- ATHARVA APARTMENT · HaveliEVEREST DEVELOPERS · P52100006662 · possession Dec 2020 · 100% built
- YASHODA AANGAN · ThergaonKONARK ASSOCIATES · P52100006664 · possession Jun 2023 · 76.6% built · 1 complaint
- TruSpace Prima Domus Phase 1 · Near MITCONAtharva Enterprises · P52100006671 · possession Apr 2019 · 100% built
- ICHHAPURTI RESIDENCY · Talegaon Dabhade (M Cl)SHREYASH ENGINEERS AND DEVELOPERS · P52100006673 · possession Aug 2019 · 9.1% built
- DELLA VILLA PHASE 4 · LONAVALADELLA ENCLAVE PRIVATE LIMITED · P52100006680 · possession Dec 2021 · 72.7% built · 1 complaint
- ASHWAMEDH INTEGRA · BanerASHWAMEDH SPACES PRIVATE LIMITED · P52100006694 · possession Jul 2018 · 50% built
- ATHARVA BLISS PHASE I · Bavadhan BKM/s. Abhay Constructions · P52100006701 · possession Dec 2017 · 87.9% built
- INSPIRA PHASE I · Kondhwa BudrukANAND REALTIES · P52100006715 · possession Dec 2018 · 56.6% built
- Golden Trellis F and G · BanerGolden Trellis Developments · P52100006717 · possession Dec 2018 · 85.2% built
- ASMANT · SusKULKARNI SCHEME · P52100006724 · possession Dec 2018 · 90.9% built
- Akshar Height · Opposite Manohanr Nagar GateAkshar Venture · P52100006726 · possession Mar 2019 · 88.2% built
- CHINMAY VAISHVA · NEAR AMBEGAON POLICE CHOWKICHINMAY VISHWA · P52100006733 · possession Oct 2022 · 100% built
- Bliss county C wing · HaveliVISION DEVELOPERS AND BUILDERS · P52100006734 · possession Dec 2017 · 100% built
- Essenseia2 · kondhwa BKAruna Ashok Bhat · P52100006735 · possession Oct 2018 · 90.9% built
- Shantiniketan Phase II A4 · PuneKumar Builders Consortium · P52100006736 · possession Mar 2020 · 100% built
- Teerth Technospace 12 · BanerTEERTH DEVELOPERS AND TEERTH REALTIES JV · P52100006740 · possession Dec 2019 · 90.9% built
- TANOAK · Pimpri Chinchawad (M Corp.)M/s Vanita Developers · P52100006742 · possession Jun 2018 · 69.1% built
- VISION BOULEVARD - Phase I · Pimpale SaudagarVISION HOMES PROJECT · P52100006755 · possession Mar 2018 · 85.3% built
- ROSHAN ONE WING C · VaraleRAHUL BHAGWANDAS SANKLA · P52100006758 · possession Mar 2019 · 81.8% built
- SHARVARI WINDGATES, PHASE-I · PunawaleADINATH DEVELOPERS · P52100006771 · possession Dec 2017 · 72.7% built
- Rajgruhi Residency Tower A · KondhwaWellbuild Merchants Private Limited · P52100006776 · possession Dec 2020 · 88.3% built
- Green Avenue · BanerGreen Concept Builders & Developers · P52100006788 · possession Jan 2021 · 38.6% built
- Westros · BanerKundan Mehta Associates · P52100006792 · possession Jun 2018 · 100% built
- SAMRUDDHI ISHA · KIVALESAMRUDDHI ENTERPRISES · P52100006794 · possession Dec 2023 · 70.9% built · 7 complaints
- Marvel Bounty J Building · HadapsarMARVEL SIGMA HOMES PRIVATE LIMITED · P52100006797 · possession Aug 2025 · 90.9% built · 5 complaints
- Malkans · Pune (M Corp.)Gokhale Builders LLP · P52100006798 · possession Nov 2018 · 80.5% built
- Ashanand Residency C building · KhedAnand Deoram Tambe · P52100006808 · possession Dec 2023 · 81.8% built
- 25 KARAT · Talegaon Dabhade (M Cl)MEGHASWANA CONSTRUCTIONS · P52100006816 · possession Dec 2018 · 43.3% built · 1 complaint
- ORIANA CREST · MulshiBALAJI BUILDERS · P52100006821 · possession Jan 2022 · 65.4% built
- Suvarna Alay · KhedMaheshwari Developers · P52100006825 · possession Dec 2026 · 81.4% built · 2 complaints
- Swarna Siddhi Phase 1 · GopalwadiPLANET PROPERTIES · P52100006832 · possession Dec 2028 · 99.5% built
- FOUR AVENUES · HaveliIKON CONSTRUCTIONS · P52100006853 · possession Dec 2019 · 90.9% built
- RININE · Pune (M Corp.)JKG Associates · P52100006855 · possession Dec 2018 · 83.6% built
- LAXMI ANGAN · MawalSANJAY KRISHNA PATIL · P52100006865 · possession Jul 2018 · 71.4% built
- Atharva Patson Phinix PH II · Chakan (CT)M/S SAMRAT ATHARVA PATSON BUILDERS AND DEVELOPERS · P52100006867 · possession Jul 2023 · 7.9% built
- Central Pride · Pimpri Chinchawad (M Corp.)Shree Sai Ram Developers · P52100006869 · possession Nov 2020 · 100% built
- MOUNTSCAPE · PisoliNAYAN BUILDCON · P52100006878 · possession Jun 2022 · 79.5% built
- SHRIRAM REALITY · Chakan (CT)SHRIRAM REALITY · P52100006883 · possession Sept 2020 · 81.8% built
- UTSAV RESIDENCY · WAGHOLIROYAL DEVELOPERS · P52100006886 · possession Jun 2019 · 81.8% built
- Building A2 Eon Homes · Hinjwadi Ph-3Hinjawadi Infradevelelopment Private Limited · P52100006888 · possession Dec 2021 · 81.8% built
- subhlaksh Residency · HaveliLaxmi Construction Co · P52100006890 · possession Aug 2018 · 81.8% built
- Park Vista Phase 1 · LOHGAONPRIME BUILDCON · P52100006895 · possession Mar 2021 · 100% built
- Eden Spaces · KivaleElysian Realty · P52100006898 · possession Oct 2020 · 66.4% built
- PEBBLES II E BUILDING · Bavadhan BKABHINAV RAINBOW DEVELOPERS AND PROMOTERS LLP · P52100006903 · possession Dec 2018 · 100% built
- Dharamshi Milestone · Bavadhan BKSanjay Navinchandra Dharamshi · P52100006908 · possession Oct 2019 · 37.6% built
- L Square · Sector 9LODHA AND LALWANI ASSOCIATES · P52100006914 · possession Dec 2022 · 72.7% built · 1 complaint
- NIRMAN VIVA · Ambegaon BudrukNIRMAN HOMES · P52100006918 · possession Dec 2018 · 56.4% built
- TERRAZA · Banersanskruti city space · P52100006921 · possession Dec 2018 · 90.9% built · 1 complaint
- SAI LEELA · HaveliSAI CONSTRUCTIONS · P52100006938 · possession Mar 2018 · 81.8% built
- Kingston Serene B1 Building Phase 1 · HandewadiVedant Realtors · P52100006952 · possession Dec 2018 · 90.9% built · 1 complaint
- MAHADKAR RESIDENCY · KothrudP.V,Mahadkar and Associates · P52100006972 · possession Jul 2019 · 99.9% built
- Atharva Shrishti, Phase 1, Wing A · PUNEATHARVA BUILDCON · P52100006976 · possession Jul 2022 · 72.7% built · 3 complaints
- Sanvi Majesty A-D-C · Nanekarwadi (CT)Milestone Developers · P52100006981 · possession Oct 2020 · 100% built · 3 complaints
- SHASHWAT RESIDENCY · Pimpri Chinchawad (M Corp.)DAULAT PANDURANG BHONDVE · P52100006985 · possession Dec 2018 · 90.9% built
- Wisteria Commercial Hub · MundhawaVastuyog Suma Associates · P52100006986 · possession Jul 2018 · 39.5% built
- SANTOSH DREAMS · Pimpri Chinchawad (M Corp.)MANAS PROMOTERS & DEVELOPERS · P52100006993 · possession Dec 2021 · 81.6% built
- GAYATRREE LANDMARK PHASE II · Dange chowkGAYATRREE SKYSCRAPERS · P52100007004 · possession Dec 2022 · 44.8% built · 2 complaints
- Aapla Ghar Ranjangaon Phase II · ShirurMaple City Developers · P52100007009 · possession Dec 2026 · 74.3% built · 2 complaints
- GOLDEN HEIGHTS · JunnarM/S BHAGAT LANDMARKS · P52100007012 · possession Aug 2018 · 70.9% built
- Platinum Park Phase II · HaveliRanjeet Property Developers India Pvt. Ltd. · P52100007013 · possession Dec 2026 · 46.4% built · 10 complaints
- SIDDHI TOWERS A WING · HaveliSATISH BASWANT PATIL · P52100007014 · possession Jan 2023 · 58.2% built
