Delayed projects in Pune
3,375 MahaRERA-registered projects in Pune are past the possession date on file and still under 100% built. Where the promoter has formally revised the date, the original is shown alongside so you can see what changed.
Page 11 of 17
- SIDDHANT RUTURANG4.1 yr overdueCHAITANYA BUILDCON · Haveli, PuneP52100005960· filed Dec 2019 → now Jun 2022· 90.9% built
- The Address - 24.1 yr overdueSOL Developers · MOSHI, PuneP52100007886· filed Jun 2020 → now Jun 2022· 82.8% built
- Royal Orange County D wing4.1 yr overdueNavras Sthapatya LLP · Pimpri Chinchawad (M Corp.), PuneP52100004820· 90.9% built
- PARK IVORY PHASE II4.1 yr overdueSUNGUARD BUILDERS LLP · KALEWADI PHATA, PuneP52100015699· 90.9% built
- EELA Phase-III4.1 yr overdueM/s. Siddhashila Developers · Punawale, PuneP52100024257· 90.9% built
- NEELAYA PROJECT 24.1 yr overdueNAIKNAVARE BUILDCON PVT LTD · TALEGAON, PuneP52100021179· 79.5% built· 1 complaint
- SAI SANSKRUTI4.1 yr overdueSAI RACHANA LIFE SPACES · yevalewadi, PuneP52100007881· filed Jun 2021 → now Jun 2022· 81.8% built
- JD GREEN PARADISE4.1 yr overdueDATTATRAYA GULABRAO KHANDAVE · LOHGAON, PuneP52100004183· 35.9% built
- Allure4.1 yr overdueDreamland Venture · Wagholi, PuneP52100002402· filed Mar 2019 → now Jun 2022· 86.4% built
- Gandharva Excellence Project III H Building Part 24.1 yr overdueVinayak Pandharinath Bhongale · Borhadewadi Moshi, PuneP52100026673· 36.4% built· 1 complaint
- Sai Sneh Phase-I4.1 yr overdueGS DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100004300· 72.7% built
- Yashodhan Daffodils4.1 yr overdueYASHODHAN DEVELOPMENT CORPORATION · Kondhwa BK., PuneP52100005635· filed Jul 2019 → now Jun 2022· 95.5% built· 3 complaints
- SWARGANDHAR PHASE 2 A1,A2,A3,B1,B2,B3,B4,B5,C14.1 yr overdueVAIBHAV CLASSIC BUILDERS AND DEVELOPERS · Uruli Kanchan, PuneP52100004672· filed Dec 2019 → now Jun 2022· 48.1% built
- Marvel Castella A And B Building4.1 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Balewadi, PuneP52100002438· 0% built· 6 complaints
- Puraniks Abitante Phase 1A4.1 yr overduePuranik Buildcon Private Limited · Bavadhan BK, PuneP52100000437· 90.9% built· 3 complaints
- VISION INDRATEJ4.1 yr overdueVISION BUILDCON · TATHAWADE, PuneP52100019399· 90.9% built
- 11 PARK STREET A WING4.1 yr overdueTRIMURTI HOUSING · Pisoli, PuneP52100003117· 90.9% built
- Akash Towers A and B4.1 yr overdueLunkad Builders LLP · Pimple Nilakh, PuneP52100019140· 86.4% built· 1 complaint
- Ganga Paritosh B4.1 yr overdueGoel Mohata Associates · Sinhgad Road, PuneP52100001470· filed Jan 2021 → now Jun 2022· 76.4% built
- KUSHAL SWARNALI C44.1 yr overdueKushal Adiraj Associates · Chakan, PuneP52100004813· filed Dec 2019 → now Jun 2022· 27.3% built
- ALANKAPURISHREE CO.OP.HSG.SOC.LTD.4.1 yr overdueVYAS BUILDCON PVT. LTD. · RAMBAUG COLONY, PuneP52100018752· 81.8% built
