- STKANWARRAMPALACIOPHASE24.8 yr overdueVINOD PREMCHAND CHANDWANI · chikhli, PuneP52100000386· 90% built
- Market Place4.8 yr overdueVTP Mohite Associates · UNDRI, PuneP52100000587· filed Dec 2019 → now Dec 2021· 90.9% built
- AERO EAST4.8 yr overdueM/S MIRACLE GURUKRUPA DEVELOPERS · Undri, PuneP52100015149· 72.7% built
- PARAS-VISTA4.8 yr overduePARAS DEVELOPERS · WAKAD, PuneP52100010721· 81.4% built
- SAI PARADISE4.8 yr overdueSHIV CONSTRUCTIONS · Punavale, PuneP52100002193· 94.5% built· 4 complaints
- HIVE 654.8 yr overdueTRINITY GREEN HOMES · Pimple Nilakh, PuneP52100017395· 81.8% built
- VINAYAKAM RESIDENCY4.8 yr overdueREGENCY BUILDER · CHIKHALI, PuneP52100012783· filed Mar 2020 → now Dec 2021· 81.8% built
- PARITOSH A,B,C4.8 yr overdueSHARADA ALLIANCE SHELTERS · Balewadi, PuneP52100004530· 76.1% built
- AMRUT PUSHP4.8 yr overdueMORAYA REALITY GROUP · DUDULGAON, PuneP52100011364· filed Dec 2019 → now Dec 2021· 65.7% built· 2 complaints
- Shlok - Phase 14.8 yr overdueDhankawade Patil Construction · NARHE, PuneP52100001466· filed Dec 2019 → now Dec 2021· 44.2% built
- Nakshatra4.8 yr overdueAshwini Anil Lokhande · Baner, Pune, PuneP52100016234· 90.9% built· 1 complaint
- Devayani Residency4.8 yr overdueYashodhan Associates · Bibwewadi, PuneP52100002412· filed Dec 2019 → now Dec 2021· 90.9% built· 13 complaints
- Apostrophe, Moshi4.8 yr overdueApex Builders · Moshi, PuneP52100000905· 81.8% built
- SHIRKE AND PATIL ASSOCIATES4.8 yr overdueSHIRKE AND PATIL ASSOCIATES · PIMPLE SAUDAGAR, PuneP52100016444· 68.2% built
- AIR MONT4.8 yr overduePRAGATI SPACES · Gahunje, PuneP52100005751· 75.5% built· 1 complaint
- Suvan Forett4.8 yr overdueL M Bafna · Haveli, PuneP52100001907· filed Dec 2019 → now Dec 2021· 90.9% built
- DB Commercial Phase II4.8 yr overduePune Buildtech Private Limited · Yerawada, PuneP52100003455· filed Dec 2019 → now Dec 2021· 60.9% built· 2 complaints
- TANISH PLATINUM4.8 yr overdueTANISH ASSOCIATES · CHARHOLI, PuneP52100004292· 43.3% built
- PRIME BUSINESS CENTER4.8 yr overdueTHE PRIME PROPERTIES · MAWAL, PuneP52100015422· 72.7% built
- Kamalraj Datta Vihar A Bldng4.8 yr overdueKAMALRAJ ESTATE · MOSHI, PuneP52100002971· filed Dec 2019 → now Dec 2021· 90.9% built
- OMSHREE4.8 yr overdueJAY GANESH DEVELOPERS · Charholi Budruk, PuneP52100013484· 45.5% built
- SUYOG ABHILASHA4.8 yr overdueSUYOG ADINATH · Jalochi, PuneP52100012264· filed Dec 2019 → now Dec 2021· 74.1% built
- Shankeshwar Dang Ikon Phase 24.8 yr overdueShree Shankeshwar Atharva Properties · Pimpri Chinchawad (M Corp.), PuneP52100002375· 72.7% built
- Vaishnavi Park4.8 yr overdueKundnani Associates · Chakan (CT), PuneP52100005505· filed Dec 2019 → now Dec 2021· 90.9% built
- GOLDEN WINDS Building A Phase 44.8 yr overdueGOLDEN BRICKS DEVELOPERS · Lohegaon, PuneP52100003838· filed Dec 2019 → now Dec 2021· 76.8% built
- TOWN CENTRAL4.8 yr overdueVAIBHAV CONSTRUCTION · NEAR CENTRAL BUILDING, PuneP52100007390· filed Mar 2019 → now Dec 2021· 95.5% built· 2 complaints