- MARVEL ARCO E BUILDING · HadapsarMARVEL SIGMA HOMES PRIVATE LIMITED · P52100007022 · possession Dec 2018 · 96.8% built · 3 complaints
- SOHAM RESIDENCY · HaveliKHUSHBU REALTIES PVT. LTD · P52100007025 · possession Jan 2020 · 81.8% built
- KESHAV VATIKA · MAVALUDAY INFRA · P52100007032 · possession Dec 2021 · 78.8% built
- SBH Wakad C-3 1st and 2nd Floor · WakadClassic Promoters and Builders Private Limited · P52100007034 · possession Sept 2018 · 81.8% built
- SAI VRUNDAVAN · AmbegaonPRABHAKAR BABURAO THORAT · P52100007037 · possession Mar 2019 · 84.8% built
- SILVER CREST · WakadPRIDE HOMES · P52100007038 · possession Apr 2019 · 63.6% built
- Square Elegance · BanerSquare Construction · P52100007041 · possession Dec 2017 · 100% built
- ESSENCIA HEIGHTS · BALEWADI STADIUMSanskruti & Aditya Associates · P52100007045 · possession Dec 2023 · 90.9% built
- PROJECT AT S.NO 168 H NO 7/A/B/C/28B/30/8/29/3F/3Y · AmbegaonSUNGRACE INFRA PROJECTS · P52100007062 · possession Dec 2024 · 68.2% built
- LAXMI VISHNUPURAM · HaveliLAXMI DEVELOPERS · P52100007068 · possession Dec 2019 · 83.9% built
- Sanvi Marvel · KhedMeghraj Spaces Private Limited · P52100007075 · possession Apr 2021 · 27.1% built · 3 complaints
- Nakshatra I-Land - 2 · MoshiEllora Homemakers Pvt. Ltd. · P52100007078 · possession Jul 2019 · 90.9% built
- CLOUD 11 · charholi khSAINATH DEVELOPERS · P52100007087 · possession Dec 2018 · 90.9% built
- AAYAN- BUILDING 2 · WAGHOLIGANDHI BAFNA CONSTRUCTION PVT LTD · P52100007092 · possession Dec 2019 · 65.9% built
- Sai Tirupati Greens Phase-2 · WadmukhwadiSai Tirupati Properties · P52100007106 · possession Dec 2020 · 81.8% built
- Gulmohar Park A phase 1 · HaveliMercury Artharaj Landmarks AOP · P52100007126 · possession Dec 2019 · 42.7% built
- 24K Sereno Building A · BanerNOW Realty Promoters and Builders Private Limited · P52100007129 · possession Sept 2020 · 100% built
- Gandharva Nagari Phase II, Project II, G-12 · Opp Kendriya ViharVinayak Pandharinath Bhongale · P52100007134 · possession Dec 2020 · 29.1% built
- PRATIBHA TARANGAN · HaveliNATU - KUNJIR DEVELOPERS · P52100007135 · possession Dec 2018 · 44.2% built
- Shriniwas Aangan · HaveliPoonam Nilesh Shedge · P52100007136 · possession Dec 2018 · 81.8% built
- Star Woods Phase I · TathwadeVaishnavi Space Creator · P52100007153 · possession Mar 2018 · 50% built
- Kul Utsav Ph 1 C building · PuneKumar Builders · P52100007155 · possession Oct 2020 · 81.8% built · 2 complaints
- Kul Utsav Ph I E Building · PuneKumar Builders · P52100007157 · possession Nov 2020 · 90.9% built
- HEUU INDUSTRIAL SPACES · AKURDI MIDCSONIGARA JEWELLERS PRIVATE LIMITED · P52100007159 · possession Sept 2020 · 41.8% built
- Kul Utsav Phase I - Building D · puneKumar Builders · P52100007160 · possession Oct 2020 · 90.9% built · 1 complaint
- Airiana · LOHGAONMitesh Lakhamshi Patel · P52100007161 · possession Dec 2019 · 25.9% built
- Anand Gold Coin · Baramati (M Cl)Anand Infra · P52100007171 · possession Jun 2019 · 74.5% built
- Sunshine Elite · WakadShahin M Yasin Hawaldar · P52100007173 · possession Dec 2017 · 81.8% built
- SHIROMANI HEIGHTS · HaveliSudarshan Construction · P52100007178 · possession Dec 2018 · 67.3% built · 1 complaint
- CROSSROADS · WakadSHREE RAVIRAJ PASHANKAR DEVELOPERS · P52100007186 · possession Mar 2018 · 56.2% built
- Mayur Samruddhi Phase - II D wing · HaveliBunty Properties Unit No. X · P52100007199 · possession Jul 2028 · 38% built
- VISION KALPAVRIKSHA PHASE 2 · Pimpri Chinchawad (M Corp.)VISION ENTERPRISES · P52100007200 · possession Sept 2018 · 90.9% built
- Teerth Technospace 15 · BanerTEERTH DEVELOPERS AND TEERTH REALTIES JV · P52100007204 · possession Dec 2019 · 90.9% built
- DHANALAXMI ANGAN · MawalM/S. K P DEVELOPERS & BUILDERS · P52100007205 · possession Dec 2017 · 63.8% built
- Whistling Meadows · BhugaonAxis Paradigm Infra Properties · P52100007209 · possession Feb 2018 · 100% built
- Mont Vert Yolo · BhugaonMont Vert Elegance · P52100007210 · possession Dec 2022 · 24.7% built
- ELITE DREAMS · HaveliAJINKYA DEVELOPERS · P52100007217 · possession Dec 2019 · 44.1% built
- COURTYARD · PASHANYOGESH & YOGESH DEVELOPERS · P52100007218 · possession Dec 2019 · 51.8% built
- SAI PLATINA · Pimpri Chinchawad (M Corp.)SHREE SAI ESTATES · P52100007233 · possession Jun 2018 · 90.9% built
- SHANTAI HERITAGE · HaveliVINOD TUKARAM ADASKAR · P52100007237 · possession Mar 2018 · 90.9% built
- ORION · HaveliSUDARSHAN DEVELOPERS · P52100007244 · possession Dec 2019 · 42.4% built
- Platinum Park Phase I · UNDRIRanjeet Property Developers India Pvt. Ltd. · P52100007249 · possession Dec 2019 · 98.5% built · 5 complaints
- AAROH DWELLING · Pune (M Corp.)SHANKAR VITHAL BELDARE AND OTHERS · P52100007251 · possession Oct 2022 · 100% built
- Tiara · WakadSHETH AND POPAT ENTERPRISE · P52100007260 · possession Dec 2019 · 26.8% built · 1 complaint
- Mahakaleshwar Paradise Building B · HaveliChandrakant Deepaji Khamitkar · P52100007261 · possession Jun 2027 · 47.7% built
- PRIVIA 9 · MOSHIPRIVIA BUILDERS LLP · P52100007271 · possession Dec 2021 · 90.9% built
- JUBILATION · WAGHOLIAAKANKSSHA ASSOCIEATES · P52100007279 · possession Mar 2018 · 90.9% built
- WISTERIA C BUILDING PHASE 1 · chikhali BkMR DILIP KANAIYALAL TILWANI · P52100007292 · possession May 2019 · 90.9% built
- Sukhwani Gracia Phase-2 B Wing · Sus PunePrime properties · P52100007297 · possession Apr 2019 · 90.9% built
- REGENT HEIGHTS · Pune (M Corp.)BHAVANI CONSTRUCTION CO. · P52100007313 · possession Dec 2017 · 100% built · 1 complaint
- 15 PREMLOK · Pimpri Chinchawad (M Corp.)HANSRAJ ORANGE DEVELOPERS · P52100007314 · possession Dec 2019 · 90% built
- 18 Latiiude · BanerG D Square Developers · P52100007318 · possession Jul 2018 · 81.8% built
- SAMRUDDHI NABHANGAN · KivaleSAMRUDDHI REALITY · P52100007319 · possession Jul 2018 · 90.9% built
- ASTER · PisoliKALAPI VENTURES · P52100007322 · possession Dec 2017 · 45.5% built
- ONELLA-2 · SusNimhan Associates · P52100007329 · possession Dec 2018 · 56% built
- GIRNAR · Daund (M Cl)ABHAY CHANDRAMOHAN SAWANT · P52100007331 · possession Sept 2020 · 81.8% built
- The Legend · HinjawadiShree Sankalp Associates · P52100007333 · possession Oct 2021 · 18.2% built · 1 complaint
- Sai Krupa Residency Wing B · LOHGAONSai Krupa Ventures · P52100007343 · possession Dec 2019 · 90.9% built
- Ritika Residency · WakadWaghere Associates · P52100007344 · possession Dec 2025 · 100% built
- GOLDEN WINDS Building B Phase 3 · Pune CityGOLDEN BRICKS DEVELOPERS · P52100007347 · possession Dec 2019 · 86.4% built
- Golden Trellis A Building · BanerGolden Trellis Developments · P52100007351 · possession Dec 2018 · 77.7% built · 2 complaints
