 AND 9 · Mira-Bhayandar (M Corp.)Ravi Developments · P51700011797 · possession Dec 2017 · 90.9% built
- TULIP P · SHAHAPURROYALE URBANSPACE · P51700011815 · possession Dec 2019 · 45.5% built · 1 complaint
- NEELKANTH SHRUSHTI · Kalyan-Dombivali (M Corp.)ASHAPURA COMBINES · P51700011819 · possession Dec 2021 · 90.9% built
- Sanghvi Nesta · patlipadafortunerpjdevelopers · P51700011820 · possession Dec 2026 · 89.8% built
- SHREEMAN RESIDENCY · MANDAOM ENTERPRISES · P51700011833 · possession Dec 2018 · 90.9% built
- Delta Avenue · ThaneDELTA REALTORS · P51700011834 · possession Dec 2018 · 74.1% built
- SEA GREEN APARTMENT · Mira-Bhayandar (M Corp.)AAKASH BUILDERS & DEVELOPERS · P51700011846 · possession Dec 2022 · 90.5% built · 5 complaints
- NEPTUNE SWARAJYA SECTOR 1-A3 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LIMITED · P51700011861 · possession Jun 2018 · 59.8% built
- Neptune Swarajya Sector 1 - 1A · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LIMITED · P51700011863 · possession Jun 2018 · 57.8% built
- MOHAN PALMS · ThaneV M CONSTRUCTIONS · P51700011876 · possession Dec 2021 · 27.3% built
- YASH ASHOKA · ThaneSHREE SAI YASH REALTORS · P51700011888 · possession Jun 2018 · 100% built
- Atmaram Sadan · ThaneAditya Associates · P51700011909 · possession Mar 2018 · 63.4% built
- NEPTUNE SWARAJYA SECTOR 2 - B5 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LTD · P51700011913 · possession Dec 2019 · 49% built · 2 complaints
- SPAN SIGNATURE · Mira-Bhayandar (M Corp.)ANNAPURNA BUILDCON INFRA PVT LTD · P51700011940 · possession Dec 2024 · 81.8% built
- SHREE SAI DARSHAN · Kalyan-Dombivali (M Corp.)SHREE SIDDHIVINAYAK BUILDERS & DEVELOPERS · P51700011942 · possession Mar 2018 · 90.9% built
- SHIV SAGAR APARTMENT · Ambarnath(M Cl)LAXMI SAGAR DEVELOPERS & BUILDERS · P51700011952 · possession Nov 2020 · 100% built
- KRISHNA KUNJ · Badlapur (M Cl)KRISHNA ASSOCIATES · P51700011958 · possession Mar 2018 · 81.8% built
- SHREE KAMAKHYA CHAMBERS · ThaneSHRIPRAKASH VIJAYNATH RAI · P51700011960 · possession Mar 2023 · 90.9% built
- ROYAL FLORA · BhiwandiSHRI AADINATH REALTY · P51700011975 · possession Dec 2027 · 83.6% built · 4 complaints
- ANIRUDDHA LANDMARK · Navi Mumbai (M Corp.)VASUDEV VISHWANATH PATIL · P51700011992 · possession Mar 2019 · 55.5% built
- NEPTUNE SWARAJYA SECTOR 2 - B13 · Kalyan-Dombivali (M Corp.)NEPTUNE DEVELOPERS LTD · P51700012000 · possession Dec 2019 · 62.7% built
- MONARCH SOLITAIRE · UlhasnagarMONARCH SOLITAIRE LLP · P51700012008 · possession Dec 2026 · 75.4% built · 29 complaints
- M/s. Shubham Karoti Complex Phase - II · Badlapur (M Cl)M/s. Shubham Karoti Enterprises · P51700012010 · possession Dec 2018 · 36.4% built
- SAI PANACH · BhiwandiPANACH RELATORS · P51700012012 · possession Mar 2018 · 90.9% built · 2 complaints
- Hubtown Greenwoods - C Wing · ThaneHubtown Limited · P51700012016 · possession Jul 2018 · 90.4% built
- PATHAK RESIDENCY · Badlapur (M Cl)SHREE MAHALAXMI CONSTRUCTIONS · P51700012027 · possession Mar 2019 · 100% built
- SONU AAI COMPLEX · ThaneARVIND GOPAL PATIL AOP · P51700012035 · possession Dec 2022 · 84.7% built