- DWARKAMAI4.8 yr overdueJ P ASSOCIATES · Pune City, PuneP52100004258· 29.8% built
- Gulmohar Park A Wing4.8 yr overdueJay Nanaso Patil · Baramati, PuneP52100016095· 90.9% built
- Suyog Aura Phase II4.8 yr overdueShivram Developers · Haveli, PuneP52100003242· 81.8% built
- Kanchan Vastu Phase I4.8 yr overdueSudhir Vasant Karnataki · PAUD ROAD, PuneP52100005551· 45.5% built
- KANCHAN ELEENA PHASE I4.8 yr overdueTRY DEVELOPERS PRIVATE LIMITED · Wakad, PuneP52100009730· 63.6% built
- 7 Plumeria Drive- Phase 14.8 yr overdueB A Consulting · Punawale, PuneP52100001152· 87.6% built· 1 complaint
- MAGNOVA MANOR PHASE 24.8 yr overdueMAGNOVA REALTY · Mulshi, PuneP52100004968· 27.3% built· 4 complaints
- VENKATESH NAVITA4.8 yr overdueSHREE VENKATESH REALTY · Ambegaon Khurd, PuneP52100017807· 90.9% built
- PARADISE HOMES4.8 yr overduePARADISE MAKER · MAWAN, PuneP52100008042· 90.9% built
- EPITOME PHASE I4.8 yr overdueKasturi Developers · Near Bhumkar Chowk, PuneP52100000703· 81.8% built· 1 complaint
- SHIV ZEN WORLD - PHASE I4.8 yr overdueShubh Housing · MANJARI Bk, PuneP52100007579· 54.5% built
- Bhagyoday Residency - A4.8 yr overduePrashant Developers (Mumbai) · Pimpri Chinchawad (M Corp.), PuneP52100010887· filed Dec 2019 → now Dec 2021· 63.2% built
- Irene4.8 yr overdueANGAL & CO · Erandwane, PuneP52100015640· 90.9% built
- SAVERA PARK4.8 yr overdueSAVERA DEVELOPERS · Baramati (M Cl), PuneP52100014418· 11.1% built
- Bramha Exuberance C4.8 yr overdueBramhacorp Limited · KONDHWA, PuneP52100001076· 90.9% built· 1 complaint
- LOTUS - PHASE 1 B WING4.8 yr overdueRAVIKARAN CONSTRUCTION · Sus, PuneP52100007781· 69.1% built
- Pristine Prolife III4.8 yr overduePRISTINE DEVELOPERS · WAKAD, PuneP52100000897· 95.5% built
- MULSHI VAIBAHV4.8 yr overdueYUVRAJ ASSOCIATES · Pirangut, PuneP52100011020· filed Dec 2019 → now Dec 2021· 76.4% built
- SHUBH NILAYA4.8 yr overdueSHUBH REALTORS · Lohegaon, PuneP52100015446· 78.2% built
- Waves4.8 yr overdueGokhale Constructions · Wakad, PuneP52100003292· 60.6% built· 1 complaint
- TWIN TOWER4.8 yr overdueShraddha Spaces · Wakad, PuneP52100003875· 90.9% built
- 24K ATRIA4.8 yr overdueKOLTE-PATIL DEVELOPERS LIMITED · Haveli, PuneP52100000428· 45.5% built
- YUTHIKA ENCLAVE4.8 yr overdueAJIT DEVELOPERS AND COMPANY · Haveli, PuneP52100024706· 81.8% built
- Noble Nivas - Redevelopment4.8 yr overdueSHARADA LIFESPACES · Gultekadi, PuneP52100015411· 67.7% built
- Crystal Tower4.8 yr overdueKSHITIJ PROMOTERS AND DEVELOPERS · Pashan, PuneP52100000082· filed Dec 2019 → now Dec 2021· 90.8% built· 1 complaint
- Golden Treasures Wing D4.8 yr overdueVINAYAK KISHOR GARVE · Punawale, PuneP52100001147· filed Dec 2019 → now Dec 2021· 76.4% built
- Suvan Cresta - Phase B4.8 yr overdueL M Bafna · BIBVEWADI, PuneP52100000453· filed Dec 2019 → now Dec 2021· 90.9% built
- Dream Savera4.8 yr overdueMOZE PROPERTIES · LOHGAON, PuneP52100009621· 81.8% built