- VISION WOODS 1 PHASE II · JambhulSHUBBAN REALTORS · P52100007352 · possession Apr 2018 · 87.2% built
- PEARL SQUARE · HadapsarPearl Developers · P52100007357 · possession Dec 2021 · 90.9% built
- IMPERIAL COMMERCIAL SPACES · Pune CityMERIDIAN · P52100007362 · possession Dec 2020 · 66.4% built · 1 complaint
- VAASTU DREAMS · CHIKHALISai Essen Vaastu Developers LLP · P52100007364 · possession Oct 2020 · 64.8% built
- Vtp Beaumonde- Nation R2 Tower5 · ManjriAshdan Developers Private Limited · P52100007384 · possession Apr 2024 · 90.9% built · 32 complaints
- TOWN CENTRAL · NEAR CENTRAL BUILDINGVAIBHAV CONSTRUCTION · P52100007390 · possession Dec 2021 · 95.5% built · 2 complaints
- Lagoona Woods Phase 1 · LavhardeSudarshan Developers · P52100007392 · possession Jun 2028 · 10% built
- INDRAPRASTHA · GAT NO 698/2/3OMKAR DEVELOPERS · P52100007400 · possession Feb 2021 · 81.8% built
- DWARKA · Pune (M Corp.)CUBIX DEVELOPERS · P52100007405 · possession Dec 2018 · 79.1% built
- lavish · Pimpri Chinchawad (M Corp.)KALBHOR AND CHAVAN DEVELOPERS · P52100007409 · possession Aug 2018 · 81.8% built
- Signature Heights · WakadSamruddhi Properties · P52100007417 · possession Mar 2018 · 53.6% built
- Tara Jewel · HaveliTara Jewel · P52100007418 · possession Dec 2017 · 72.7% built
- Defence Colony Pune Phase2 · WAGHOLIDefence Colony Pune · P52100007420 · possession Sept 2018 · 96.4% built
- Rainbow · HaveliSG VENTURES · P52100007423 · possession Oct 2019 · 67.7% built
- Mahaveer Delight · Pune (M Corp.)Yashodhan Associates · P52100007439 · possession Dec 2017 · 84.5% built · 38 complaints
- kute sukhvastu · near PCMC schoolKailas Developers And Builders · P52100007440 · possession May 2018 · 81.8% built
- Marvel Bounty K Building · HaveliMARVEL SIGMA HOMES PRIVATE LIMITED · P52100007453 · possession Dec 2019 · 90.9% built
- NIRMAN SQUARE · PUNESUNGOLD DEVELOPERS · P52100007471 · possession Jun 2024 · 100% built
- Shuban Enclave · HaveliSahyadri Devcon · P52100007474 · possession Dec 2026 · 35.8% built
- VINAYAK15 · Rambaug ColonyBADHEKAR DEVELOPERS · P52100007478 · possession Nov 2021 · 81.8% built
- Sai Tirupati Greens Phase 3 · WadmukhwadiSai Tirupati Properties · P52100007487 · possession Dec 2020 · 90.9% built · 1 complaint
- AUSTIN PARK A BUILDING · TathwadeYASHADA SHRAVNI GROUP · P52100007500 · possession Dec 2020 · 90.9% built
- AKSHAY VILLA · AMBEGAON BkAKSHAY INFRASTRUCTURE PVT LTD · P52100007501 · possession Jun 2022 · 72.7% built
- Life Republic Sector R3 - 3rd Avenue · JambeKOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED · P52100007511 · possession Dec 2019 · 90.9% built · 5 complaints
- Majestic Pearl · BanerVikas Narayan Virkar · P52100007513 · possession May 2022 · 36.4% built
- Shraddha Orchid · Pimpri Chinchawad (M Corp.)D.A.BORADE AND SONS · P52100007519 · possession Aug 2018 · 90.9% built
- ANANDTARA WHITEFIELD RESIDENCES PHASE - I · LONKAR VASTIANANDTARA INFRASTRUCTURE · P52100007529 · possession Dec 2020 · 85.4% built
- Three Jewels -Shops · KondhwaSnowflower Properties Private Limited · P52100007533 · possession Mar 2018 · 72.7% built
- Silverstone Lonaville · MawalSilverstone Homemakers Pvt. Ltd · P52100007543 · possession Dec 2027 · 40.9% built · 12 complaints
- KOHINOOR BLISSPARK · CHAKANKOHINOOR PROPERTIES · P52100007557 · possession Dec 2018 · 53.2% built · 1 complaint
- AURA VILLE · Pune Citysai developers · P52100007565 · possession Sept 2018 · 38.9% built
- Purva Silversand · KeshavnagarPune Projects LLP · P52100007566 · possession Nov 2023 · 100% built · 128 complaints
- BLOSSOM · WAGHOLING RATHI ASSOCIATES · P52100007572 · possession Dec 2020 · 51.8% built · 4 complaints
- SHIV ZEN WORLD - PHASE I · MANJARI BkShubh Housing · P52100007579 · possession Dec 2021 · 54.5% built
- SHREE ELIGANCE · CHIKHALIABHILASHADEVELOPER · P52100007582 · possession Sept 2020 · 62.3% built
- RUDRA DHAM Phase 1 · LingaliRudra Construction & Developers · P52100007588 · possession Jan 2021 · 30.9% built
- Seetai Villa · ManRaju Baburao Jori · P52100007605 · possession Aug 2019 · 99.1% built · 1 complaint
- TROODOS HEIGHTS · ShewalewadiSHIVGANGA DEVELOPERS · P52100007606 · possession Dec 2021 · 81.8% built
- Teerth Technospace 14 · BanerTEERTH DEVELOPERS AND TEERTH REALTIES JV · P52100007620 · possession Dec 2019 · 90.9% built
- VIVAAN · MahalungePADALE CONSTRUCTIONS PVT LTD · P52100007627 · possession Jun 2019 · 18.9% built
- ONKAR HEIGHTS BUILDING C · KaranjepulOMKAR BUILDERS AND DEVELOPERS · P52100007628 · possession Jun 2029 · 89.1% built
- VAASTU IMPERIAL Wing B · HaveliM/S Twin Star Infrastructure · P52100007631 · possession Jun 2026 · 87.3% built · 46 complaints
- Vedant Heights · IN FRONT MARKET YARDUmesh Shashikant Nanaware · P52100007632 · possession Jan 2021 · 81.8% built
- SWASTIK MUHURTAM · MahalungeSWASTIKCONSTRUCTION · P52100007639 · possession Dec 2017 · 90.9% built
- Sai Shawas · HaveliVilas Tukaram Wadghule · P52100007646 · possession Dec 2026 · 84.8% built · 2 complaints
- SWARAJ · PatasRAMAN BABASO KHAMKAR · P52100007657 · possession Jan 2018 · 78.2% built
- VIVA SAROVAR PHASE 1 · Pune (M Corp.)M/S. VIVA SWASTIK ASSOCIATES · P52100007659 · possession Sept 2018 · 99.8% built
- MADHUBAN · Pimpri Chinchawad (M Corp.)PASS DEVELOPERS · P52100007662 · possession Dec 2026 · 93.3% built
- WHISTLING WINDS · Near Balaji HotelNarendra Shantilal Bhandari · P52100007671 · possession Jun 2022 · 55.5% built
- The Address - 1 · MOSHISOL Developers · P52100007674 · possession Jun 2019 · 90.9% built
- SWATISH · KothrudAna Developers · P52100007676 · possession Oct 2019 · 54.5% built
- Grande Ventila Phase 1 Wing B · WagholiSATAVDEVELOPERSANDBUILDERS · P52100007686 · possession Mar 2019 · 90.9% built
- SIDHIVINAYAK RESIDENCY · Pimpri Chinchawad (M Corp.)SWARAJ CONSTRUCTION · P52100007687 · possession Oct 2023 · 52.7% built
- Ozarde Residency · Baramati (M Cl)Onkar Developers · P52100007697 · possession Dec 2018 · 80% built
- Nilaya Wing A · Pune (M Corp.)Good Earth Shelters · P52100007699 · possession Dec 2019 · 91.9% built
- Swarnavilas Phase 2 · PASHANSachin vitthal Nimhan · P52100007700 · possession Mar 2024 · 100% built
- BLUE SAPPHIRE · SomataneBLUEBERRY DEVELOPERS · P52100007703 · possession Mar 2018 · 90.9% built
- GLOBAL HEIGHTS · CHARHOLIMD CREATION · P52100007709 · possession Jun 2022 · 90.9% built
- Vtp Cygnus- Nation R1-Tower 8 · ManjriAshdan Developers Private Limited · P52100007722 · possession Jul 2024 · 90.9% built · 23 complaints
- Salvia · BhosariGurudevelopers · P52100007723 · possession Dec 2018 · 90.9% built
- VENKATESH MARKET -PHASE - II · HaveliSHIV ASSOCIATES · P52100007728 · possession Dec 2038 · 59.5% built
- AVANI NILAY · ShirurABG CITY · P52100007735 · possession Sept 2018 · 90.9% built