- AMRUT PEARL BUILDING NO 1 · GauripadaAMRUT BUILDERS · P51700012040 · possession Dec 2022 · 100% built
- SHREEJI GARDEN · BadlapurSHUBH DEVELOPERS · P51700012054 · possession Dec 2021 · 24.4% built
- SAFFRON HILLS · Badlapur (M Cl)ALPHA COMBINES · P51700012065 · possession Dec 2020 · 68.2% built
- VAKRATUND · ThaneSHREE SIDDHI VINAYAK DEVELOPERS · P51700012072 · possession Jul 2018 · 90.9% built
- DHARTI HILLS · Ambarnath(M Cl)KRISHNA ENTERPRISES · P51700012074 · possession Dec 2017 · 90.9% built
- PHOENIX AVENUE · GandharePHOENIX INFRASTRUCTURE AND DEVELOPERS · P51700012079 · possession Jun 2018 · 68.6% built
- hillcrest appartments · Titwalaaasanghar construction · P51700012086 · possession Dec 2026 · 65.9% built · 48 complaints
- BALAJI AANGAN SHIVAM-B WING · KalyanSHREE SAI BALAJI ENTERPRISES · P51700012104 · possession Feb 2019 · 78.2% built
- USHA KIRAN RESIDENCY WING E1 E2 E3 · Badlapur (M Cl)STALWART IMPEX PVT LTD · P51700012135 · possession Dec 2017 · 84.8% built
- GRAND ARENA · ThaneS H CONSTRUCTIONS · P51700012136 · possession Nov 2019 · 66.3% built · 1 complaint
- USHA JOSHI PARK PHASE B · KhadavaliJ K T BUILDERS & DEVELOPERS · P51700012148 · possession Jun 2023 · 18.6% built
- ONE PLATINUM · ThanePLATINUM LIFESPACES · P51700012154 · possession Dec 2023 · 100% built · 1 complaint
- HILL GALAXY · MIRA ROADR R BUILDERS · P51700012160 · possession Jun 2022 · 53.2% built
- SEASONS ELITE · ThaneSAI MAHAVIR DEVELOPERS · P51700012166 · possession Aug 2019 · 81.8% built
- MORYA RESIDENCY · Badlapur (M Cl)SAIRATNA CONSTRUCTION · P51700012171 · possession Sept 2020 · 80% built
- MANJIRI HEIGHTS · KalyanYASH INFRASTRUCTURE · P51700012188 · possession Jun 2018 · 78.2% built
- Venkatesh Heights · ThaneM/S Shree Balaji Foundation · P51700012201 · possession Dec 2021 · 90.9% built
- BHAWANI CONSTRUCTION · Mira-Bhayandar (M Corp.)BHAWANI CONSTRUCTIONS · P51700012204 · possession Dec 2023 · 27.3% built
- AASARA CO-OP. HOUSING SOCIETY LTD. · ThaneSHREE SAIBABA GRIHANIRMITI PRIVATE LIMITED · P51700012205 · possession Dec 2021 · 44.8% built · 1 complaint
- Shantiniketan Wing C · BhoparAnmol Associates · P51700012214 · possession Dec 2018 · 85% built
- Balaji Arcade Wing A · KalyanSHIKHAR DEVELOPERS · P51700012219 · possession Dec 2019 · 90.9% built
- DHAVLGIRI · Ambarnath(M Cl)PERFECT BUILDERS · P51700012227 · possession Apr 2018 · 53.3% built
- HG- A1 · ThaneSIDDHI REAL ESTATE DEVELOPERS · P51700012247 · possession Dec 2029 · 10.5% built
- AL HADI RESIDENTIAL COMPLEX · ThaneSAHYADRI GRIH NIRMAN · P51700012253 · possession Jun 2023 · 44.8% built
- JAI SANTOSHI MATA HEIGHTS · DOMBIVLIRAJIV THAKUR & ASSOCIATES · P51700012270 · possession Mar 2018 · 77.3% built
- Aishwarya Heights · KalyanGauri Vinayak Builder and Developers Pvt Ltd · P51700012271 · possession Sept 2018 · 82.7% built
- DAIMOND LIFESPACE · Badlapur (M Cl)EKVEERA SKYLINER CONSTRUCTION CO PRIVATE LIMITED · P51700012282 · possession Dec 2018 · 100% built · 7 complaints
- SHUBH HILLS · Badlapur (M Cl)VARDHMAN ENTERPRISES · P51700012310 · possession Jul 2018 · 63.6% built
- KRISHNA PARADISE · Kalyan-Dombivali (M Corp.)GOPAL KRISHNA DEVELOPERS · P51700012318 · possession Jun 2019 · 90.9% built