- PANACHE PHASE IV4.8 yr overdueTRIMURTI SAI NATH INFRAS LLP · Katraj, PuneP52100019294· 27.3% built
- VISION FLORA4.8 yr overdueSiddhivinayak Namrata Developers · PIMPLE SAUDAGAR, PuneP52100009594· filed Dec 2018 → now Dec 2021· 61.8% built· 1 complaint
- Primus - A4.8 yr overdueKumar Construction and Properties Pvt Ltd · Hadapsar Industrial Estate, PuneP52100004518· filed Dec 2019 → now Dec 2021· 81.8% built
- ADVIKA PHASE II4.8 yr overdueADVIKA CONSTRUCTIONS PVT.LTD · pisoli, PuneP52100013261· 45.5% built· 1 complaint
- UNITY SPLENDOUR4.8 yr overdueUNITY INFRASTRUCTURE · Pune City, PuneP52100004208· filed Dec 2018 → now Dec 2021· 76.8% built
- PRISTINE VILLA PHASE III4.8 yr overdueATHARV DEVELOPERS · Karla, PuneP52100006460· filed Dec 2019 → now Dec 2021· 25.9% built
- AMAR SERENITY4.8 yr overdueAMAR BUILDERS AND DEVELOPERS · PASHAN, PuneP52100001203· 90.9% built
- Vision Vatika4.8 yr overdueVision Developers · Vitthalwadi, PuneP52100009188· filed Dec 2019 → now Dec 2021· 63.6% built
- EELA Phase-II4.8 yr overdueM/s. Siddhashila Developers · Punawale, PuneP52100004281· filed Dec 2020 → now Dec 2021· 90.9% built
- KOHINOOR BEGONIA PHASE III4.8 yr overdueKOHINOOR ASSOCIATES · varale phata, PuneP52100008679· filed Dec 2019 → now Dec 2021· 90.9% built· 2 complaints
- NANDINI BELLUS4.8 yr overdueVENUS INFRA · MANJARI Bk, PuneP52100002950· 52.3% built· 1 complaint
- SHREE SADGURU KRUPA4.8 yr overdueMAA PRANAAM VENTURE · Katraj, PuneP52100007899· filed Dec 2019 → now Dec 2021· 60.9% built
- ECO PARK4.8 yr overdueDELIGHT DEVELOPERS · CHARHOLI, PuneP52100002220· filed Dec 2019 → now Dec 2021· 90.9% built· 2 complaints
- SAHIL VIGHNESH RESIDENCY4.8 yr overdueVAISHNAVI PROMOTERS AND DEVELOPERS · Wakad, PuneP52100005542· filed Dec 2019 → now Dec 2021· 90.9% built
- Rajgruhi Residency Tower B4.8 yr overdueWellbuild Merchants Private Limited · Kondhwa, PuneP52100006651· filed Dec 2019 → now Dec 2021· 88.3% built· 1 complaint
- VALENCIA4.8 yr overdueBMC GROUP · Mulshi, PuneP52100008024· filed Dec 2019 → now Dec 2021· 81.8% built
- SWARGANDHAR PHASE 1 A4,A5,A6,A7,B6,B74.8 yr overdueVAIBHAV CLASSIC BUILDERS AND DEVELOPERS · Uruli Kanchan, PuneP52100004071· filed Dec 2019 → now Dec 2021· 78.2% built
- Majestique Venice4.8 yr overdueMajestique Nirman LLP · Dhayari Pune, PuneP52100000130· 95.5% built
- GULMOHAR PARK4.8 yr overdueSIDDHIVINAYAK DEVELOPERS · Haveli, PuneP52100006529· filed Dec 2020 → now Dec 2021· 24.5% built
- AARAMBH4.8 yr overdueYashada Nivasa Associates · DUDULGAON, MOSHI, PuneP52100019333· 81.8% built
- 212 RIVERWALK4.8 yr overdueRAMESH BUILDERS (INDIA) · Haveli, PuneP52100001010· filed Dec 2019 → now Dec 2021· 85.5% built
- Soham Residency A Wing4.8 yr overdueKhushbu Realties Pvt. Ltd. · Haveli, PuneP52100019635· 81.8% built
- EMPIRE ETERNITY4.8 yr overdueEMPIRE CONSTRUCTION · KHONDWA KHURD, PuneP52100015310· 90.9% built· 2 complaints