- Suyog Navkaar Phase I · Pune CitySuyog Development Corporation Unit 12 LLP · P52100007756 · possession Dec 2026 · 81.8% built · 1 complaint
- FUSION CITY · HaveliKUMBARE ENTERPRISES · P52100007763 · possession Sept 2018 · 90.9% built
- Golden Trellis D Building · BanerGolden Trellis Developments · P52100007767 · possession Dec 2018 · 79.5% built
- Princetown Royal - B4 · UndriManikchand Kumar Properties · P52100007776 · possession Jun 2022 · 100% built
- SHREE CHINTAMANI APARTMENTS · PashanNISHIKANT SHARAD CHAUDHARI · P52100007779 · possession Sept 2022 · 53.9% built
- LOTUS - PHASE 1 B WING · SusRAVIKARAN CONSTRUCTION · P52100007781 · possession Dec 2021 · 69.1% built
- SHUBHARAMBHA RESIDENCY · Talegaon Dabhade (M Cl)SANDEEP CHANDRAKANT KAKADE · P52100007790 · possession Sept 2019 · 52.7% built
- MANTRI ETERNITY PLUS · HaveliOMEGA PREMISES PVT LTD · P52100007791 · possession Feb 2020 · 54.5% built · 2 complaints
- KAMAL GLORY · KONDHWA BKKAMAL REALTY · P52100007792 · possession Mar 2023 · 37.3% built
- ASTRIA RESIDENCY · WakadANIL BALKRUSHNA KATE · P52100007808 · possession Dec 2018 · 63.6% built
- Vertical Alcinia Phase I · MohammadwadiHasthshilp Reality · P52100007827 · possession Dec 2020 · 100% built · 2 complaints
- RAJESH EAST ENIGMA · HaveliRAJESH DEVELOPERS · P52100007846 · possession Dec 2018 · 81.8% built
- KALPVRUKSH · Pimpri Chinchawad (M Corp.)KALPVRUKSH DEVELOPERS · P52100007850 · possession Dec 2017 · 81.8% built
- SHANTAI HEIGHTS · Pimpri Chinchawad (M Corp.)VINOD TUKARAM ADASKAR · P52100007855 · possession Mar 2018 · 90.9% built
- Nakshatra · KothrudKrishnaraj Developers · P52100007857 · possession Dec 2023 · 55.9% built
- Jay Ganesh Apartment · CHARHOLIHemant Arun Upare · P52100007865 · possession Jan 2019 · 90.9% built
- CHANDRALOK NAGARI · Dhayari (Part)YASHASHREE ASSOCAITES · P52100007877 · possession Jun 2018 · 82.7% built
- SAI SANSKRUTI · yevalewadiSAI RACHANA LIFE SPACES · P52100007881 · possession Jun 2022 · 81.8% built
- The Address - 2 · MOSHISOL Developers · P52100007886 · possession Jun 2022 · 82.8% built
- SHREE SADGURU KRUPA · KatrajMAA PRANAAM VENTURE · P52100007899 · possession Dec 2021 · 60.9% built
- KAKADE PARK · ChinchwadSuryakant Kakade · P52100007904 · possession Dec 2018 · 90.9% built
- Sopan Residency · HaveliMauli Enterprises · P52100007906 · possession Jun 2019 · 72.7% built
- Atharva Heights · INFRONT MARKET YARDAtharva Developers · P52100007912 · possession Jul 2023 · 73.1% built
- KAKADE PLAZA PHASE 2 JVA MALL · HaveliSuryakant Kakade · P52100007918 · possession Jun 2022 · 87.3% built
- DESTINATION OSTIA BLDG A · BhosariD R GAVHANE LANDMARKS LLP · P52100007927 · possession Sept 2020 · 80.9% built
- Engracia B C E F · HaveliM/s Pacific Orient Genesis Associates · P52100007941 · possession Dec 2026 · 75.5% built · 37 complaints
- VTP Alpine · mhalungeNNP BUILDCON PVT. LTD · P52100007943 · possession Jun 2023 · 79.8% built · 2 complaints
- Windsor County Phase -3 · Taware ColonyWindsor Shelters · P52100007955 · possession Apr 2022 · 100% built
- Gandharva Excellence Project II · Near Modern Collage of PharmacyVinayak Pandharinath Bhongale · P52100007967 · possession Sept 2019 · 67.1% built · 1 complaint
- Akshay Classic · PimplesaudagarAkshay Skyscrapers LLP · P52100007968 · possession Jun 2019 · 86.4% built
- SHREE NIDHI PHASE -1 · LOHGAONSHREE INFRACON · P52100007979 · possession Aug 2019 · 90.9% built
- Sukhwani Gracia Phase-3 C, Wing · MulshiPrime properties · P52100007982 · possession Dec 2027 · 90.9% built · 4 complaints
- SKY POINT PHASE I B AND C WING · MundhawaShubh Enterprises · P52100007993 · possession Feb 2018 · 86.4% built
- HARMONY · ShirurNANDAKUMAR LAPALIKAR · P52100007996 · possession Dec 2026 · 16.4% built · 1 complaint
- DURVA RESIDENCE · ThergaonPRADEEP MANIK BHISE · P52100008001 · possession Dec 2019 · 9.1% built
- SAAKAAR CENTRUM · HaveliSAAKAAR CENTRUM · P52100008006 · possession Dec 2026 · 34.5% built · 3 complaints
- TRIDENT BUSINESS CENTER · HaveliSHIRISH BHASKAR JADHAV · P52100008007 · possession Jun 2023 · 81.8% built
- Shubham Siddhi · Wadagaon (CT)Shubham Realtors · P52100008013 · possession Dec 2017 · 81.8% built
- SPACE ELENA · BavdhanSPACE VENTURES · P52100008019 · possession Sept 2020 · 45.5% built
- Nirmiti 7 Hills · Baramati (M Cl)Nirmiti Properties · P52100008020 · possession Dec 2022 · 40.9% built
- ZINNIA ELEGANS · WakadVINODE WAKADKAR ASSOCIATES · P52100008023 · possession Dec 2020 · 45.5% built
- VALENCIA · MulshiBMC GROUP · P52100008024 · possession Dec 2021 · 81.8% built
- Aapla Ghar Lonikand · HaveliMIA Properties · P52100008033 · possession Dec 2021 · 87.9% built · 4 complaints
- Vizion Galaxy B · JunnarVIZION CONSTRUCTION · P52100008039 · possession Dec 2017 · 90.9% built
- PARADISE HOMES · MAWANPARADISE MAKER · P52100008042 · possession Dec 2021 · 90.9% built
- SAI SADAN RESIDENCY 1 · Baramati (M Cl)SACHIN GANPATRAO TAWARE · P52100008043 · possession Jun 2019 · 90.9% built
- SAMARTH HEIGHTS · Pimpri Chinchawad (M Corp.)SHREE SWAMI SAMARTH DEVELOPERS · P52100008045 · possession Jun 2018 · 59.1% built
- YASH TWIN TOWER · BanerYASH INFRA CITY REALTY PRIVATE LIMITED · P52100008049 · possession Dec 2020 · 71% built · 14 complaints
- SWASTIK MANAS · MahalungeSWASTIK INFRA · P52100008050 · possession Oct 2020 · 27.3% built · 1 complaint
- woodcrest · HaveliFlora builders & developers · P52100008054 · possession Dec 2017 · 90.9% built
- WATER EDGE · PUNERAYKAR MARATHE DEVELOPERS · P52100008074 · possession Jul 2019 · 11.8% built
- Shivangan · WakadJK2 Associates · P52100008075 · possession Mar 2019 · 71.4% built
- PANACHE · Pune CitySHREE MAHALAXMI DEVELOPERS · P52100008087 · possession Dec 2018 · 70.9% built
- SAI VRINDAVAN · HaveliMARUTI SAYABANNA Mehetre · P52100008093 · possession Dec 2018 · 89.1% built
- Alpha Imperio · Pune (CB)HRUDEV REALTY PROJECTS LLP · P52100008118 · possession Dec 2021 · 100% built · 1 complaint
- SHASHITARA HILLS · HaveliSHRIKANT SHASHIKANT JAGTAP · P52100008119 · possession Sept 2022 · 51.8% built
- Aapla Ghar Chakan Phase II Amenity Bldg A · Nanekarwadi (CT)Maple Estates · P52100008123 · possession Dec 2022 · 18.2% built
- OM PARADISE A WING · kiwaleS K BUILDCON · P52100008127 · possession May 2022 · 100% built
- Mid Town · Pimpri Chinchawad (M Corp.)Avirat Ventures · P52100008137 · possession Dec 2017 · 90.9% built
- Pratham Residency · Talegaon Dabhade (M Cl)Pratham realtors · P52100008144 · possession Dec 2019 · 90.9% built
- SWARANAND · HaveliIMG DEVELOPERS · P52100008149 · possession Dec 2028 · 26.4% built
- TRADEMARK LIFE · MulshiNEW FRONT PRABHAVEE VENTURES · P52100008152 · possession Dec 2018 · 90% built
- SONCHAFA · HaveliVastushilp · P52100008160 · possession Dec 2027 · 43.4% built