- UTSAV · BhiwandiCLUBLIFE REALTORS PRIVATE LIMITED · P51700012319 · possession Jan 2028 · 61.6% built · 53 complaints
- RTG Shiv Srishti · kalyanRTG Infrastructure and Realtors Limited · P51700012322 · possession Dec 2028 · 48.4% built · 8 complaints
- NIRMAL DHARA · Badlapur (M Cl)SIDDHIVINAYAK ENTERPRISES · P51700012325 · possession Dec 2019 · 90.9% built
- Aghav Resideny · AtgaonAghav Developers · P51700012349 · possession Jul 2027 · 41.8% built
- Sai Crystal · Ambarnath(M Cl)Shraddha Corporation · P51700012359 · possession Apr 2018 · 90.9% built
- LEENA APARTMENT · Ambarnath(M Cl)Heramb Developers · P51700012362 · possession Jun 2018 · 50% built
- GOLDCREST RESIDENCY - PHASE 1 · ThaneSAVITA HOMEMAKERS LLP · P51700012365 · possession Dec 2020 · 97.4% built · 11 complaints
- CHANDRANGAN RESIDENCY TYPE- A · ThaneEKVEERA ENTERPRISES · P51700012376 · possession Dec 2019 · 100% built
- Shree Siddhivinayak Tower · ThaneEkdant Constructions and Developers Private Limited · P51700012381 · possession Dec 2020 · 90.9% built · 1 complaint
- KRISHNA RESIDENCY · Badlapur (M Cl)KRISHNA ENTERPRISES · P51700012391 · possession Nov 2018 · 56.4% built
- AUDUMBER · ThaneAADYASHAKTI ENTERPRISES · P51700012435 · possession Dec 2018 · 89.5% built
- Riddhi Siddhi · Badlapur (M Cl)SHREEJI & INNOVATIVE DEVELOPERS · P51700012445 · possession Dec 2018 · 81.8% built
- DEVRAM SMRUTI · DOMBIVLIPATIL AND ASSOCIATES · P51700012446 · possession Jun 2022 · 100% built
- RAI PARADISE · KalyanRAI RESIDENCY Private Limited · P51700012449 · possession Dec 2018 · 80% built
- SHANKAR PALACE · Thaneshree ramesh homes builders and developers · P51700012469 · possession Oct 2023 · 90.9% built · 2 complaints
- SHUBH AARAMBH · Badlapur (M Cl)PACIFIC CONSTRUCTION & DEVELOPERS · P51700012478 · possession Apr 2018 · 50% built
- SRUSHTI RESIDENCY D TYPE WING 1 · DOMBIVLIM/S. KULSWAMINI BUILDERS · P51700012479 · possession Aug 2019 · 41.4% built
- KULSWAMINI PRASSANNA · DOMBIVLIKULSWAMINI DEVELOPERS · P51700012480 · possession Aug 2019 · 90.9% built
- Hira Park · TitwalaM/s Hira Housing Construction Co. · P51700012516 · possession Jun 2027 · 43.6% built · 2 complaints
- Durahomes Builders and developers pvt ltd · chavindraArshad Ahmed Siddiqui · P51700012518 · possession Jul 2028 · 44.5% built
- Madhumalti · Kalyan-Dombivali (M Corp.)Dilip Madhukar Dalvi · P51700012542 · possession Dec 2017 · 90.9% built · 4 complaints
- UTKARSH · DOMBIVLIMADHAV BHALCHANDRA PARANJAPE · P51700012558 · possession Dec 2017 · 90.9% built
- VISHNU HEIGHTS · Ambarnath(M Cl)JAIDEEP CONSTRUCTION · P51700012586 · possession Sept 2018 · 44.1% built
- AMRUTWANI COMPLEX D TYPE · KALYANStone House Developer · P51700012622 · possession Dec 2017 · 90% built
- SHUBHAM GARDEN · ThaneSHUBHAM DRASHTI ENTERPRISES · P51700012672 · possession Dec 2026 · 46.4% built · 1 complaint
- RAHUL EXCELLENCE · AMBARNATHSAROJ SHRAWANKUMAR BAGARIA · P51700012698 · possession Dec 2022 · 60.9% built · 3 complaints
- SAI ENCLAVE · MACCHA PADASAIRAJDEVELOP · P51700012717 · possession Dec 2026 · 36.4% built