- Savitri Park4.1 yr overdueNAKSHATRA BUILDCON · Rao Colony , Talegaon Dabhade, PuneP52100022629· 72.7% built
- Westernhills Phase 2 - B, C, D, E Buildings4.1 yr overdueHigh Seas Properties Private Limited · Pune, PuneP52100001239· 90.9% built· 3 complaints
- Rudradham B Building4.1 yr overdueRudra Construction And Developers · Daund (CT), PuneP52100010197· 72.7% built
- NIRVANA HOMES4.1 yr overdueFortune Elite · Pimpri, PuneP52100013565· filed Oct 2020 → now Jul 2022· 83.2% built
- Atharva Shrishti, Phase 1, Wing A4.1 yr overdueATHARVA BUILDCON · PUNE, PuneP52100006976· filed Jan 2021 → now Jul 2022· 72.7% built
- Sambhaji Park4.1 yr overdueSambhaji Shivaji Pawar · Gopalwadi, PuneP52100003923· 22.7% built
- Mantra Magic II4.1 yr overdueMantra Infrahome LLP · Chimbali, PuneP52100000137· filed Jan 2021 → now Jul 2022· 48.6% built· 2 complaints
- GK SAPPHIRE4.1 yr overdueG K BUILDCON · Pimpale Saudagar, PuneP52100000466· 81.8% built
- Samarth sankul Heights4.1 yr overdueM K ASSOCIATES · Gopalwadi, PuneP52100011465· filed Jul 2018 → now Jul 2022· 54.5% built
- NYATI ETHOS I - B34.1 yr overdueNYATI BUILDERS PRIVATE LIMITED · undri, PuneP52100002024· 37.5% built
- VASTU APPARTMENTS4.1 yr overdueVASTU DEVELOPERS · Haveli, PuneP52100032529· 90.9% built
- NYATI ETHOS I - A1-Part4.1 yr overdueNYATI BUILDERS PRIVATE LIMITED · Undri, PuneP52100001879· 37.3% built
- The Villas4.1 yr overdueSukhwani Associates · Pangaloli, PuneP52100001774· 78.2% built
- FINSWELL4.1 yr overdueLMS REALTY · LOHGAON, PuneP52100008359· 80.5% built· 3 complaints
- Megapolis Symphony Phase I4.1 yr overduePegasus Properties Pvt. Ltd. · Hinjawadi, PuneP52100000887· 90.9% built· 2 complaints
- Arihant Royalty4.1 yr overdueDharmesh Vasantrai Shah · Haveli, PuneP52100011091· filed Dec 2017 → now Jul 2022· 90.7% built
- ATHASHRI SYNERGY4.1 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · MAHALUNGE, PuneP52100001787· 90.9% built
- Spine City Residency Building C4.1 yr overdueSpine Developers · Kharabwadi, PuneP52100010634· filed Feb 2021 → now Aug 2022· 90.9% built
- SADASHIV RESIDENCY4.1 yr overdueOMKAR DEVELOPERS · Pune (M Corp.), PuneP52100004338· filed Mar 2020 → now Aug 2022· 9.1% built
- YUGANDHARA HIGHTS4.0 yr overdueANIL RAMCHANDRA NIMBALKAR · Baramati (M Cl), PuneP52100009368· filed Jul 2019 → now Aug 2022· 83.6% built
- Park Infinia Phase IV4.0 yr overdueKumar Properties and Real Estate Pvt. Ltd. · Hadapsar, PuneP52100014939· 90.8% built
- Tamrind Park Phase - 14.0 yr overdueDhankawade Pokale Developers · Dhareshwar Temple, PuneP52100001405· filed Feb 2020 → now Aug 2022· 87.9% built
- Venkatesh Graffiti Elite Phase 14.0 yr overdueSHREE VENKATESH DEVELOPERS · Keshav Nagar, PuneP52100017577· 90.9% built
- Sai Exotique D Wing4.0 yr overdueSAIBABA SALES PRIVATE LIMITED · Haveli, PuneP52100004171· filed Aug 2020 → now Aug 2022· 56.8% built· 1 complaint
- Anand Tarang A building4.0 yr overdueR K LUNKAD BUILDERS AND PROMOTERS · Charoli Phata , Chovisawadi, PuneP52100022482· 78.2% built