- NAVKAR DARSHAN · Pimpri Chinchawad (M Corp.)ABHAY POPATLAL DHOKA · P52100008176 · possession Oct 2018 · 53.6% built
- VARDHAMAN PARK · VaraleCHRISHH OMKARA CONSTRUCTIONS · P52100008190 · possession Dec 2017 · 90.9% built
- KOOL HOMES SOLITAIRE · HaveliREPTON PROPERTIES PRIVATE LIMITED · P52100008192 · possession Dec 2030 · 43.6% built
- AKSHAR · Talegaon Dabhade (M Cl)AKSHAR ASSOCIATES · P52100008202 · possession Aug 2018 · 90.9% built
- Tinsel County Phase II · HINJEWADIGrow India Realcon LLP · P52100008206 · possession Feb 2021 · 80.8% built
- PLENUM PARK PART 2 · Keshavnagar-MundwaP & M DEVELOPERS · P52100008219 · possession Sept 2018 · 72.7% built
- SHIKHAR · ManSAKSHAM HOUSING DEVELOPMENT LLP · P52100008221 · possession Jun 2024 · 100% built · 1 complaint
- KOYANA CONDOMINIUM · KothrudK J REALTORS · P52100008222 · possession Feb 2018 · 69% built
- Amrutvel Greens Phase I · HaveliErande Bhave Associates · P52100008225 · possession May 2018 · 68.1% built · 2 complaints
- ASHUTOSH RESIDENCY · MulshiASHUTOSH ASSOCIATES · P52100008229 · possession Mar 2019 · 81.8% built · 3 complaints
- SHUBHSHIVAM RESIDENCY · Manchar (CT)M/S ADHIRAJ ASSOCIATS · P52100008241 · possession Dec 2019 · 100% built
- SANTKRUPA COMPLEX · LOHGAONOSHIN REALTY PRIVATE LIMITED · P52100008263 · possession Dec 2018 · 100% built
- ABHILASHA · ShirurKUDALE SABLE BUILDERS · P52100008268 · possession May 2022 · 80% built
- NEEDAM - BLOCK A - WING B · HaveliRAUT PATIL CONSTRUCTIONS · P52100008271 · possession Dec 2027 · 64.1% built
- SAMARTH RESIDENCY · HaveliM M DEVLOPERS · P52100008277 · possession Dec 2017 · 73.1% built
- Blue Bell · BanerAbhaysinh Dhadve Patil Constructions Private Limited · P52100008278 · possession Jun 2019 · 88.2% built · 9 complaints
- Pragati Greenwoods · WaksaiPragati Construction · P52100008279 · possession Jan 2018 · 89.1% built
- PRIMEROSE · AMBEGAONGURUKRUPA DEVELOPERS · P52100008282 · possession Nov 2018 · 90.9% built · 1 complaint
- SAYALI COMPLEX · DEHUPANDIT NANABHAU MOLAK · P52100008283 · possession Nov 2019 · 72.3% built
- VISHAKHA REGENCCY · WADGAON BKVISHAKHA DEVELOPER · P52100008301 · possession Dec 2020 · 81.8% built
- KAMALSANDHYA · ShirurSANTOSH BABAN MORE · P52100008308 · possession Jul 2019 · 40% built
- LAXMI BHAKTI · RAHATNIL S MEHETRE & SUKHWANI SHELTERS · P52100008310 · possession Mar 2019 · 86.4% built
- SHREERAM LOTUS · LOHGAONR G Developers · P52100008339 · possession Dec 2018 · 18.2% built
- Prakash Greens · SomatanePrakash Ventures · P52100008347 · possession Oct 2018 · 100% built
- GREEN EMPIRE B WING · Pimpri Chinchawad (M Corp.)GANRAJ ASSOCIATES · P52100008349 · possession Jun 2018 · 58.2% built
- SILVER PALM GROVE PHASE 2 · RAVETSILVER STAR GROUP · P52100008351 · possession Dec 2019 · 100% built · 2 complaints
- Pinnacle 9 Sadashiv A - Building · Pune CityPinnacle Neostar Corporation Pvt. Ltd. · P52100008353 · possession Dec 2026 · 25.5% built
- FINSWELL · LOHGAONLMS REALTY · P52100008359 · possession Jul 2022 · 80.5% built · 3 complaints
- GREEN PARK PHASE 3 · RuiRAJENDRA VASANTRAO INGOLE · P52100008361 · possession Jun 2019 · 81.8% built
- Shubharambh · Dehu Road (CB)NIRMAN RESIDENCY · P52100008363 · possession Feb 2018 · 63.6% built
- RAINBOW GRACE · WAGHOLIRAINBOW REALTY · P52100008364 · possession Mar 2023 · 90.9% built
- SUKOOL · Talegaon Dabhade (M Cl)SHREE SIDDHIVINAYAK CONSTRUCTION · P52100008373 · possession May 2018 · 64.5% built
- NANDANVAN · HaveliPENTAGON PROPERTIES · P52100008374 · possession Jun 2024 · 95.5% built
- Jinkushal Residency · HaveliM/s Prakash Spaces · P52100008396 · possession Oct 2018 · 75% built
- The Palms · Pune (M Corp.)Ketsun Enterprises · P52100008404 · possession May 2022 · 72.6% built
- JAIHIND RESIDENCY · Pimpri Chinchawad (M Corp.)MADISON HOLDINGS · P52100008409 · possession Dec 2021 · 100% built
- Aaradhyam · Pimpri Chinchawad (M Corp.)DHANESHWAR VISION DEVELOPERS · P52100008419 · possession Dec 2019 · 86.4% built
- SPIREA · WakadVINODE BUILDCON · P52100008423 · possession Dec 2018 · 100% built
- SAVALI HOMES - E BUILDING · Pune (M Corp.)SAPTSIDDHI ASSOCIATES · P52100008425 · possession Aug 2019 · 90.9% built
- Pratham · ShirurPrimary Housing Corporation LLP · P52100008426 · possession Dec 2018 · 89.1% built
- 7 Gulmohar · Pune CityCrystalstar Landscapes LLP · P52100008432 · possession Sept 2018 · 90.9% built
- SIDDHA SAI · CHARHOLIDATTAKRUPA ASSOCIATES · P52100008434 · possession Jul 2018 · 72.5% built
- CELEBRATION COUNTY · VaralePRISM TULIP VENTURES · P52100008435 · possession Jul 2018 · 100% built
- BASERA ETERNITY · Rajiv Gandhi Infotech ParkSANJEEVKUMAR RAMESHCHANDRA AGARWAL · P52100008447 · possession Jun 2022 · 81.8% built · 1 complaint
- Beverly Hills - Building F · HinjewadiSheth Developers · P52100008510 · possession Mar 2021 · 38.2% built · 1 complaint
- PUSHKARDEEP · HaveliCHINTAMANI AND PANCHATATVA ASSOCIATES (J.V.) · P52100008511 · possession Mar 2019 · 100% built
- ATHARVA PLAZA · Pune (M Corp.)D G ASSOCIATES · P52100008518 · possession Mar 2018 · 81.8% built
- Lantana Court · MOHOMMADWADILandmark Ventures · P52100008527 · possession Aug 2019 · 100% built
- Konark Tower · BanerKonark Developers · P52100008532 · possession Mar 2019 · 63.6% built
- SHRI SAMARTH · Pimpri Chinchawad (M Corp.)KHINVASARA ASSOCIATES SHREE SAMARTH · P52100008537 · possession Dec 2018 · 40% built
- VRUNDAVAN · charholi khSHRI LAXMI BALAJI DEVELOPERS · P52100008543 · possession Dec 2018 · 90.9% built
- SHREE NAVNATH APARTMENT · Wadagaon (CT)RAGHU BAPUJI KUDE · P52100008550 · possession Sept 2018 · 90.9% built
- Tara Ashirvaad · WAGHOLIShivtara Properties Private Limited · P52100008560 · possession Dec 2017 · 72.7% built
- Vighnaharta Residency · Baramati (M Cl)Vikas Bhimdev Kale · P52100008577 · possession Dec 2018 · 62% built
- GOVIND VILAS · Pune CityM/S SWAMI OM PROPERTIES · P52100008590 · possession Dec 2017 · 90.9% built
- RAMNAGAR HOUSING COMPLEX PHASE L · HaveliVAASTU UDYOG · P52100008598 · possession Dec 2026 · 89.2% built
- SKYSCRAPER PHASE 1 · TathwadeVISHAL PROPERTIES · P52100008605 · possession Jul 2023 · 90.9% built · 1 complaint
- Aarohi S · SusTeirth Developers and Suyojit Infrastructure Ltd · P52100008608 · possession Mar 2019 · 81.8% built
- CHRISHH FORTUNE · Talegaon Dabhade (M Cl)CHRISHH HOLDINGS · P52100008612 · possession Mar 2021 · 77.3% built
- MSR OLIVE · AmbegaonMind Space Realty Pvt. Ltd. · P52100008615 · possession Mar 2025 · 59.5% built
- CHRISHH VASANT · TALEGAON DABHADECHRISHH HOLDINGS · P52100008617 · possession Dec 2018 · 90.9% built
- DESTINATION ANKUR C BUILDING · CHOVISAWADIKIRTI LANDMARKS · P52100008620 · possession Nov 2020 · 31.3% built
- URJA RESIDENCY · Pune (M Corp.)ANITA BHAUSAHEB KAD · P52100008634 · possession Mar 2018 · 88.2% built · 1 complaint