- SIDDHIVINAYAK HEIGHT · Thane (M Corp.)SIDDHIVINAYAK DEVELOPERS · P51700012778 · possession Mar 2020 · 54.5% built
- SHALOM JOVE · ThaneCOTTADIYIL ENTERPRISES · P51700012851 · possession Dec 2019 · 90.9% built
- SAKAAR RESIDENCY · ThaneMOHD MUKHTAR ABDUL RAUF KAZI · P51700012858 · possession Dec 2021 · 100% built
- MAHAVIR DREAMLAND · BhiwandiMAHAVIR DREAMLAND · P51700012940 · possession Dec 2023 · 81.8% built
- The Signature · ThaneShree Sawan Buildcon · P51700012987 · possession Sept 2023 · 100% built
- Lodha Mira Road Project 1 · .LODHA DEVELOPERS LIMITED · P51700012991 · possession Nov 2022 · 81.8% built · 8 complaints
- Shanti Luxuria · ThaneRDP Realtores · P51700012995 · possession Dec 2026 · 66.4% built · 71 complaints
- ONE PARK AVENUE - AVENUE 1 · ThanePurva Oak Private Limited · P51700013016 · possession Dec 2026 · 27.7% built · 21 complaints
- SHANKHESHWAR DARSHAN TYPE - B · Bhiwandi (M Corp.)RAMESH GHEVARCHAND TATED · P51700013024 · possession Dec 2021 · 58.2% built
- SHIVKRUPA · ThaneANANT ARJUN MADHAVI · P51700013028 · possession Mar 2018 · 36.4% built
- HARISHREE RESIDENCY-1 · Ambarnath(M Cl)HARISHREE CREATIONS · P51700013029 · possession Dec 2021 · 66.4% built
- vedant nakshatra ABC phase 1 · Badlapur (M Cl)MOHAN HARDASMAL THARWANI · P51700013039 · possession Dec 2017 · 90.9% built
- ASHAPURA BUILDERS AND DEVELOPERS · Ambarnath(M Cl)ASHAPURA BUILDERS AND DEVELOPERS · P51700013043 · possession Dec 2017 · 90.9% built
- YOGI SADAN · SonaleYOGI ENTERPRISES · P51700013045 · possession Jun 2022 · 100% built
- OLIVE RESIDENCY · Thane (M Corp.)GOODWILL PROPERTIES · P51700013056 · possession Dec 2021 · 81.8% built
- PALAVA AURELIA - C, H, I · PalavaPalava Dwellers Private Limited · P51700013073 · possession Jun 2023 · 54.5% built · 2 complaints
- SAHAYOG NIWAS · ThaneSHREE DEVELOPERS · P51700013083 · possession Jan 2020 · 81.8% built
- ONE PARK AVENUE - AVENUE 6 · ThanePurva Oak Private Limited · P51700013100 · possession Dec 2026 · 28.2% built · 6 complaints
- PALAVA ESTELA H, I, J · PalavaPalava Dwellers Private Limited · P51700013145 · possession Jun 2023 · 81.8% built
- PALAVA ESTELA A, B, C · PalavaPalava Dwellers Private Limited · P51700013158 · possession Jun 2023 · 81.8% built · 4 complaints
- BENCHMARK GREENS · VANGANIBENCHMARK EMPIRE · P51700013160 · possession Dec 2028 · 76.7% built
- DATTUSAI COMPLEX BUILDING NO 2 · DOMBIVLISAIRAJ ENTERPRISES · P51700013185 · possession Dec 2017 · 90% built
- HARISHREE RESIDENCY-2 · Ambarnath(M Cl)HARISHREE CREATIONS · P51700013198 · possession Dec 2021 · 44.5% built
- Panvelkar Utsav Phase I · ValivliSai Swarg Enterprises · P51700013199 · possession Dec 2021 · 90.9% built
- GAMI REAGAN · ThaneSHRI GAMI INFOTECH PVT LTD · P51700013200 · possession Dec 2023 · 93% built
- Om Sai Sankul · KalyanOm Sai Constructions · P51700013210 · possession Feb 2023 · 90.9% built
- CALISTA · ThaneSHAKTI DEVELOPERS · P51700013224 · possession Dec 2017 · 100% built
- Mohan Nano estates II · AMBERNATHMOHAN LIFESPACES LLP · P51700013253 · possession Dec 2019 · 90.9% built
- Parshuram Residency · Ambarnath(M Cl)Shree Radha Developers · P51700013256 · possession May 2019 · 39.6% built