- SPLENDID COUNTY PHASE III4.8 yr overdueYASHADA BUILDERS · LOHGAON, PuneP52100016493· 90.9% built
- PALM NEST-PHASE I4.8 yr overdueNG RATHI PROPERTIES LLP · WAGHOLI, PuneP52100013717· 27.3% built
- DELLA VILLA PHASE 44.8 yr overdueDELLA ENCLAVE PRIVATE LIMITED · LONAVALA, PuneP52100006680· 72.7% built· 1 complaint
- EPIC PHASE 14.8 yr overdueSHIVSAGAR PROMOTERS & DEVELOPERS · Wagholi, PuneP52100016456· 50% built
- Govindbaug4.8 yr overdueM/S PIONEER DEVELOPERS · Dudulgaon, PuneP52100001469· filed Dec 2022 → now Dec 2021· 71.8% built
- Prem Mannat4.8 yr overdueGeeta Builder Arihant Venture · Tajanemala, PuneP52100015202· 81.8% built· 1 complaint
- Blue Dice4.7 yr overdueDHANRAJ KESARIMAL SONIGARA · Chikhali Bk., PuneP52100004228· filed Jan 2020 → now Jan 2022· 72.7% built
- SWAMI KRUPA RESIDENCY4.7 yr overdueVISHWA DEVELOPERS · Alandi (M Cl), PuneP52100014477· 53.6% built
- Saraswati Park4.7 yr overdueGokhale Constructions · Ideal Colony, PuneP52100004346· filed Jan 2020 → now Jan 2022· 90.9% built
- ORIANA CREST4.7 yr overdueBALAJI BUILDERS · Mulshi, PuneP52100006821· 65.4% built
- AVNINDRA4.7 yr overdueATUL AMRUT DHANE · Haveli, PuneP52100026232· 81.8% built
- Sharvari Homes4.7 yr overdueVMG BUILDCON · Wadachi Wadi, PuneP52100022945· 81.8% built
- MADHUVRUNDA CO-OPERATIVE HOUSING SOCIETY4.6 yr overdueAakar Constructions · ERANDWANE, PuneP52100018201· 64.5% built
- AKSHA AMULYAM4.6 yr overdueConcord Properties · Pimpri Chinchawad (M Corp.), PuneP52100010533· filed Apr 2020 → now Feb 2022· 88.2% built
- ADITI PARK4.6 yr overdueAKRUTI BUILDCON · BARAMATI, PuneP52100015417· 63.6% built
- ACE AURUM4.6 yr overdueACE AURUM · Opp. Bondave Vasti BRT Stop, Ravet Pune - 412101, PuneP52100000090· filed Aug 2021 → now Feb 2022· 90.9% built
- RAJESHWARI ENCLAVE4.6 yr overdueRAJRATNA DEVELOPERS · Fursungi, PuneP52100013589· filed Jun 2018 → now Feb 2022· 77.3% built
- SOLITAIRE PALMS E4.6 yr overdueRAJKUMARI GULAB CHOITHRAMANI · Borhadewadi,Moshi, PuneP52100001927· filed Mar 2020 → now Mar 2022· 81.8% built· 2 complaints
- SEYA4.6 yr overdueSEYA PATE CONSTRUCTIONS LLP · SINHAGAD ROAD, PuneP52100001129· filed Sept 2020 → now Mar 2022· 43.6% built· 8 complaints
- Sai Planet4.6 yr overdueIrshad Ali Jabbar Shaikh · Near to koaushal banglow, PuneP52100022566· 45.5% built
- NYATI ESTEBAN I4.5 yr overdueNYATI REALTORS LLP · Mohammaswadi, PuneP52100003767· filed Jun 2021 → now Mar 2022· 79% built· 14 complaints
- ACE AURUM - II PHASE 014.5 yr overdueAALIA HOMES · RAVET, PuneP52100015591· 90% built
- WATERS EDGE PHASE V4.5 yr overdueOM SAGAR DEVELOPERS · PIMPLE NILAKH, PuneP52100002038· 90.9% built
- Shreeniwas4.5 yr overdueLAGOO APTE · Pune (M Corp.), PuneP52100014480· 35.3% built
- Gurukripa Heights4.5 yr overdueMount Estates Pvt. Ltd · Haveli, PuneP52100005161· filed Sept 2018 → now Mar 2022· 90.9% built
- FRESHIA4.5 yr overdueKundan Mehta Kenjale Jointventure · pune, PuneP52100012434· filed Jun 2021 → now Mar 2022· 90.9% built