- Jedhe Heritage II · BoripardhiAtharava Developers · P52100008643 · possession Jun 2018 · 100% built
- IMPACT IMPERIAL · LOHGAONIMPACT DEVELOPERS · P52100008652 · possession Jul 2018 · 76.4% built · 1 complaint
- Tarangana Nakshatra · HadapsarTarangana Nakshatra · P52100008669 · possession Dec 2018 · 49.3% built
- Twin Tower · Bhumkar VastiRoyal Unicorn · P52100008672 · possession Jun 2019 · 90.9% built
- KOHINOOR BEGONIA PHASE III · varale phataKOHINOOR ASSOCIATES · P52100008679 · possession Dec 2021 · 90.9% built · 1 complaint
- PLATINUM PALLAZO · ChichwadPLATINUM SQUARE · P52100008686 · possession Mar 2022 · 81.8% built · 1 complaint
- 45 NIRVAANA HILL - C2 WING · Pune CitySINEW DEVELOPERS PRIVATE LIMITED · P52100008687 · possession Jun 2027 · 54.9% built · 29 complaints
- Dattakala Park · GopalwadiDipali Ramdas Jadhav · P52100008688 · possession Jul 2018 · 72.7% built
- JAY GANESH CONSTRUCTIONS · BanerJAY GANESH CONSTRUCTION · P52100008689 · possession Dec 2017 · 81.8% built
- SAPPHIRE · Pimpri Chinchawad (M Corp.)Sai Nisarg Developers LLP · P52100008695 · possession Mar 2022 · 74.5% built
- BHUVI · WakadM/s Vitthal Properties · P52100008707 · possession Dec 2017 · 81.8% built
- MARVEL ARCO B BUILDING · HadapsarMARVEL SIGMA HOMES PRIVATE LIMITED · P52100008708 · possession Dec 2018 · 75.9% built · 4 complaints
- MONTECITO PHASE I - D BUILDING PART 2 · ParvatiAmit Vastu Ventures LLP · P52100008717 · possession Dec 2018 · 86.9% built · 16 complaints
- Shinde Darade Complex · JalochiSHINDE DARADE ASSOCIATES · P52100008723 · possession Nov 2019 · 32.3% built
- SHUBHAM RESIDENCY · WAGHOLIBHARAT SHRIKANT TIBREWALA · P52100008724 · possession Dec 2017 · 81.8% built
- BLOSSOM GARDEN · HaveliM S ASSOCIATES · P52100008745 · possession May 2026 · 12.7% built · 1 complaint
- Aapla Ghar Ambegaon Annex Phase I · BhorMaple Buildcon · P52100008761 · possession Dec 2029 · 37.1% built · 18 complaints
- DODKE SHOBHAN · HaveliDODKE REALTORS · P52100008770 · possession Dec 2018 · 53% built
- SHUBHARAMBH RESIDENCY · ManAB DEVELOPER · P52100008772 · possession Mar 2018 · 29.1% built
- The Address · HaveliDreams Landscape Construction · P52100008774 · possession Dec 2026 · 83.2% built
- 18 Latitude Commercial · PunawaleG D Square Developer · P52100008782 · possession Dec 2023 · 81.8% built
- Sonigara Excluzee · Hinjavadi (CT)DHANRAJ KESARIMAL SONIGARA · P52100008799 · possession Dec 2020 · 93% built
- SAMRUDDHI · NARHEKUNDA RAMACHANDRA CHINCHANIKAR · P52100008819 · possession Mar 2018 · 100% built
- KPCT · Pune CityPARMAR PROPERTIES PVT.LTD. · P52100008820 · possession Sept 2026 · 90.9% built
- Dorabjees Royale Heritage Mall · MOHAMMEDWADIJehangir Nariman Dorabjee · P52100008824 · possession Oct 2018 · 81.8% built
- Swara Sparsh · WakadM/S Chinchwade Avhale Associates · P52100008838 · possession Dec 2019 · 42.3% built
- Shivalay · MANJARI BkKedar Developers · P52100008842 · possession Apr 2022 · 56.4% built
- AMBAR DARSHAN · HaveliSHIVSHAKTI BUILDERS & DEVELOPERS · P52100008843 · possession Dec 2017 · 86.4% built
- ADITYA PARADISE · PunawaleMore Shinde Associates · P52100008846 · possession Dec 2017 · 72.7% built
- PRADNYESH RESIDENCY · ZAGADE WASTIM\S PRADNYESH BUILDERS AND DEVELOPERS · P52100008874 · possession Dec 2022 · 81.8% built
- 25 GLORY · HaveliVIJAYRAJ ASSOCIATES · P52100008877 · possession Dec 2018 · 80% built
- BLISS · Pune (M Corp.)GAURAV ASSOCIATES · P52100008905 · possession Dec 2018 · 72.7% built
- KJ TOWER · HaveliKALYAN JAGANNATH JADHAV · P52100008908 · possession Jun 2026 · 96.5% built · 1 complaint
- DAFFODILS AVENUE PHASE 4 · SomatanePENTAGON SHREEMANGAL VISHHRAM VENTURES · P52100008913 · possession Mar 2018 · 89.5% built · 1 complaint
- Spring Residency · HaveliPritam Ashok Kachi · P52100008915 · possession Sept 2026 · 90.9% built · 2 complaints
- Sarovar Residency · Talegaon Dabhade (M Cl)Chandrakant Shankar Bhide · P52100008917 · possession May 2019 · 82.7% built
- CHRISHH SPRINGS · NEAR SAHYADRI SCHOOLCHRISHH HOLDINGS · P52100008928 · possession Sept 2019 · 72.7% built
- TULSI SHAKUNTALA KANADE NAGAR · KANADE NAGARM/s. TULSI DEVELOPERS · P52100008932 · possession Apr 2019 · 68.6% built · 1 complaint
- SHEVANTA ENCLAVES · HaveliP.S.PROMOTERS AND DEVELOPERS · P52100008941 · possession Dec 2018 · 84.1% built
- Mantra Moments Phase 5 · MoshiMANTRA PROPERTIES · P52100008951 · possession Dec 2022 · 100% built · 1 complaint
- K K SUNDARBAN BUILDING A1 · GirimK K DEVELOPERS · P52100008965 · possession Jun 2019 · 42.7% built
- Galaxy Orchid · Pune CityGalaxy Constructions · P52100008975 · possession Dec 2019 · 10.8% built
- SWARA SRUSHTI · Pimpri Chinchawad (M Corp.)ekvira developers · P52100008976 · possession Dec 2017 · 90.9% built
- LALI RESIDENCY · GULTEKADI PUNEARCHANA DEVELOPERS · P52100008977 · possession Jun 2019 · 81.8% built
- premia B-1 Phase II · NARHEC.D. Developers · P52100008990 · possession Oct 2018 · 43.6% built
- PUSHKARAJ · KothrudINOVIIC DEVELOPER · P52100008994 · possession Dec 2017 · 90.9% built · 1 complaint
- CHRISHH ARCH · MAVALARCH SPACES · P52100008996 · possession Dec 2018 · 90.9% built
- AVAANTI RESIDENCES AND PREMIUM COMMERCIAL SPACES · HaveliOLYMPIA · P52100009000 · possession Jan 2024 · 89.3% built
- HAKIMI BAUG II · Pune (M Corp.)PYRAMID INFRASTRUCTURE · P52100009002 · possession Jan 2019 · 81.8% built
- BLUE BELLS AURA · PASHANRainbow Construction · P52100009029 · possession Mar 2019 · 90.9% built
- Princetown Tower - C3 · UndriManikchand Kumar Properties · P52100009077 · possession Jul 2023 · 90.9% built
- VIMAL KASTURI · HaveliAISHWARYA VIMAL BUILDERS · P52100009078 · possession Jun 2019 · 90.9% built
- Devcon Developer Onella Landscape · HaveliUnknown · P52100009089 · possession Dec 2028 · 89.4% built · 1 complaint
- MAYUR SAMRUDDHI PHASE- II · HaveliBUNTY PROPERTIES UNIT NO X · P52100009105 · possession Dec 2018 · 100% built
- SUBHASHREE RESIDENTIAL PHASE III · HaveliSIDDHIVINAYAK KOHINOOR LOTUS ASSOCIATES · P52100009116 · possession Jan 2021 · 100% built
- GANDHARV GALAXIA · HADAPSARGANDHARV REALTY · P52100009123 · possession Dec 2024 · 90.9% built
- Disha Heights · DaundDinesh Prabhakar Baravkar · P52100009125 · possession Dec 2018 · 84.1% built
- CHRISHH HARMONY · Talegaon Dabhade (M Cl)CHRISHH HOLDINGS · P52100009128 · possession Sept 2019 · 61.4% built
- Arihant Avenue · HaveliDharmesh Vasantrai Shah · P52100009141 · possession Dec 2017 · 81.4% built
- PESHWAI ARCADE · Pune (M Corp.)D Y DEVELOPERS · P52100009155 · possession Dec 2017 · 90.9% built
- Elite Abodeh · LOHGAONGanesh Dashrath Dale · P52100009181 · possession Dec 2019 · 97.3% built
- SHREE SWAMI ANANT SHRUSHTI · kirkatwadiSHIVSAI PROPERTIES LLP · P52100009187 · possession Jun 2022 · 81.8% built