- Skyi Star Town Phase I4.0 yr overduePate Life Melange Developers Pvt Ltd · Bhukum, PuneP52100012998· filed Feb 2021 → now Aug 2022· 90.9% built· 1 complaint
- Skyi Star Town Phase II4.0 yr overduePate Life Melange Developers Pvt Ltd · Bhukum, PuneP52100014662· 86.4% built· 1 complaint
- Princeville - B4 and B54.0 yr overdueKumar Construction and Properties Pvt Ltd · Borhadewadi, PuneP52100015685· 90.9% built
- SATYAM PARADISE4.0 yr overdueArjun Amarsing Mohandas · New Christian Colony, PuneP52100032584· 73.2% built
- SOLITAIRE PALMS D3.9 yr overdueRAJKUMARI GULAB CHOITHRAMANI · BORHADEWADI, PuneP52100002144· filed Mar 2021 → now Sept 2022· 63.6% built· 2 complaints
- SAI PLAZA3.9 yr overdueSHREE DEVELOPERS · AMBEGAON Bk, PuneP52100011700· 74.5% built
- SAI MAJESTIC3.9 yr overdueM/S SHREE BHAIRAVNATH DEVELOPERS · AMBEGAON Bk, PuneP52100011086· 61.4% built
- SHIV PARK3.9 yr overdueTRIMURTI DEVELOPERS · RADHESHWARI HOUSING CO-OPERATIVE SOCIETY, PuneP52100015980· filed Mar 2022 → now Sept 2022· 90.9% built
- Alankapuram Ph 3 B and C building3.9 yr overdueR K Lunkad Housing corporation · wadmukhwadi, PuneP52100020392· 81.8% built
- P S SANKALP3.9 yr overdueP S DEVELOPERS · DHANORI, PuneP52100028596· 11.5% built
- THE ENCLAVE3.9 yr overdueKhivansara Associates · kondhwa BK, PuneP52100006195· filed Dec 2019 → now Sept 2022· 57.5% built
- NISARG VATIKA3.9 yr overdueM/s Shubh Ganesh Properties · Mawal, PuneP52100004252· filed Jul 2019 → now Sept 2022· 90.9% built
- Shree Apartment3.9 yr overdueRevive Homes LLP · Model Colony, PuneP52100021408· 81.8% built
- SHASHITARA HILLS3.9 yr overdueSHRIKANT SHASHIKANT JAGTAP · Haveli, PuneP52100008119· filed Jan 2018 → now Sept 2022· 51.8% built
- AXIS PROXIMA3.9 yr overdueIKAI SPACES LLP · Haveli, PuneP52100030209· 81.8% built
- DIVINE MIST3.9 yr overdueV & T Properties · Kalewadi Rahatani, PuneP52100003638· filed Feb 2021 → now Sept 2022· 73.5% built
- ROYAL ELEGANCE3.9 yr overduePRAKASH CONSTRUCTION COMPANY · Village RAHATANI, PuneP52100016850· 77.3% built
- EVA HOMES3.9 yr overdueS M REALTY · Chikhali, PuneP52100016702· 81.8% built
- MAULI3.9 yr overdueAA ASSOCIATES · BANER, PuneP52100024756· 90.9% built
- GAURAV PARK3.9 yr overdueRENUKA CONSTRUCTIONS · TAPODHAM COLONY, PuneP52100012750· filed Sept 2019 → now Sept 2022· 90.9% built
- PRATHAMESH RESIDENCY3.9 yr overduePRALHAD RAMBHAU SHIRSATH · MOHAN NAGAR, PuneP52100027691· 90.9% built
- MOHAN APARTMENT PHASE I3.9 yr overdueARCHWAY PROPERTIES · SADASHIV PETH, PuneP52100019812· 90.9% built
- Godrej 243.9 yr overduePearlite Real Properties Private Limited · Hinjavadi (CT), PuneP52100001005· 89.1% built· 13 complaints
- Shri Abhivishwa3.9 yr overdueSachin Bapurao Khupse · Kudalwadi , Chikhali , Pune, PuneP52100015164· filed Mar 2020 → now Sept 2022· 72.7% built