- LomateResidency4.5 yr overdueHemant Ramesh Lomte · Vatannagar, PuneP52100019013· 90.9% built
- EMPIRE SQUARE PHASE II4.5 yr overdueEMPIRE PROPERTIES · Haveli, PuneP52100005190· filed Sept 2020 → now Mar 2022· 97% built· 1 complaint
- SAI ANKOOR4.5 yr overdueNarendra Jalinder Balwadkar · Balewadi, PuneP52100015931· 90.9% built· 1 complaint
- POLITE HARMONY COMMERCIAL CENTRE4.5 yr overduePOLITE PROMOTERS AND BUILDERS · CHIKHALI, PuneP52100024722· 90.9% built
- COLLINA4.5 yr overdueBHARUCHA & SONS REALTORS & DEVELOPERS PVT LTD · Kanhe, PuneP52100002704· 89.1% built· 2 complaints
- KOLOSUS GREEN CITY PHASE 14.5 yr overdueLEBBERTY PROMOTERSS AND BUILDERS · Pimpri Chinchawad (M Corp.), PuneP52100009898· filed Sept 2020 → now Mar 2022· 86% built
- Signature Heights4.5 yr overdueSamruddhi Properties · Wakad, PuneP52100021583· 66.2% built
- Natures Blessings phase I4.5 yr overdueNagarkar Developers · GORHE BDK, PuneP52100006429· filed Sept 2019 → now Mar 2022· 90.9% built· 2 complaints
- Skyi Star Town Phase III4.5 yr overduePate Life Melange Developers Pvt Ltd · Bhukum, PuneP52100016286· 90.9% built· 1 complaint
- Atul Avenue-A4.5 yr overdueNeelabh Builders And Developers · Haveli, PuneP52100016664· 81.8% built
- SWOJAS GAURI4.5 yr overdueSWOJAS ENTERPRISES · ERANDWANA, PuneP52100020353· 4.5% built
- VENKATESH GRAFFITI PHASE 54.5 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAV NAGAR MUNDHWA, PuneP52100018950· 90.9% built
- DELTA HIGH BLDG B PHASE I4.5 yr overdueSVASTI MAHAJAN REALTORS · BHUGAON, PuneP52100015089· 82.8% built· 1 complaint
- Basil Park C and D Wing4.5 yr overdueM/s Yogesh Enterprises · Haveli, PuneP52100011415· filed Dec 2019 → now Mar 2022· 81.8% built
- XRBIA EIFFEL CITY CHAKAN PH24.5 yr overdueXRBIA CHAKAN DEVELOPERS PRIVATE LIMITED · Chakan, PuneP52100003059· filed Sept 2020 → now Mar 2022· 86.8% built· 46 complaints
- MICASAA PHASE 24.5 yr overdueGAGAN GLOBAL DEVELOPERS · Wagholi, PuneP52100004919· filed Sept 2020 → now Mar 2022· 90.9% built
- SAI PLAZA4.5 yr overdueSAI MIRACLE DEVELOPERS · Haveli, PuneP52100009664· 79.5% built
- PLATINUM PALLAZO4.5 yr overduePLATINUM SQUARE · Chichwad, PuneP52100008686· filed Mar 2020 → now Mar 2022· 81.8% built· 1 complaint
- Aldea Espanola Phase V4.5 yr overduePuranik Buildcon Private Limited · Mahalunge, PuneP52100000572· 90.9% built
- SAPPHIRE4.5 yr overdueSai Nisarg Developers LLP · Pimpri Chinchawad (M Corp.), PuneP52100008695· 74.5% built
- VASUNDHARA4.5 yr overdueRIDDHI SIDDHI DEVELOPERS · AMBEGAON KH, PuneP52100006501· 50% built
- Sadashanti4.5 yr overdueDigamber Parulekar · Kothrud, PuneP52100020351· 81.8% built
- SHONEST TOWER PHASE II4.5 yr overdueM/S SANSKRUTI AND ESSEN ASSOCIATES · Wakad, PuneP52100004000· filed Mar 2019 → now Mar 2022· 76.5% built
- NYATI ELAN SOUTH EAST I4.5 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100016232· 78.8% built