- Lodha Majiwada - Tower 1 · ThaneMACROTECH DEVELOPERS LIMITED · P51700013263 · possession Nov 2022 · 81.8% built
- Sky Gardens at Godrej Vihaa · AmbarnathK. R. REAL ESTATE PVT. LTD. · P51700013329 · possession Sept 2026 · 84.7% built · 1 complaint
- SHUBH NISARG · Badlapur (M Cl)VARDHAMAN AND VASTU ASSOCIATES · P51700013375 · possession Dec 2021 · 16.1% built
- Pandurang smruti · KalyanLote Constructions · P51700013381 · possession Jun 2020 · 82.5% built
- SAI SAHARA PHASE 1 WING B AND C · TitwalaSAI JYOT ENTERPRISES · P51700013397 · possession Jul 2018 · 88% built
- AARSH AVENUE - SAAL WOOD AND SILVER WOOD · BEHIND BHARAT COLLEGESATYAM CONSTRUCTION · P51700013399 · possession Dec 2019 · 90.9% built
- VASTU SHILP · Badlapur (M Cl)VASTU HOMES · P51700013407 · possession Mar 2018 · 72.7% built
- Om Sai Residency · MandaOm Sai Residency · P51700013426 · possession Dec 2017 · 90.9% built
- Siddharth Apartment · Badlapur (M Cl)Rohan Gruh Nirman · P51700013427 · possession Mar 2018 · 60.9% built
- DASARATH PLAZA · KalyanPRABHAT BUILDERS & DEVELOPERS · P51700013428 · possession Mar 2021 · 65.5% built
- SWANAND TREO BUILDING NO 3 -SWAMI GANNAYAK · BADLAPURSWANAND HEIGHTS · P51700013459 · possession Dec 2017 · 90.9% built
- PALAVA MARVELLA B,C,D,E,F,G · .Palava Dwellers Private Limited · P51700013462 · possession Jun 2023 · 76.7% built · 4 complaints
- shree siddhivinayak residency · AmbernathSUNIL BHAGCHAND TALREJA · P51700013467 · possession Nov 2020 · 61.4% built
- Snehadeep Co-Operative Housing Society Ltd · ThaneJOSHI ENTERPRISES · P51700013473 · possession Jul 2018 · 90.9% built · 4 complaints
- Swrnim Residency · MurbadDYS BUILTCON · P51700013476 · possession Dec 2021 · 100% built
- SAI RESIDENCY · kharvaiSAI RAJ DEVELOPERS · P51700013477 · possession Dec 2021 · 90.5% built
- SAMRUDDHI · DOMBIVLIKishor Ramchandra Kulkarni · P51700013478 · possession May 2019 · 74.5% built
- VARSHA PALM · DOMBIVLISHREE UMIYA DEVELOPERS · P51700013493 · possession Dec 2020 · 100% built
- Sun Orchid · ThaneMOHAMMED SIRAJ BASHEER · P51700013513 · possession Dec 2018 · 90.9% built
- Om Shrinivas Apartment · Badlapur (M Cl)Shriniwas Developers · P51700013518 · possession Mar 2018 · 64.5% built
- NANDANVAN HOMES-C1 · ThaneSHREE KRUPA BUILDERS · P51700013525 · possession Jun 2018 · 100% built
- RABIYA RESIDENCY · Bhiwandi (M Corp.)A R CONSTRUCTION · P51700013542 · possession Sept 2019 · 47.3% built
- NEELS RESIDENCY · Ambarnath(M Cl)S.A. SINGH BUILDERS AND DEVELOPERS · P51700013572 · possession Nov 2018 · 59.1% built
- Rohini · ThaneThilayaparambil Kumaran Joshi · P51700013602 · possession Dec 2024 · 90.9% built
- TALL RESIDENCY · TEMGHARTALL CONSTRUCTIONS · P51700013609 · possession Dec 2028 · 30.6% built
- SAI REGENCY · NEAR AYYAPPATEMPLE, GAURIPADASAI DEVELOPERS · P51700013647 · possession Aug 2023 · 89.8% built · 14 complaints
- Rustomjee Azziano Wing K · ThaneKapstone Constructions Private Limited · P51700013649 · possession Sept 2022 · 89.8% built · 1 complaint
- SHANKHESHWAR PLATINUM PHASE 2 · Kalyan-Dombivali (M Corp.)SHANKHESHWAR KREATERS · P51700013669 · possession Mar 2022 · 90.9% built