- ACE AUGUSTA3.9 yr overdueACEAUGUSTA · Near The Quardron Business Park, Maan Pune, PuneP52100000080· filed Mar 2021 → now Sept 2022· 90.5% built· 2 complaints
- DESTINATION OSIYAN WING AB3.9 yr overdueD R GAVHANE LANDMARKS LLP · CHARHOLI, PuneP52100009718· 80% built
- SHREE CHINTAMANI APARTMENTS3.9 yr overdueNISHIKANT SHARAD CHAUDHARI · Pashan, PuneP52100007779· filed Sept 2018 → now Sept 2022· 53.9% built
- Aeropolis Phase III3.9 yr overdueKrishna developers · Lohgaon, PuneP52100019401· 90.9% built
- BLUE BIRD CO OPERATIVE SOCIETY LTD3.9 yr overdueASHA ARUN SANE · PUNE, PuneP52100018398· 81.8% built
- Sara Sanskruti3.9 yr overdueJagrutsara Structures LLP · Chakan, PuneP52100013952· 90% built
- MEGHMALHAR3.9 yr overdueTRAILOKYA DEVELOPERS · Warje, PuneP52100005209· filed Jul 2020 → now Sept 2022· 18.2% built
- CROWN C13.9 yr overdueDMK INFRASTRUCTURE PVT LTD · MOSHI, PuneP52100020978· 46.4% built· 1 complaint
- blueberry3.9 yr overdueBLUEBERRY HOMES · WAGHOLI, PuneP52100009610· filed Mar 2019 → now Oct 2022· 72.8% built
- 41 ELITE3.9 yr overdueM/S KRISALA ENTERPRISES · NEAR SHARAYU TOYOTA SHOWROOM, PuneP52100018193· 56.4% built
- KAMALA KASTURI3.9 yr overdueMEHUL SURESH GARG · Haveli, PuneP52100011567· filed Dec 2018 → now Oct 2022· 50.9% built
- GRAND CASA3.8 yr overdueKONARK ASSOCIATES · PCMC(DANGE CHOWK) CHINCHWAD, PuneP52100009837· filed Apr 2021 → now Oct 2022· 38.2% built
- Skyways Esfera 23.8 yr overdueMoze Associates · Lohegaon, PuneP52100018101· 81.8% built
- ACE AASTHA BUILDING A3.8 yr overdueSAKSHI DEVELOPERS · OPP. TANISHQ ORCHID SOCIETY, PuneP52100016214· 99.8% built
- Vision Ace MHADA3.8 yr overdueVISION ACE · OPP INDIRA SCHOOL NEAR AKSHRA SCHOOL TATHAWADE, PuneP52100026135· 59.1% built
- Skyways Esfera B Wing3.8 yr overdueMoze Associates · Lohegaon, PuneP52100025786· 81.8% built
- WAWLE HEIGHTS3.8 yr overdueDIVYAYASHA BUILDERS PROMOTERS AND DEVELOPERS · BHANGARWADI, PuneP52100016547· 90.9% built
- Sukhwani Celaeno3.8 yr overdueSuresh Totaram Sukhwani · Pimple Saudagar, PuneP52100000325· 32.7% built
- SONAI DADA HEIGHTS3.8 yr overdueK M DEVELOPERS · PUNE, PuneP52100023642· 52.9% built
- SONIGARA KIMAYA3.7 yr overdueSONIGARA SAWANT ENTERPRISES · Ambegaon, PuneP52100012331· filed Jul 2022 → now Nov 2022· 53% built
- Nova3.7 yr overdueMagarpatta City Dev, Co. Pvt. Ltd. · Mundhawa, PuneP52100021358· 86.4% built
- 2Elite3.7 yr overdueNarayani Buildcon · Chikhli, PuneP52100020832· 90.9% built
- AKSHAY HEIGHTS3.7 yr overdueR R LUNKAD BUILDERS AND PROMOTERS · Wakad, PuneP52100002094· 81.8% built
- Bramha Vantage C3.7 yr overdueBramhacorp Limited · Bavadhan, PuneP52100002254· 85.5% built· 1 complaint
- Kasturi3.7 yr overdueNAKSHATRA BUILDCON · kadolkar colony, PuneP52100023848· 90.9% built
- CASA RIO PHASE II3.7 yr overdueYASHODEEP ENGINEERS & BUILDERS · CHIKHALI, PuneP52100024679· 90.9% built
- VIJAY VIHAR3.7 yr overdueCOL. RPS RAWAT · WAGHOLI, PuneP52100009408· filed Dec 2019 → now Dec 2022· 43.3% built· 13 complaints