- BENCHMARK4.5 yr overdueNG RATHI DEVELOPERS · UNDRI, PuneP52100015705· filed Mar 2021 → now Mar 2022· 90.9% built· 1 complaint
- KSHITHI4.5 yr overdueG AND S ASSOCIATES · BANER, PuneP52100000607· 81.8% built
- NAMAN SUDARSHAN4.5 yr overdueNaman Developers · SHIVAJINAGAR BHAMBURDA, PuneP52100030266· 86.4% built
- JISHA ORCHID4.5 yr overdueYASH BUILDERS · RAHATANI, PuneP52100029044· 81.8% built
- KAMAL CLASSIC4.5 yr overdueVENKATESHWARA BUILDCON · OLD SANGVI, PuneP52100029717· 70% built
- MANHATTAN4.5 yr overdueMAJESTIQUE HOUSING LLP · Wagholi, PuneP52100001192· 97.6% built
- POORVA AANGAN4.5 yr overduePOORVA ASSOCIATES · Walhe, PuneP52100013892· 81.8% built
- Acropolis 24.5 yr overdueMillennium Developers · Vinode Wasti, PuneP52100015821· 90.9% built
- Pancham Phase II at Nanded City4.5 yr overdueNanded City Development & Construction Co. Ltd. · Nanded City, PuneP52100000288· 99.2% built
- ANSHUL CASA G BUILDING4.5 yr overdueM/S ANSHUL SIDDHI PROMOTERS AND BUILDERS · Wakad, PuneP52100001429· 90.9% built
- Pollens Luxuria4.5 yr overdueSiddhivinayak infra · kalepadal, PuneP52100016336· 93.9% built· 1 complaint
- ECO VALLEY PLUS4.5 yr overdueNAMRATA JALAN VENTURES · Kanhe, PuneP52100016509· 90.9% built
- Shivalay4.5 yr overdueKedar Developers · MANJARI Bk, PuneP52100008842· 56.4% built
- Radha Classic4.5 yr overdueRadha Housing · Vadgaon Anand.(Aalephata), PuneP52100017411· filed Oct 2020 → now Apr 2022· 60% built
- SHREE LAXMI NABHANGAN4.5 yr overdueBHAGYALAXMI ENTERPRISES · Near Ram Mandir, PuneP52100016414· 73.5% built
- VERDE RESIDENCE COLLECTION4.5 yr overdueSTRATFORD REALTY LLP · Yerwada, PuneP52100004841· filed Oct 2020 → now Apr 2022· 88.6% built· 1 complaint
- The Palms4.5 yr overdueKetsun Enterprises · Pune (M Corp.), PuneP52100008404· filed Jun 2018 → now May 2022· 72.6% built
- NAGESHWAR PROPERTIES4.4 yr overdueSAMBHAJI BABAN BORADE · Haveli, PuneP52100006098· 90.9% built
- Westernhills D 64.4 yr overdueHigh Seas Properties Private Limited · Pune, PuneP52100001257· filed Jan 2021 → now May 2022· 90.9% built
- Sejal Homes4.4 yr overdueSAUBHARI DEVELOPERS · CHAKAN, PuneP52100011006· 63.6% built
- Siddhi Homes4.4 yr overdueShree Ganesh Developers · Chakan (CT), PuneP52100009700· 47.3% built
- DESTINATION KSHITIJ4.4 yr overdueD R GAVHANE DESTINATION · Haveli, PuneP52100014715· 33.2% built
- ABHILASHA4.4 yr overdueKUDALE SABLE BUILDERS · Shirur, PuneP52100008268· filed Nov 2020 → now May 2022· 80% built
- Skyi Songbirds Phase B4.4 yr overdueEnerrgia Skyi Developers · Bhugaon, PuneP52100001117· filed Nov 2020 → now May 2022· 85.7% built· 1 complaint
- Skyi Songbirds Phase D4.4 yr overdueEnerrgia Skyi Developers · Bhugaon, PuneP52100000764· filed Nov 2020 → now May 2022· 90.9% built· 7 complaints
- SUVIDHA HARIPRASAD4.4 yr overdueSUVIDHA CONSTRO · MAYUR COLONY, PuneP52100021241· 40.9% built
- SAVALI SAFFRON PHASE - I4.4 yr overdueSAPTSIDDHI ASSOCIATES · MUNDHWA, PuneP52100013111· 90.9% built· 1 complaint