- Vision Vatika · VitthalwadiVision Developers · P52100009188 · possession Dec 2021 · 63.6% built
- LALAT · MawalThe Developers · P52100009192 · possession Dec 2027 · 70.9% built
- Ashwamedh Admira · BanerASHWAMEDH SPACES PRIVATE LIMITED · P52100009195 · possession Dec 2017 · 90.5% built
- SKY POINT-PHASE I-A WING · KESHAVNAGARShubh Enterprises · P52100009213 · possession Dec 2021 · 69.1% built
- IHITA C AND D BUILDING · Bavadhan BKNayana Anand Kaswa · P52100009220 · possession Dec 2025 · 90.9% built
- VENUS HEIGHTS · Pune (M Corp.)VENUS CONSTRUCTION · P52100009223 · possession Dec 2017 · 81.8% built
- 24 SILVER SPRING · Talegaon Dabhade (M Cl)MARUTI BUILDCON · P52100009224 · possession Jun 2023 · 27.3% built
- LITTLE HEARTS PHASE 2 · UNDRISHREEMANGAL VISHHRAM DEVELOPERS · P52100009230 · possession Dec 2019 · 90.9% built
- Jitendra Heritage - E 2 Building - Phase - 1 · HaveliJitendra Constructions · P52100009234 · possession Dec 2030 · 41.5% built
- Solitaire Nine · BANERAtul Builders · P52100009238 · possession Nov 2020 · 72.7% built
- SAIDATT RESIDENCY · BanerSAIDATT ASSOCIATES · P52100009242 · possession Jul 2018 · 60.6% built
- CHINTAMANI COMPLEX · Baramati (M Cl)CHINTAMANI ASSOCIATES · P52100009269 · possession Dec 2018 · 90.9% built
- RAJVEER IMPERIA · Nehru NagarWaghere Associates · P52100009270 · possession Nov 2026 · 78.1% built
- PRIVIA SQUARE · MOSHIELLORA ASIAN REALTY PRIVATE LIMITED · P52100009271 · possession Feb 2020 · 81.8% built · 1 complaint
- Leisure · Pune (M Corp.)Pratibha Bhagwanrao Bhargude · P52100009290 · possession Dec 2017 · 100% built
- AUSTIN PARK D BUILDING · TathwadeDIVYA SHRAVANI DEVELOPERS · P52100009291 · possession Dec 2020 · 90.9% built
- GANRAYA PLAZA · AmbegaonVASANT VISHNU BANKHELE WITH ATUL BALIRAM THORAT ASSOCIATION OF PERSONS · P52100009301 · possession Dec 2018 · 64.5% built
- Riddhish Residency · BanerDamle Gandhe LLP · P52100009314 · possession Mar 2018 · 41.2% built
- SAI DWARKA PHASE 1 · YAWALEWADIMAA SANKALP BUILDCON · P52100009316 · possession Dec 2023 · 81.8% built · 2 complaints
- Tara City · HaveliNilesh Shivjee Singh · P52100009317 · possession Dec 2018 · 62.4% built · 24 complaints
- LAXMIRANG HEIGHTS · HaveliJAWALKAR ASSOCIATES · P52100009335 · possession Dec 2017 · 90.9% built
- ARCHWAY · Pune (M Corp.)AAB ASSOCIATES · P52100009345 · possession Dec 2019 · 90.9% built
- Mount Unique A Wing · BanerAnand Realtors · P52100009362 · possession Jun 2018 · 90.9% built · 1 complaint
- YUGANDHARA HIGHTS · Baramati (M Cl)ANIL RAMCHANDRA NIMBALKAR · P52100009368 · possession Aug 2022 · 83.6% built
- SAI SHRADDHA PARK PH II WING M N O P PROJECT · Pimpri Chinchawad (M Corp.)GAURI SPACE CREATOR · P52100009376 · possession Dec 2023 · 70.2% built · 1 complaint
- Guruprasad · Hinjavadi (CT)Ashok Ramesh Pashankar · P52100009382 · possession Jun 2025 · 100% built
- Constructing 54 Tenements LIG and 36 Tenements MIG at Gat No 1712 part Dive Taluka Purander Dist Pun · DivePune Housing and Area Development Board Pune · P52100009389 · possession Jun 2018 · 83.8% built
- Times Square · Hinjavadi (CT)Sheth Developers · P52100009391 · possession Dec 2018 · 69.1% built
- Pristine Greens Phase 1 · BORHADEWADIPRISTINE PROPERTIES · P52100009406 · possession Dec 2019 · 90.9% built · 9 complaints
- VIJAY VIHAR · WAGHOLICOL. RPS RAWAT · P52100009408 · possession Dec 2022 · 43.3% built · 13 complaints
- Arihant Garden · HaveliDharmesh Vasantrai Shah · P52100009410 · possession Dec 2017 · 81.6% built
- SWARGANDH · Gujrat colonyPRIDE PROPERTIES & INFRASTRUCTURE · P52100009418 · possession Oct 2020 · 81.8% built
- AUREATE - PHASE 2 · Pimpale SaudagarRAVIRAJ VENTURES · P52100009424 · possession Aug 2018 · 46.6% built
- Ozarde Complex · Baramati (M Cl)Onkar Developers · P52100009428 · possession Dec 2018 · 80% built
- SANSKRUTI RESIDENCY · Baramati (M Cl)PALASH DEVELOPERS · P52100009432 · possession Jan 2021 · 90.9% built
- AKSHA VASANT PARK · Pimpri Chinchawad (M Corp.)UNITED PROPERTIES · P52100009433 · possession Jun 2022 · 90.9% built
- DEVAKI COMPLEX · Alefata (N.V.)DILIP DHARMAJI WAVHAL · P52100009441 · possession Dec 2018 · 23.6% built · 1 complaint
- SHIVANK · Pune CityNABAR ASSOCIATES · P52100009452 · possession Dec 2018 · 90.9% built
- Morya Heights · Sasvad (M Cl)Ekdant Construction And Developers · P52100009456 · possession Dec 2018 · 100% built
- SHIVSAHYADRI · JunnarNANDANVAN DEVELOPERS · P52100009463 · possession Dec 2017 · 90.9% built
- OLYMPIA PHASE 1 · WakadOXFORD INFRA GROUP · P52100009480 · possession Dec 2022 · 52.3% built · 15 complaints
- Aura Sai Krishnangan-Building A · Koregaon Bhima (CT)Bhagvati Infra · P52100009487 · possession Dec 2027 · 81.4% built
- Sairang Residency Phase II · CHAROLIPriyanka Santosh Dhobale · P52100009488 · possession Mar 2018 · 81.8% built
- BABAR POTE RECIDENCY · Pimpri Chinchawad (M Corp.)BABAR POTE ASSOCIATES · P52100009503 · possession Oct 2020 · 70.9% built
- VAASTU IMPERIAL Wing A · HaveliM/S Twin Star Infrastructure · P52100009509 · possession Jun 2026 · 59.5% built · 151 complaints
- Vtp Cygnus- Nation R1-Tower7 · ManjriAshdan Developers Private Limited · P52100009524 · possession Jan 2023 · 90.9% built · 37 complaints
- VTP Leonara H building · MhalungeNNP BUILDCON PVT. LTD · P52100009529 · possession May 2025 · 30 complaints
- CHINCHKAR COMMERCIAL COMPLEX · Baramati (M Cl)SHRI DATTA KRUPA DEVELOPERS · P52100009530 · possession Jul 2018 · 90.9% built
- VTP Leonara E Buidling · MhalungeNNP BUILDCON PVT. LTD · P52100009531 · possession May 2023 · 100% built · 10 complaints
- VTP Beaumonde-Nation R2 Tower4 · manjriAshdan Developers Private ltd · P52100009533 · possession Jan 2023 · 90.9% built · 27 complaints
- VTP Beaumonde-Nation R2 T1 · ManjriAshdan Developers Private Limited · P52100009535 · possession Oct 2024 · 88% built · 25 complaints
- LAXMI SHANTIBAN · HaveliLAXMI ROPERTIES · P52100009542 · possession Oct 2019 · 90.9% built
- Sun View · AMBEGAON BkAUDUMBAR DEVELOPERS · P52100009551 · possession Jul 2022 · 100% built
- HILLCREST · MawalSWAPNASHILP BUILDCON · P52100009556 · possession Oct 2026 · 79.1% built
- VISION FLORA · PIMPLE SAUDAGARSiddhivinayak Namrata Developers · P52100009594 · possession Dec 2021 · 61.8% built · 1 complaint
- NIRMAN RESIDENCY · AmbegaonNIRMAN GROUP · P52100009602 · possession Sept 2018 · 57.9% built
- Peshwai Enclave · Pune (CB)Yemul& Sancheti Associates · P52100009603 · possession Dec 2017 · 46.5% built · 2 complaints
- LAKE TIERRA · HaveliANAND CONSTRUCTIONS · P52100009604 · possession Dec 2026 · 40% built
- AARIV EXOTICA · BALEWADIIK ONKAR CONSTRUCTIONS · P52100009605 · possession Dec 2019 · 84.5% built
- blueberry · WAGHOLIBLUEBERRY HOMES · P52100009610 · possession Oct 2022 · 72.8% built