- Nirmiti 7 Hills3.7 yr overdueNirmiti Properties · Baramati (M Cl), PuneP52100008020· 40.9% built
- SHANKARVINAYAK APARTMENT3.7 yr overdueA AND D CONSTRUCTION · BALEWADI, PuneP52100016973· filed Dec 2020 → now Dec 2022· 81.8% built
- PRAGA SERENE3.6 yr overduePRATIK CONSTR · Katraj, PuneP52100011257· filed Jun 2021 → now Dec 2022· 90.9% built
- Celesta3.6 yr overdueHome Corp & Associates · MOHAMADWADI, PuneP52100004798· filed Jun 2021 → now Dec 2022· 98.2% built
- CASA GRANDE B WING3.6 yr overdueDOLPHIN BUILDCON · RAVET, PuneP52100005682· filed Jun 2021 → now Dec 2022· 85.5% built
- MUDRA3.6 yr overdueClassic Promoters and Builders Private Limited · BIBWEWADI, PuneP52100003715· filed Jun 2021 → now Dec 2022· 90.9% built· 1 complaint
- GATHA AARAMBH3.6 yr overdueSAFFRON PROPERTIES · Haveli, PuneP52100003408· 90.9% built
- Nirman Riverside3.6 yr overdueGururaj Narsinha Joshi · Haveli, PuneP52100016887· 90.9% built
- ASHAINFRA3.6 yr overdueASHAINFRA · SADASHIV PETH, PuneP52100014949· 63.6% built
- HILL VIEW RESIDENCY PHASE I PROJECT II BUILDING A AND B3.6 yr overdueKUMAR BEHARAY PROPERTIES LLP · BEHIND MAHATMA SOCIETY KOTHRUD, PuneP52100014848· 90.9% built
- COMFORT ZONE3.6 yr overdueADITYA SHAGUN DEVELOPERS · BALEWADI, PuneP52100014406· 78.2% built· 1 complaint
- WINDCHIME HOMES PHASE 23.6 yr overdueSUJAY VENTURES · -, PuneP52100004047· filed Jun 2021 → now Dec 2022· 57.5% built
- GRACIA3.6 yr overdueSAGA CHRISHH ASSOCIATES · TALEGAON DABHADE, PuneP52100023014· 27.3% built
- SAIDATTA PARADISE WING A3.6 yr overdueSAI DATTA ENTERPRISES · Chakan, PuneP52100014071· filed Jun 2021 → now Dec 2022· 90.9% built
- ITREND HOMES PHASE-I3.6 yr overdueHighpoint Landmark LLP · Man, PuneP52100001119· 90.9% built
- Peace Paradise3.6 yr overdueS P Developers · Ravet, PuneP52100021250· 32.7% built
- Zelam3.6 yr overdueGokhale Constructions · Erandwana, PuneP52100020973· 42.7% built
- EMINENCE PROJECT 13.6 yr overdueNAIKNAVARE DEVELOPERS PVT LTD · VIMAN NAGAR, PuneP52100001061· filed Dec 2019 → now Dec 2022· 94.5% built· 4 complaints
- Vishal Viviana3.6 yr overdueVISHAL REALTORS · Mundhawa, PuneP52100000765· 90.9% built
- Legacy Crest3.6 yr overdueLegacy Homes · Jambe- Punawale road, PuneP52100019089· 81.8% built· 1 complaint
- NOVA RESIDENCY3.6 yr overdueAMIT JUGALKISHOR RATHI · BEHIND RAJASHREE SHAU COLLEGE, PuneP52100018498· 95.5% built
- ROYAL EXOTICA PHASE I3.6 yr overdueSVG Builders LLP · KONDHWA BUDRUK, PuneP52100018700· 89.1% built
- ROHAN MADHUBAN II WINGS D E3.6 yr overdueRohan Promoters & Developers · Pune City, PuneP52100002307· 90.9% built· 1 complaint
- ITREND HOMES PHASE II WING B3.6 yr overdueHighpoint Landmark LLP · HINJEWADI, PuneP52100017586· 90.9% built
- Goodwill Unique Zest County Phase 13.6 yr overdueZENITH BUILDCON · Lohegaon, PuneP52100016454· 90.9% built