- Majestic Pearl4.4 yr overdueVikas Narayan Virkar · Baner, PuneP52100007513· filed Jun 2019 → now May 2022· 36.4% built
- Geras Imperium Rise4.4 yr overdueGera Developments Private Limited · Hinjewadi, PuneP52100001786· filed Dec 2020 → now May 2022· 90.9% built· 38 complaints
- El-Homes4.4 yr overdueR D Deshpanday Developers Pvt Ltd · Opp PAN Card club, PuneP52100016546· 89.5% built· 5 complaints
- Royal Bliss4.4 yr overdueJay Ganesh Associates · Kiwale, PuneP52100015623· filed Jun 2021 → now May 2022· 29.1% built
- ABHIMAAN HOMES PHASE II4.4 yr overdueRISING PROPCON LLP · Shirgaon, PuneP52100000285· filed Dec 2019 → now May 2022· 88.9% built· 1 complaint
- IMPERIAL TOWER C WING4.4 yr overdueAGCONSTRUCTIONS · NIBM, PuneP52100019566· 28.2% built
- E Wing4.4 yr overdueVinayak Pandharinath Bhongale · Near Modern College of Pharmacy Borhadwadi Moshi Pune, PuneP52100019750· 14.5% built· 1 complaint
- SAHIL PRIDE4.4 yr overdueYOGESH OMPRAKASH AGARWAL · YEWALEWADI, PuneP52100005445· filed Dec 2020 → now Jun 2022· 10% built
- AZURE B4.4 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Tathwade, PuneP52100016218· 99.5% built
- REVELL ORCHID PHASE III BUILDING E4.4 yr overdueABHAY INDRABHAN FULFAGAR · LOHGAON, PuneP52100001549· 46.8% built
- CHINMAY VAISHVA PHASE 24.3 yr overdueCHINMAY VISHWA · NEAR AMBEGAON PATHAR POLICE CHOWKI, PuneP52100027024· 72.7% built
- AVON VISTA PROJECT -14.3 yr overdueNAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD · PUNE, PuneP52100000371· filed Dec 2020 → now Jun 2022· 87.9% built· 5 complaints
- 11 PARK STREET A WING4.3 yr overdueTRIMURTI HOUSING · Pisoli, PuneP52100003117· 90.9% built
- SAI SANSKRUTI4.3 yr overdueSAI RACHANA LIFE SPACES · yevalewadi, PuneP52100007881· filed Jun 2021 → now Jun 2022· 81.8% built
- Ganga Paritosh B4.3 yr overdueGoel Mohata Associates · Sinhgad Road, PuneP52100001470· filed Jan 2021 → now Jun 2022· 76.4% built
- The Address - 24.3 yr overdueSOL Developers · MOSHI, PuneP52100007886· filed Jun 2020 → now Jun 2022· 82.8% built
- BASERA ETERNITY4.3 yr overdueSANJEEVKUMAR RAMESHCHANDRA AGARWAL · Rajiv Gandhi Infotech Park, PuneP52100008447· filed Dec 2019 → now Jun 2022· 81.8% built· 1 complaint
- Vrundavan Residency4.3 yr overdueSwamiraj Developers LLP · Haveli, PuneP52100028242· 75.9% built
- Mont Vert Belbrook4.3 yr overdueMont Vert Elegance · Mulshi, PuneP52100002449· filed Dec 2018 → now Jun 2022· 93.9% built
- Royal Orange County C Wing4.3 yr overdueNavras Sthapatya LLP · Pimpri Chinchawad (M Corp.), PuneP52100003764· 90.9% built
- MOUNTSCAPE4.3 yr overdueNAYAN BUILDCON · Pisoli, PuneP52100006878· filed Jun 2021 → now Jun 2022· 79.5% built
- JD GREEN PARADISE4.3 yr overdueDATTATRAYA GULABRAO KHANDAVE · LOHGAON, PuneP52100004183· 35.9% built
- NEELAYA PROJECT 24.3 yr overdueNAIKNAVARE BUILDCON PVT LTD · TALEGAON, PuneP52100021179· 79.5% built· 1 complaint