- PRIVIA SQUARE NX · MOSHIELLORA ASIAN REALTY PRIVATE LIMITED · P52100009616 · possession Jul 2018 · 81.8% built
- Sumeet Co-operative Housing Society · ParvatiM/S SHREERAM BUILDERS · P52100009620 · possession Dec 2017 · 81.8% built
- Dream Savera · LOHGAONMOZE PROPERTIES · P52100009621 · possession Dec 2021 · 81.8% built
- Ashok Nirvaan Villa 43 · Lonavala (M Cl)Truewin Realty Limited · P52100009630 · possession Mar 2018 · 81.8% built
- ROYAL PLAZA · Pimpri Chinchawad (M Corp.)VIGHNAHARTA KESAR GROUP · P52100009631 · possession Jun 2022 · 100% built
- Kate pride · JalochiSagar Mahadev Kate · P52100009632 · possession Jun 2018 · 90.9% built
- Ashish · Pune (M Corp.)Damle Tapdia Developer · P52100009633 · possession Dec 2017 · 81.8% built
- Sai Ellouera · WakadSAI LANDMARKS LLP · P52100009634 · possession Dec 2023 · 85.5% built
- SAKAR APARTMENTS · WakadMAITREE PROMOTERS AND DEVELOPERS · P52100009636 · possession May 2023 · 100% built
- LA CABANA · Sus GaonSigma one shilp ventures · P52100009637 · possession Mar 2019 · 77.3% built · 7 complaints
- Green Republic · WagholiSamrat Buildcon · P52100009638 · possession Jun 2019 · 90.9% built · 2 complaints
- Life Republic Sector R16 - 16th Avenue · JambeKOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED · P52100009640 · possession Dec 2022 · 90.9% built · 1 complaint
- SONTERRA STUDIOS · MulshiJAISONS PROPERTIES LLP · P52100009641 · possession Jul 2029 · 100% built
- GAGAN NULIFE PHASE 1 · KamshetGAGAN LIFESPACE · P52100009642 · possession Mar 2018 · 81.8% built · 7 complaints
- ELITE COLOSSAL-II · Pune (M Corp.)PREMIER DEVELOPERS · P52100009643 · possession Dec 2020 · 81.8% built
- Const.378 LIG,331MIG,154HIG T. · HaveliPune Housing and Area Development Board Pune · P52100009644 · possession Apr 2018 · 98.5% built · 1 complaint
- SAMARTH CARINA · ThergaonMAHESH ZUMBARLAL KHINVASARA · P52100009646 · possession Mar 2019 · 19.1% built
- Mi Casa · UNDRIMarimagnum Constructions · P52100009650 · possession Sept 2024 · 96.4% built
- KAPIL AKHILA · Pune (M Corp.)PADMANABH PIONEER PROMOTERS LLP · P52100009651 · possession Dec 2017 · 100% built · 2 complaints
- ECOPOLITAN PHASE I · MulshiIFTEKHAR PEERPASHAHUSSENI INAMDAR · P52100009653 · possession Dec 2026 · 95.5% built
- Sukhniwas · ShivajinagarAmol Ajit Ravetkar · P52100009654 · possession Jun 2024 · 90.9% built
- Rivaah Regency · WAGHOLIAjay Nanasaheb Jadhavrao · P52100009655 · possession Dec 2019 · 90.9% built
- SAI PLAZA · HaveliSAI MIRACLE DEVELOPERS · P52100009664 · possession Mar 2022 · 79.5% built
- Pankaj Aasmaan Phase I · LahagaonPankaj Developers · P52100009665 · possession Dec 2019 · 81.8% built
- LAMOUR · Pimpri Chinchawad (M Corp.)SPARK LINK VENTURE · P52100009669 · possession Jan 2019 · 62.7% built
- Nahush Primero · LOHGAONNahush Associates · P52100009691 · possession Dec 2027 · 65% built · 3 complaints
- JAI GANESH HERITAGE · Pimpri Chinchawad (M Corp.)JAI GANESH DEVELOPERS · P52100009693 · possession Aug 2019 · 86.4% built
- Siddhi Homes · Chakan (CT)Shree Ganesh Developers · P52100009700 · possession May 2022 · 47.3% built
- MUKTI PARK · VanjarwadiMukti No 2 Sahakari Gruhrachana Santha Marya Baramati · P52100009709 · possession Dec 2017 · 81.6% built
- GANESH SHRUSHTI · Pimpri Chinchawad (M Corp.)SHREE GANESH CONSTRUCTION · P52100009710 · possession Aug 2018 · 88.6% built
- VENKATESH NANDANVAN D WING · Sasvad (M Cl)SANJAY DNYANOBA JAGTAP · P52100009712 · possession Mar 2021 · 44.5% built
- KRISHNAS BLESSING A, B, C BUILDING · NEAR KUMAR MEADOWSVISHAL INFRACON · P52100009717 · possession Aug 2019 · 97% built
- DESTINATION OSIYAN WING AB · CHARHOLID R GAVHANE LANDMARKS LLP · P52100009718 · possession Sept 2022 · 80% built
- Sai Exotique B Wing · Pimpri Chinchawad (M Corp.)SAIBABA SALES PRIVATE LIMITED · P52100009721 · possession Dec 2019 · 81.8% built
- STARGAZE · Bavadhan BKKOLTE-PATIL DEVELOPERS LIMITED · P52100009722 · possession Dec 2018 · 90.2% built · 1 complaint
- KANCHAN ELEENA PHASE I · WakadTRY DEVELOPERS PRIVATE LIMITED · P52100009730 · possession Dec 2021 · 63.6% built
- Urban County A & B Wing · KhedPadmalaya Properties · P52100009754 · possession Dec 2026 · 97.7% built · 2 complaints
- Abhilasha Park · HaveliSarovar Associates · P52100009755 · possession Dec 2019 · 19.2% built
- Defence Colony Pune Phase4 · HaveliDefence Colony Pune · P52100009756 · possession Nov 2026 · 81.8% built · 21 complaints
- DECCAN HEIGHTS PHASE A · MawalDECCAN HEIGHTS PHASE A · P52100009757 · possession Dec 2031 · 19% built · 1 complaint
- BEVERLY HILL · Talegaon Dabhade (M Cl)MS DEVELOPERS · P52100009758 · possession May 2019 · 100% built
- POLARIS · HaveliKESHAVLEELA PROPERTIES · P52100009759 · possession Feb 2027 · 68.1% built · 32 complaints
- Maple Woodz phase-2 · Taware ColonyWindsor Shelters · P52100009772 · possession Dec 2017 · 90.9% built
- VEDANT PINAKIN · MANJARI BkVEDANT BUILDERS · P52100009780 · possession Dec 2018 · 65.5% built
- REVER PARK VIEW · WakadAYUSH DEVELOPERS · P52100009784 · possession Mar 2019 · 100% built
- SOHAM SUMY MADHURYA · WakadSOHAM SUMY DEVELOPERS LLP · P52100009818 · possession Dec 2017 · 64.5% built
- PIETRA ENCLAVE · KatrajPietra Infrastructure · P52100009829 · possession Jun 2018 · 100% built
- VISHNU VIHAR · Pimpri Chinchawad (M Corp.)NOBLE PROMETERS &BULIDERS · P52100009834 · possession Oct 2019 · 90.9% built · 2 complaints
- BHONDVE RESIDENCY · Pimpri Chinchawad (M Corp.)BHONDVE TEMGIRE ASSOCIATES · P52100009836 · possession Nov 2020 · 31.8% built
- GRAND CASA · PCMC(DANGE CHOWK) CHINCHWADKONARK ASSOCIATES · P52100009837 · possession Oct 2022 · 38.2% built
- Regal Residency · ChikahliShamshuddin Abdul Samad Choudhary · P52100009843 · possession Dec 2020 · 49.1% built
- Sun-Srushti Greens · Pimpri Chinchawad (M Corp.)SRUSHTI DEVELOPERS · P52100009844 · possession Aug 2024 · 80% built
- KUL Utsav Phase I -Building F · PuneKumar Builders · P52100009849 · possession Dec 2019 · 90.9% built
Satara
DHANORI
Kharadi
Other
- ProsperoSancheti Sons · P52100007663 · possession Jun 2018 · 89.1% built
- MARVEL CITRINE A BUILDINGMARVEL REALTORS AND DEVELOPERS LTD · P52100007908 · possession Dec 2017 · 90.9% built
- SAI SUNDARAMGURUSAI DEVELOPERS · P52100008044 · possession Oct 2018 · 44.5% built
- SONCHAFAGreenmark Engicon builder and developers · P52100008475 · possession Mar 2019 · 72.7% built
- GOODWILL SQUARECHOICE SHELTERS · P52100008756 · possession Dec 2020 · 100% built
- ABM HOMESABM ASSOCIATES · P52100008869 · possession Mar 2018 · 54.5% built
- FORTUNE PLAZA PHASE IIVENKATESH LAXMI DEVELOPERS · P52100009565 · possession Jun 2022 · 42.3% built
- sparkle avenueSPARKLE BUILDER · P52100009624 · possession Dec 2022 · 66.7% built