- SAHIL OM PARK3.6 yr overdueVAISHNAVI PROMOTERS AND DEVELOPERS · Moshi, PuneP52100011417· filed Dec 2019 → now Dec 2022· 72.7% built
- Green Olive3.6 yr overdueGreen Olive Venture · Hinjewadi, PuneP52100013526· 87.9% built
- AAVISHKAR B, C AND D WING3.6 yr overdueGROW MORE LIFE SPACE · MOSHI PCMC, PuneP52100015644· 44.3% built
- VENKATESH GRAFFITI PHASE 63.6 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAVNAGAR MUNDHWA, PuneP52100021891· 90.9% built
- Blue Ridge - THE LOFTS3.6 yr overdueParanjape Schemes (Construction) Ltd. · Hinjawadi, PuneP52100000060· 99.2% built· 1 complaint
- Harsh Apartment3.6 yr overdueMangaldeep Associates & Developers · Rahatni, PuneP52100025753· 81.8% built
- SHUBHKALASH A WING3.6 yr overdueTULIP DEVELOPERS · SPINE ROAD, PuneP52100017791· 72% built
- Nisarg Vatika Phase II3.6 yr overdueNisarg Ventures · Borhadewadi, PuneP52100020731· 90.9% built
- YashONE Pirangut Phase II3.6 yr overdueVilas Javdekar Eco Homes · Mulshi, PuneP52100023378· 12.7% built
- DOLPHIN VISTA3.6 yr overdueMAHALAXMI ENTERPRISES · CHIKHALI, PuneP52100025219· 90.9% built
- EVEREST PLAZA3.6 yr overdueCHOICE DEVELOPERS · JADHAVWADI, PuneP52100002269· 90.9% built· 1 complaint
- GREEN COUNTY3.6 yr overdueANAND DEVELOPERS · Haveli, PuneP52100004407· 64.8% built
- Pelican Phase B3.6 yr overdueLaukik Construction Company · Pirangut, PuneP52100000949· filed Dec 2019 → now Dec 2022· 42.9% built· 1 complaint
- Lords Estate3.6 yr overdueMountview Properties LLP · Pune City, PuneP52100012004· 62.6% built
- SUNAND APARTMENT PHASE I3.6 yr overdueARCHWAY PROPERTIES · SADASHIV PETH, PuneP52100021064· 86.8% built
- SURATWALA MARK PLAZZO - WING B - PHASE 13.6 yr overdueSURATWWALA BUSINESS GROUP LIMITED · HINJAWADI, PuneP52100017784· 79.5% built· 1 complaint
- SHREE SWAMI SAMARTH APARTMENT PH-II3.6 yr overdueSUMAN ASSOCIATES · Shirur, PuneP52100014970· 66.8% built
- GALAXY CITY3.6 yr overdueJITU PROPERTIES & DEVELOPMENTS PVT LTD · Lonavala (M Cl), PuneP52100001605· filed May 2018 → now Dec 2022· 89.1% built
- WINDSOR TOWER3.6 yr overdueS AND S ENTERPRISES · PUNE, PuneP52100020138· 90.9% built
- MISTY GREENS3.6 yr overduePruthvi Developers · PATILNAGAR, PuneP52100017679· 90.9% built
- Nilay3.6 yr overdueSiddhivinayak Developers · Haveli, PuneP52100002147· 78.8% built· 1 complaint
- Godrej Elements3.6 yr overduePearlite Real Properties Private Limited · Godrej Elements, PuneP52100016626· 89.1% built· 5 complaints
- NIRVANA BEYOND B WING3.6 yr overdueDIAMOND NEXUS PROPERTIES · KATALE WASTI, PuneP52100019054· 90.5% built
- AVIOR AATMAN3.6 yr overdueAVIORENTERPRISES LLP · Pune City, PuneP52100019192· 81.8% built
- SUYOG SADAN3.6 yr overdueSUYOG BUILDERS · PANCHSHIL NAGAR, PuneP52100032390· 90.9% built
- Amrutdhara A building3.6 yr overdueLunkad Gruh Nirman Company · Sai Mandir Wadmukhwadi, PuneP52100021533· 90.9% built
- Shri Gurudev Samrajya E Wing3.6 yr overdueVaishanavi Builders and Developers · Khed, PuneP52100028115· 42.7% built