- KOHINOOR MAJESTY WING A4.3 yr overdueKOHINOOR MAJESTY · Varale, PuneP52100001379· 81.8% built
- GLOBAL HEIGHTS4.3 yr overdueMD CREATION · CHARHOLI, PuneP52100007709· filed Dec 2020 → now Jun 2022· 90.9% built
- Sara Metroville A phase II4.3 yr overdueSara Infrastructures · Punawale, PuneP52100002174· filed Jun 2021 → now Jun 2022· 81.8% built
- PARK IVORY PHASE II4.3 yr overdueSUNGUARD BUILDERS LLP · KALEWADI PHATA, PuneP52100015699· 90.9% built
- Regency Classic Wing B24.3 yr overdueREGENCY NIRMAN LTD · Pune (M Corp.), PuneP52100005014· 60.9% built
- SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C14.3 yr overdueVAIBHAV CLASSIC BUILDERS AND DEVELOPERS · Uruli Kanchan, PuneP52100004672· filed Dec 2019 → now Jun 2022· 48.1% built
- Puraniks Abitante Phase 1A4.3 yr overduePuranik Buildcon Private Limited · Bavadhan BK, PuneP52100000437· 90.9% built· 3 complaints
- RAMALAY APARTMENT4.3 yr overdueM/S SHREERAM BUILDERS · NEAR GAJANAN MAHARAJ MATH, PuneP52100017117· 81.8% built
- SHARADA MYRIA4.3 yr overdueSHARADA ERECTORS PRIVATE LIMITED · Haveli, PuneP52100012315· filed Dec 2020 → now Jun 2022· 86.8% built
- DREAM HOME PANNA4.3 yr overdueDREAM HOME BUILDERS · Hadapsar, PuneP52100006303· filed Dec 2017 → now Jun 2022· 90.9% built
- AKSHA VASANT PARK4.3 yr overdueUNITED PROPERTIES · Pimpri Chinchawad (M Corp.), PuneP52100009433· filed Dec 2019 → now Jun 2022· 90.9% built
- Allure4.3 yr overdueDreamland Venture · Wagholi, PuneP52100002402· filed Mar 2019 → now Jun 2022· 86.4% built
- SIDDHANT RUTURANG4.3 yr overdueCHAITANYA BUILDCON · Haveli, PuneP52100005960· filed Dec 2019 → now Jun 2022· 90.9% built
- 1 Nere Residency4.3 yr overdueRajHeramb Landmarks · NERE, PuneP52100002517· filed Dec 2018 → now Jun 2022· 88.2% built· 2 complaints
- Puneville Phase I4.3 yr overdueBENCHMARRK REALTY PRIVATE LIMITED · Punawale, PuneP52100000441· filed Dec 2020 → now Jun 2022· 89.1% built
- SUBHADRA APARTMENT4.3 yr overduePOTEAR ASSOCIATES · Baramati (M Cl), PuneP52100004395· filed Jun 2021 → now Jun 2022· 81.8% built
- WHISTLING WINDS4.3 yr overdueNarendra Shantilal Bhandari · Near Balaji Hotel, PuneP52100007671· filed Jun 2019 → now Jun 2022· 55.5% built
- VISION INDRATEJ4.3 yr overdueVISION BUILDCON · TATHAWADE, PuneP52100019399· 90.9% built
- KAKADE PLAZA PHASE 2 JVA MALL4.3 yr overdueSuryakant Kakade · Haveli, PuneP52100007918· filed Dec 2019 → now Jun 2022· 87.3% built
- Gagan Adira Phase 14.3 yr overdueTopaz Homes LLP · Wagholi, PuneP52100001048· filed Dec 2020 → now Jun 2022· 64.4% built· 15 complaints
- Yashodhan Daffodils4.3 yr overdueYASHODHAN DEVELOPMENT CORPORATION · Kondhwa BK., PuneP52100005635· filed Jul 2019 → now Jun 2022· 95.5% built· 3 complaints
- SHUBHKALASH B WING4.3 yr overdueTulip Developers · Chikhali, PuneP52100002475· filed Dec 2020 → now Jun 2022· 90.9% built
- AKSHAY VILLA4.3 yr overdueAKSHAY INFRASTRUCTURE PVT LTD · AMBEGAON Bk, PuneP52100007501· filed Apr 2020 → now Jun 2022· 72.7% built