- Puraniks Abitante Phase 1B3.6 yr overduePuranik Buildcon Private Limited · Bavadhan BK, PuneP52100000569· 90.9% built
- Marvel Piazza phase -013.6 yr overdueMARVEL ZETA DEVELOPERS PVT LTD · LOHGAON, PuneP52100003653· filed Jun 2021 → now Dec 2022· 61.1% built· 27 complaints
- KINGSBURY PHASE I3.6 yr overdueJaikul Associates · CHARHOLI, PuneP52100001994· 96.8% built· 2 complaints
- SAVERA-23.6 yr overdueVIZION CONSTRUCTION · Junnar, PuneP52100021478· 81.8% built
- ROHAN ABHILASHA BUILDING D3.6 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100000673· 90.9% built· 1 complaint
- Legacy bliss3.6 yr overdueWhite Properties · Wakad, PuneP52100015391· 90.9% built
- SYLVAN HEIGHTS H BUILDING3.6 yr overdueNAIKNAVAREDEVELOPERSPVTLTD · AUNDH, PuneP52100021048· 66.4% built
- Nivara Nere Part-13.6 yr overdueBVG Five Elements Shelters · Nere, PuneP52100014012· 90.9% built
- Nirman Ajinkyatara Wing C3.6 yr overdueNIRMAN DEVELOPERS · Ambegaon Budruk, PuneP52100013288· 32.7% built
- NISHIGANDHA PARK PHASE 13.6 yr overdueM/S ARCHWAY ESTATES · Kothrud, PuneP52100005610· filed Dec 2018 → now Dec 2022· 61.4% built· 1 complaint
- INTERNATIONAL BUSINESS BAY3.6 yr overdueSAKET DILIP SHAH · Pune City, PuneP52100021989· 90.9% built
- WHITE STONE B BLDG3.6 yr overdueKASHINATH SOPAN DABHADE · WAGHOLI, PuneP52100006439· filed Jun 2021 → now Dec 2022· 34.1% built
- Sai Park3.6 yr overdueRachana Constructions · Haveli, PuneP52100011387· filed Jun 2019 → now Dec 2022· 70% built
- FLORIDA3.6 yr overdueEKTA HOUSING PRIVATE LIMITED · UNDRI, PuneP52100015426· 0% built
- La Ventana Phase 23.6 yr overdueLAVENTANA LLP · Kondhwa, PuneP52100021496· 90.9% built
- YOU57 TOWER A3.6 yr overdueSANAS DEVELOPERS PRIVATE LIMITED · HINJEWADI, PuneP52100021770· 84.4% built· 1 complaint
- Palladio Phase 23.6 yr overdueVilas Javdekar Eco Developers Pvt. Ltd. · behind D Y Patil college, PuneP52100017306· 91.5% built
- CLOVER HILLS PLAZA3.6 yr overdueClover Buildcorp · NIBM road, PuneP52100002324· 50% built
- HIRBAN RESIDENCY3.6 yr overdueHIR BAN PROMOTERS AND DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100010961· filed Jun 2019 → now Dec 2022· 73.3% built
- FUSION TOWERS PHASE II3.6 yr overdueRAMA SYNERGY SPACES · Hinjawadi - Phase III, PuneP52100019797· 98.2% built· 2 complaints
- Mangal Vishwa - Phase 23.6 yr overdueG.T.DEVELOPERS · Kiwale, PuneP52100018839· 90.9% built
- MARVEL SERA A,B,C BUILDING3.6 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Hadapsar, PuneP52100001878· 0% built· 9 complaints
- The Onyx3.6 yr overdueVastukalp Promoters And Builders · WAKAD, PuneP52100001650· filed Feb 2019 → now Dec 2022· 81.8% built· 5 complaints
- LA ROYALE - A BUILDING3.6 yr overdueDEVI SHAKTI REALTY LLP · UNDRI, PuneP52100012441· 18.2% built· 1 complaint
- Tinsel Town Phase II3.6 yr overdueNew World Realty LLP · Maan, PuneP52100017178· 99.5% built
- Aapla Ghar Chakan Phase II3.6 yr overdueMaple Estates · Nanekarwadi (CT), PuneP52100004796· 87.9% built
- ANIKA REGALIA3.6 yr overdueArun Pitamber Sheth · GULTEKADI, MUKUNDNAGAR, PUNE, PuneP52100019498· 93.6% built
- Pari Towers3.6 yr overdueUrban Homes Realty · Narhe, PuneP52100002767· filed Jun 2021 → now Dec 2022· 90.9% built· 2 complaints
- MEMORIES 90 - COMMERCIAL3.6 yr overdueM/s NAMO DEVELOPERS · Mohammadwadi Pune, PuneP52100013482· 94.2% built
- SWAPNA RATNA3.6 yr overdueJADHAV ASSOCIATES · DEFENCE COLONY, PuneP52100019026· 90.9% built
- Richmond Park3.6 yr overdueLA CASA SHELTERS LLP · Rahatani, PuneP52100001358· filed Jun 2021 → now Dec 2022· 96.7% built
- COMFORT ZONE PLUS3.6 yr overdueADITYA SHAGUN DEVELOPERS · BALEWADI, PuneP52100014407· 90.9% built
- BLUE EMPIRE3.6 yr overdueBLUEBERRY DEVELOPERS · NEAR FOREST VIEW SOC., PuneP52100020878· 90.9% built
- NISARG TULIPS3.6 yr overdueADITYA SHAGUN DEVELOPERS · BAVDHAN, PuneP52100014405· 70% built
- ABHIMAN SHRI3.6 yr overdueRATNADEEP PRAMOTERS AND BUILDERS · Charholi Khurd, PuneP52100014831· filed Dec 2021 → now Dec 2022· 99.1% built
- Life Republic Sector R16 - 16th Avenue3.6 yr overdueKOLTE-PATIL INTEGRATED TOWNSHIPS LIMITED · Jambe, PuneP52100009640· 90.9% built· 1 complaint
- Itrend Homes Phase III3.6 yr overdueHighpoint Landmark LLP · Hinjewadi, PuneP52100022236· 62.7% built
- Nirman Aura Wing B3.6 yr overdueGALAXY HILL PARADISE LLP · Ambegaon Budruk, PuneP52100014502· 90.9% built
- AAKAR INDIGO3.6 yr overdueAAKAR REALTIES · CHOVISAWADI, PuneP52100018758· 90.9% built
- AVIOR -AATMAN PHASE -II3.6 yr overdueAVIORENTERPRISES LLP · Pune City, PuneP52100019422· 81.8% built
- addressOne - Phase 13.6 yr overduePeninsula Land Limited · Nr Maharashtra Cricket Association Stadium, Gahunje Pune, PuneP52100015756· 69.2% built· 4 complaints
- Geras Imperium Oasis3.6 yr overdueGera Developments Private Limited · Pimpri Waghere Pune, PuneP52100015514· 81.8% built· 5 complaints
- Aangan Phase II3.6 yr overdueGalaxy Associates · Mawal, PuneP52100019915· 2.3% built
- VISTARA3.6 yr overdueBuildstrong Estate Realtors LLP · Chikhali, PuneP52100022491· 90.9% built
- Kalpataru Serenity - Bldg. 53.6 yr overdueKalpataru Gardens Pvt. Ltd. · Pune, PuneP52100001267· 88.6% built· 3 complaints
- MELANGE RESIDENCES - PHASE IV3.6 yr overdueRAMA SYNERGY SPACES · Hinjawadi Phase III, PuneP52100025451· 94.5% built
- Dynamic Grandeur3.6 yr overdueDYNAMIC REALTY ENTERPRISES · UNDRI, PuneP52100001831· 12.3% built
- HILLSIDE RESIDENCY3.6 yr overdueRAJSHREE LANDMARK LLP · OFF DUDULGAON, PuneP52100018135· 53.6% built
- THE SKYLARK PHASE 13.6 yr overdueMOHISHA REALTORS LLP · KIWALE, PuneP52100015274· 97.3% built· 7 complaints
- SAI DARSHAN3.6 yr overdueSAI SHRUTI DEVELOPERS · Haveli, PuneP52100004582· 81.8% built
- PARIMAL3.6 yr overdueRANADE REALTORS LLP · ERANDAVANE, PuneP52100023048· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.